Plan Review Notes
Plan Review Notes For Project Z17040019
Project Number Z17040019
Review Stop TRAFFIC
Sequence Number 4
Notes
Date Text
2017-10-17 08:19:44PASSED WITH CONDITION THAT THE APPLICANT CONSIDER OTHER
 BICYCLE AND PEDESTRIANS OPTIONS FOR CECIL AVENUE. THESE
 OPTIONS WOULD PROVIDE BIKE AND PEDESTRIANS FACILITIES
 AT A LOWER COST TO THE APPLICANT WITH LESS IMPERVIOUS
 AREA.
  
 OPTION 1 - INSTEAD OF TWO FOUR BIKE LANES AND A 5'
 SIDEWALK, THE TRANSPORTATION DIVISION BELIEVES A
 SINGLE10' TO 12' WIDE SHARED USE PATH WOULD BE
 SUFFICIENT FOR BOTH BIKES AND PEDESTRIANS. THE PATH
 SHOULD PREFERABLY BE SEPARATED (E.G. TREE LINED GRASS
 STRIP, TRAFFIC SEPARATOR) OR COULD USE TUBULAR
 DELINATORS WITH A GORED OUT AREA WITH PAVEMENT MARKINGS
 IF THE INTENT IS TO MAXIMIZE THE USE OF THE EXISTING
 ASPHALT PAVEMENT. THE SHARED USE PATH CONCEPT SHOULD
 REDUCE CONSTRUCTION COST OVER THE CURRENT PROPOSAL.
  
 OPTION 2 - ONE OF THE BIKE LANES COULD BE PLACED ON THE
 NORTH SIDE OF THE ROAD AND THE TRAVEL LANE COULD THEN
 BE REDUCED FROM ITS CURRENT 16' WIDTH. THIS OPTION
 WOULD ALSO REDUCE THE AMOUNT OF ASPHALT, BUT WOULD
 REQUIRE A SECOND PEDESTRIAN GATE AT MILITARY TRAIL.
  
 ERIK D. FERGUSON, P.E.
 SENIOR PROJECT ENGINEER