Notes
Date Text
2017-08-03 17:05:57THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE JUNE
 29, 2017 SUBMITTAL PACKAGE:
 1. THE PRELIMINARY ENGINEERING EXHIBIT SHOWS PROPOSED
 DRY DETENTION BASINS ALONG CECIL AVE AND AT THE SOUTH
 END OF THE ATHLETIC FIELD.
 A. WILL THESE BE DETENTION BASINS OR RETENTION BASINS?
  
 B. IF DETENTION BASINS, WHERE IS THE OFFSITE OUTFALL?
  
 C. HOW WILL THE WEST AND EAST BASINS ALONG CECIL AVE BE
 CONNECTED?
  
 2. HOW IS THE RUNOFF FROM CECIL AVE BEING COLLECTED?
  
 3. HAVE YOU CONSIDERED ELIMINATING THE NORTH-SOUTH
 STORM PIPES ON EITHER SIDE OF THE ATHLETIC FIELD AND,
 INSTEAD, CONNECT THE YARD DRAINS AT THE SE AND SW
 CORNERS OF THE ATHLETIC FIELD TO THE INLET IN THE DRY
 DETENTION BASIN?
  
 4. PRELIMINARY ENGINEERING DRAWING LISTS 1.529 FEET AS
 THE DIFFERENCE BETWEEN NAVD 1988 AND NGVD 1929.
 THE TOPOGRAPHIC SURVEY LISTS 1.54 FEET AS THE
 DIFFERENCE BETWEEN NAVD 1988 AND NGVD 1929.
 THESE CONVERSION FACTORS NEED TO BE CONSISTENT.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]