| Date |
Text |
| 2017-05-08 12:07:31 | CITY OF WEST PALM BEACH |
| | ENGINEERING SERVICES DEPARTMENT |
| | |
| | DATE: 05/08/2017 |
| | |
| | Z17040012: 1101 SOUTH FLAGLER DR. - FIRST BAPTIST |
| | CHURCH PARKING GARAGE (PB CASE NO. 1231H) |
| | |
| | THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE PLAN |
| | APPROVAL: |
| | |
| | 1. WHAT IS THE INTENT OF THE SANITARY SEWER CONNECTION |
| | TO THE PROPOSED PARKING STRUCTURE? PLEASE EXPLAIN. |
| | |
| | 2. WHAT IS THE IRRIGATION PLANS FOR THE LANDSCAPED AREA |
| | AROUND THE PROPOSED PARKING STRUCTURE? IS THERE A |
| | REASON FOR NOT KEEPING/USING THE EXISTING WATER SERVICE |
| | CONNECTIONS AND/OR WATER METERS, THOSE ARE SHOWN ON THE |
| | DEMOLITION PLANS TO BE REMOVED AND ABANDONED UNDER |
| | CHADBOURNE CT.? |
| | |
| | 3. EXISTING WATER AND SANITARY SEWER SERVICES SERVING |
| | THE PROPERTY, IF NOT USED, ARE TO BE CUT AND CAPPED |
| | BACK TO THE MAIN. DE-ACTIVATED/INACTIVE PIPELINES |
| | LARGER THAN 2" DIAMETER SHALL BE REMOVED. |
| | |
| | 4. PROPOSED BACKFLOW PREVENTER FOR THE 6-INCH FIRE LINE |
| | SHALL BE PLACED IN AN ACCESSIBLE AREA AND NOT INSIDE |
| | THE DETENTION BASIN. |
| | |
| | 5. IF A FIRE DEPARTMENT CONNECTIONS (FDC) IS PROPOSED, |
| | THAT SHALL BE PLACED WITHIN 150 FEET OF A FIRE HYDRANT |
| | AND SHALL BE WITHIN AN EASEMENT WITHIN THE PROPERTY. |
| | |
| | 6. ON THE LANDSCAPING PLAN, WHEN SUBMITTED IN THE NEXT |
| | REVIEW PHASE, SHOW LOCATIONS OF ALL WATER METERS, |
| | VALVES, CLEAN-OUTS, LIGHT POLES, ETC. ROOT BARRIERS MAY |
| | BE REQUIRED WHERE PLANTINGS ARE NEAR UNDERGROUND |
| | STORMWATER, SANITARY, OR POTABLE WATER LINES. ALSO |
| | CLEARLY INDICATE ALL EXISTING AND PROPOSED EASEMENTS ON |
| | THE LANDSCAPE PLAN; |
| | |
| | 7. CONTACT THE CITY'S PUBLIC WORKS DEPARTMENT FOR |
| | CANCELLATION OF CURRENT SERVICES FOR SANITATION/GARBAGE |
| | FOR THE EXISTING APARTMENT BUILDING THOSE WILL BE |
| | DEMOLISHED. |
| | AFTER THE SITE PLAN IS APPROVED, IN THE NEXT PHASE, THE |
| | FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL: |
| | |
| | 8. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED FROM THE FOLLOWING WEBSITE LINK: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | 9. PLEASE SUBMIT THE LATEST VERSION OF THE 'AUTO-CALC |
| | CERTIFIED COST ESTIMATE FORM' FOR SUBMISSION TO CITY OF |
| | WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL |
| | WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE |
| | FOLLOWING LINK: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | 10. FIRE HYDRANT FLOW TEST DATA FROM THE CLOSEST |
| | EXISTING FIRE HYDRANT WILL BE REQUIRED PART OF THE PLAN |
| | SUBMITTAL; |
| | |
| | 11. IN THE FINAL PLANS, SHOW CONFLICT INFORMATION |
| | (BOTTOM AND TOP OF CROSSING PIPES) AT THE CONFLICT |
| | POINTS OF ALL WATER, STORM, SANITARY SEWER, IRRIGATION |
| | PIPES AS WELL AS OTHER FRANCHISE UTILITIES. EXISTING |
| | UTILITIES WITHIN THE PROPOSED WATER, SANITARY SEWER AND |
| | FIRE LINES ARE TO BE VERIFIED VIA SOFTDIGS. |
| | |
| | 12. IN THE FINAL WATER AND SEWER PLANS, INCLUDE A NOTE |
| | THAT: AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM |
| | BEACH CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, |
| | MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD |
| | FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI |
| | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL |
| | |
| | 13. SUBMITTAL OF 'RIGHT-OF-WAY' PERMIT AND MAINTENANCE |
| | OF TRAFFIC (MOT) PLANS WILL BE REQUIRED FOR WORK WITHIN |
| | THE RIGHT-OF-WAY PRIOR TO CONSTRUCTION IS AUTHORIZED. |
| | |
| | MOSTAQUE KHAN, P.E. |
| | LAND DEVELOPMENT ENGINEER |
| | [email protected] |
| | 561-494-1124 (OFFICE) |
| | |
| |
Print |