| Plan Review Notes For Project Z17050039 |
| Project Number |
Z17050039 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2017-07-21 09:08:49 | THE COMMENTS BELOW ARE BASED UPON THE REVIEW OF THE | | | JUNE 28, 2017 SUBMITTAL PACKAGE. | | | | | | 1. THE DRAINAGE CALCULATIONS SHOULD REFERENCE THE SAME | | | VERTICAL DATUM AS THE PLANS (NAVD1988). | | | | | | 2. DRAINAGE CALCULATIONS SHOW A 1" RISE IN THE 25-YEAR | | | 3-DAY PEAK STAGE. DESIGN A PERIMETER BERM TO CONTAIN | | | THIS STAGE INCREASE TO THE PROJECT AREA OR PROVIDE | | | ADDITIONAL ONSITE STORAGE TO LOWER THE PEAK STAGE TO | | | EXISTING CONDITIONS. | | | | | | 3. THE SWALE ON THE LEFT SIDE OF SECTION A-A ON SHEET | | | PDD-1 IS SHOWN TO HAVE A SIDE SLOPE OF 20:1 SLOPE | | | BETWEEN THE SWALE CENTERLINE AND THE MATCHING SLOPE | | | ALONG THE EDGE OF THE SECTION. THE PROPOSED SWALE | | | CENTERLINE SPOT GRADES OF 14.9 AND 14.7 APPEAR TO BE | | | HIGHER THAN THE EXISTING GRADES TO THE WEST OF THE | | | SWALE. | | | | | | 4. THE SPOT GRADES OF 15.4 AND 15.2 FOR THE CENTERLINE | | | OF THE EAST SWALE APPEAR TO BE ABOVE THE MATCHING GRADE | | | ALONG THE EAST SIDE OF THE SWALE. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 |
| |
Print |
|