| Plan Review Notes For Project Z17060018 |
| Project Number |
Z17060018 |
|
| Review Stop |
STORM |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2018-01-05 16:02:20 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | SENIOR PLANNER'S 12/19/2017 REVIEW PACKAGE: | | | | | | 1. THE PROPOSED GRAVITY WALL ALONG THE EAST PROPERTY | | | LINE CANNOT EXTEND PAST THE PROPERTY LINE. REVISE | | | PERIMETER ELEVATION DETAIL "PE2" TO: (A) SHOW THE | | | VERTICAL FACE OF THE GRAVITY RETAINING WALL AT OR WEST | | | OF THE EAST PROPERTY LINE AND THE SLOPED FACE TOWARD | | | THE INTERIOR OF THE SITE; OR (B) SHOW THE GRAVITY | | | RETAINING WALL SHIFTED TO THE WEST SO THAT IT IS | | | ENTIRELY WITHIN THE PROPERTY. CONSIDER THAT A TEMPORARY | | | CONSTRUCTION EASEMENT MAY BE NEEDED FROM THE ADJACENT | | | PROPERTY OWNER IN ORDER TO CONSTRUCT THE GRAVITY WALL | | | ON THE PROPERTY LINE. THESE REVISIONS CAN BE SHOWN WHEN | | | THE PLANS ARE SUBMITTED FOR ENGINEERING PERMIT. | | | | | | 2. FOR ENGINEERING PERMIT APPROVAL, AN EROSION AND | | | SEDIMENT CONTROL PLAN WILL BE REQUIRED. | | | | | | 3. DRAINAGE CALCULATIONS WILL NEED TO BE SUBMITTED WITH | | | THE ENGIENERING PERMIT APPLICATION AND WILL NEED TO | | | INCLUDE SITE SPECIFIC EXFILTRATION RATES. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 |
| |
Print |
|