| Plan Review Notes For Project Z17060018 |
| Project Number |
Z17060018 |
|
| Review Stop |
SURVEY |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2017-07-12 08:13:35 | 1. NO PRELIMINARY ENGINEERING PLANS PROVIDED. | | | 2. UTILITY DEPT. WILL DETERMINE POINT OF CONNECTIONS TO | | | WATER AND SEWER SYSTEM. | | | 3. VERTICAL DATUM NEEDED ON SURVEY. EXISTING CLEAN-OUT | | | ON SITE PLAN NOT SHOWN ON SURVEY. | | | 4. WILL STORM DRAINAGE BE CONNECTED TO ANY OUTFALL? | | | 5. WHAT TYPE OF SURFACE IS PROPOSED FOR THE OUTDOOR | | | STORAGE? |
| |