Plan Review Notes
Plan Review Notes For Project Z17060014
Project Number Z17060014
Review Stop TRAFFIC
Sequence Number 2
Notes
Date Text
2017-08-03 18:11:341) IS IT POSSIBLE TO INCORPORATE GREEN STORMWATER
 INFRASTRUCTURE INTO THE BUFFER AREA? THIS MAY BE LOWER
 COST THAN THE PROPOSED EXFILTRATION TRENCH IN THE
 PARKING LOT.
 2) AT THE LAST PPRC MEETING, FIRE RESCUE STATED THAT
 THE CIRCLE IN THE PARKING LOT DID NOT NEED TO BE SIZED
 FOR FIRE VEHICLES. CONSIDER REDUCING THE TRAFFIC CIRCLE
 TO ACCOMODATE THE TURNING MOVEMENT RADIUS OF THE AASHTO
 PASSENGER VEHCILE. THIS WOULD RESULT IN ADDITIONAL
 GREEN SPACE.
 3) THE STRIPING AT THE INTERSECTION OF N. FLAGLER DRIVE
 AND 59TH STREET RESULTS IN CONFUSION AND CONFLICTS.
 REMOVAL OF UNNEEDED ASPHALT IN THE GORED OUT AREA WOULD
 BE BENEFICIAL. A SKETCH HAS BEEN EMAILED TO THE TRAFFIC
 ENGINEERS.
 4) CONSIDER HOW THE EXISTING BIKE LANE ON N. FLAGLER
 WILL BE TERMINATED. PERHAPS IT COULD CONTINE ONTO A
 WIDE MULTIMODAL PATH TO THE MANATEE CENTER. THIS WOULD
 ALLOW FOR PATRONS TO ACCESS THE CENTER UTILIZING
 NON-AUTOMOTIVE MODES.
 5) IS IT POSSIBLE TO MEANDER A PATHWAY THROUGH THE
 BUFFER AREA? THE WIDTH OF THE EXISTING SIDEWALK BEHIND
 THE CURB DOES NOT MEET STANDARDS.
  
 ERIK FERGUSON, P.E.