| 2017-05-09 10:48:20 | FROM: RAY CARANCI, LANDSCAPE PLANNER |
| | PROJECT: 711 N ROSEMARY Z17040017 |
| | MAY 9, 2017 |
| | |
| | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND |
| | PROVIDE THE FOLLOWING COMMENTS: |
| | |
| | 1. PLEASE PROVIDE AN OPEN SPACE DIAGRAM AND |
| | CALCULATIONS TO SHOW THE REQUIRED 12% OPEN SPACE TO |
| | MEET THE REQUIREMENTS FOR NWD-5. QUALIFYING OPEN SPACE |
| | MUST MEET THE DEFINITIONS FOUND IN SECTION 94-109, AND |
| | SHOW THAT IT MEETS THE REQUIRED VEGETATED AND CANOPY |
| | AREAS FOR EACH CATEGORY. |
| | |
| | 2. PLEASE VERIFY THAT THE LANDSCAPE BUFFER ADJACENT TO |
| | THE RESIDENTIAL SUBDISTRICT TO THE WEST MEETS ALL |
| | REQUIREMENTS OF SECTION 94-113 (G). |
| | |
| | 3. PLEASE CALCULATE THE REQUIRED NUMBER OF TREES, |
| | FLOWERING TREES, AND SHRUBS FOR THE PROPERTY BASED ON |
| | THE OPEN SPACE PROVIDED PER SECTION 94-113(E)(3). THE |
| | CALCULATIONS SHALL BE MADE USING THE REQUIREMENTS OF |
| | SECTION 94-442(B)(2)B. PLEASE SHOW THE NUMBER OF |
| | REQUIRED AND PROVIDED TREES AND SHRUBS. |
| | |
| | 4. PLEASE ADD STREET TREES ALONG ROSEMARY AND 7TH |
| | STREET AS REQUIRED PER SECTION 94-113 (D). INCLUDE TREE |
| | GRATES, STRUCTURAL SOIL DETAIL AND LOCATION. |
| | |
| | 5. PLEASE PROVIDE A SHADE OR FLOWERING TREE IN ALL |
| | TERMINAL ISLANDS OR LANDSCAPE AREAS ADJACENT TO EACH |
| | ROW OF PARKING PER SECTION 94-113 (F)(2). LIGUSTRUM IS |
| | NOT A SHADE TREE. |
| | |
| | 6. PLEASE PROVIDE LOCATIONS OF LIGHTING ON THE |
| | LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING. |
| | |
| | 7. PLEASE SHOW LOCATIONS OF WATER AND SEWER LINES THAT |
| | SERVICE THE BUILDING, LOCATIONS OF ABOVE GROUND VALVES, |
| | AND LOCATION OF DRAINAGE STRUCTURES ON THE LANDSCAPE |
| | PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING. |
| | |
| | 8. PLEASE SHOW LOCATIONS AND PROVIDE SCREENING FOR ALL |
| | GROUND MOUNTED EQUIPMENT AND UTILITIES. |
| | |
| | 9. PLEASE PROVIDE A ROOT BARRIER DETAIL AND SHOW |
| | LOCATIONS OF ROOT BARRIERS TO PROTECT INFRASTRUCTURE |
| | AND TREES FROM CONFLICTS. THIS INCLUDES WATER, SEWER, |
| | DRAINAGE, SIDEWALKS AND CURBS, AND ANY FIELD STRUCTURES |
| | THAT COULD BE IMPACTED BY TREE ROOTS. |
| | |
| | 10. PLEASE PROVIDE THE TOTAL PERCENTAGE OF LANDSCAPE |
| | AREA. |
| | |
| | 11. PLEASE REMOVE REFERENCE TO STONE AREAS IN PARKING |
| | LOT. GROUNDCOVER MAY BE USED IN PLACE OF SOD TO MEET |
| | THE LANDSCAPE REQUIREMENTS OF SECTION 94- |
| | |
| | 12. PLEASE RECHECK THE CREDITS TAKEN ON THE FLORIDA |
| | FRIENDLY DESIGN OPTIONS CHART. |
| | ? HIGH, MEDIUM AND LOW WATER USAGE AREAS NOT DEFINED |
| | ? NO GRASS AREAS INDICATED, SO CANNOT ESTABLISH CREDIT |
| | ? 51% OF REQUIRED TREES NOT LOW WATER USE. |
| | |
| | 13. DUMPSTER ENCLOSURE DOES NOT MEET LANDSCAPE |
| | SCREENING REQUIREMENTS ALONG THE WEST SIDE. |
| | |
| | |
| | CONDITIONS OF APPROVAL |
| | |
| | 1. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE |
| | STREET TREES AND RIGHT OF WAY LANDSCAPING AND |
| | IRRIGATION APPROVED WITH THIS PETITION. |
| | |
| | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF |
| | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A |
| | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. |
| | |
| |