| Date |
Text |
| 2017-06-20 15:18:59 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP:// |
| | WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER |
| | MITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS WERE GENERATED FROM THE REVIEW |
| | OF THE PLANS INCLUDED IN THE JUNE 8, 2017 REVIEW |
| | PACKAGE: |
| | |
| | 1. LABEL THE VERTICAL DATUM ON THE GRADING AND DRAINAGE |
| | PLAN SHEET AND SECTIONS SHEET. |
| | |
| | 2. COVER SHEET OF ENGINEERING PLANS INDICATE THE |
| | VERTICAL DATUM IS NAVD 1988. THE CITTY'S DATUM IS NGVD |
| | 1929. PROVIDE THE CONVERSION BETWEEN THE TWO VERTICAL |
| | DATUMS WHEREVER NAVD 1988 IS SHOWN. |
| | |
| | 3. INDICATE WHAT WILL HAPPEN TO THE TEST WELL. |
| | |
| | 4. THE LANDSCAPE PLAN SHOWS INLETS AND STORM PIPE FOR |
| | THE DRY RETENTION AREA. THESE ARE NOT SHOWN ON THE |
| | ENGINEERING PLANS. THE UTILITIES SHOWN ON THE LANDSCAPE |
| | PLANS AND ENGINEERING PLANS SHOULD MATCH. |
| | |
| | 5. INDICATE IF PROJECT AREA IS SUBJECT TO THE C-51 |
| | BASIN RULE FOR FILL WITHIN THE FLOOD PLAIN. |
| | |
| | 6. PROVIDE DRAINAGE CALCULATIONS SIGNED AND SEALED BY A |
| | PROFESSIONAL ENGINEERING DEMONSTRATING THE PROJECT |
| | MEETS SFWMD CRITERIA FOR WATER QUALITY AND WATER |
| | QUANTITY RUNOFF. |
| | |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |