| 2017-04-27 11:52:53 | CASE NO. PB 812O |
| | VILLAGE COMMONS CPD OUTDOOR SEATING MINOR |
| | 831 VILLAGE BOULEVARD |
| | |
| | - CONTACT ERIC SCHNEIDER @ (561) 822-1446 |
| | |
| | - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN |
| | WRITTEN FORMAT. |
| | |
| | - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR |
| | (4) PAPER COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT |
| | OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE |
| | RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS |
| | TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL |
| | COMMENTS. |
| | |
| | - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT |
| | RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS |
| | FROM THE DATE OF THESE COMMENTS (BY JUNE 27, 2017), THE |
| | CASE SHALL BE CONSIDERED WITHDRAWN. ANY FURTHER ACTION |
| | SHALL REQUIRE A NEW DEVELOPMENT APPLICATION. |
| | |
| | - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) |
| | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED |
| | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE |
| | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE |
| | WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($60). |
| | |
| | PROVIDE A JUSTIFICATION LETTER OUTLINING THE REQUESTS |
| | INCLUDED ON THIS MINOR AMENDMENT. |
| | |
| | THE ENGINEERING SERVICES (STORMWATER) DIVISION IS |
| | REQUIRED TO REVIEW PARKING PORTION OF THIS APPLICATION. |
| | THIS REQUIRES AN ADDITIONAL REVIEW FEE OF $212. |
| | |
| | OUTDOOR SEATING |
| | |
| | 1) THE NORTH/SOUTH DIMENSIONS OF THE OUTDOOR SEATING |
| | AREAS SHALL MATCH THE DIMENSIONS FROM THE ARCHITECTURAL |
| | PLAN SUBMITTED FOR BUILDING PERMIT. |
| | |
| | 2) THE REQUIRED PARKING TABLE AND THE SHARED PARKING |
| | CHART NEED TO BE UPDATED TO REFLECT THE ADDITIONAL 196 |
| | SQUARE FEET. |
| | |
| | 3) CHECK THE DIMENSIONS ON THE OUTDOOR SEATING - |
| | ELEVATION DETAIL ON SHEET SP-2. THE SEATING AREAS |
| | INCREASED, YET THE DIMENSIONS SHOWN ON THIS DETAIL DID |
| | NOT. |
| | |
| | ADDITIONAL PARKING |
| | |
| | 1) PROVIDE AN ABSTRACTED SURVEY SHOWING THE AREA OF THE |
| | LIMITS OF WORK. |
| | |
| | 2) THE RELOCATED LOADING ZONE IS REQUIRED TO BE A |
| | MINIMUM OF 10 FEET BY 50 FEET. |
| | |
| | 3) USE OF THE RELOCATED LOADING SPACE MUST BE |
| | COORDINATED TO NOT CONFLICT WITH TRASH AND RECYCLING |
| | PICK-UP. |
| | |
| | 4) THERE IS A DRAINAGE STRUCTURE WHERE THE PROPOSED |
| | PARALLEL PARKING SPACES ARE GOING. PLEASE PROVIDE A |
| | CIVIL PLAN FOR THIS AREA TO ADDRESS HOW THE DRAINAGE |
| | WILL BE AFFECTED. |
| | |
| | 5) TERMINAL ISLAND TREES ARE REQUIRED FOR THE NEW AND |
| | RESTRIPED PARKING SPACES. |
| | |
| | 6) PROVIDE A DRAWING AT A SMALLER SCALE (SUCH AS 1:20) |
| | SHOWING THE WORK AROUND BUILDING NO. 1. THE NEW PLANS |
| | SHALL NOT INCLUDE THE LAYERS OF THE EXISTING FEATURES |
| | (EX. THE LIGHT LINE WEIGHT SCREEN WALL IN THE MIDDLE OF |
| | THE PARKING SPACE ROW). |
| | |
| | 7) PROVIDE THE DIMENSION LINES FOR THE NEW AND REVISED |
| | PARKING SPACES. PLEASE NOTE THAT THE CITY STANDARD FOR |
| | PARALLEL PARKING SPACES IS 8.5 FEET WIDE X 22 FEET |
| | LONG. |
| | |
| | 8) PROVIDE THE DIMENSIONS FOR ALL THE DRIVE AISLES |
| | CONTAINING NEW PARKING SPACES. PLEASE REMEMBER THE 90 |
| | DEGREE PARKING REQUIRES A MINIMUM OF 24 FEET. |
| | |
| | 9) THE PARKING TABLES WERE NOT UPDATED TO SHOW THE NEW |
| | PARKING SPACES. |
| | |
| | 10) THE DUMPSTERS AND COMPACTOR NEED TO BE SCREENED IN |
| | ACCORDANCE WITH CITY REQUIREMENTS. PLEASE PROVIDE |
| | DETAILS ON THE PLANS. |
| | |
| | 11) A LANDSCAPE PLAN IS REQUIRED FOR THE NEW AND |
| | MODIFIED LANDSCAPE AREAS FOR THE NEW PARKING. THE PLAN |
| | SHALL SHOW THAT THE SITE CONTINUES TO MEET THE OVERALL |
| | MINIMUM 15% LANDSCAPE PERCENTAGE. |
| | |
| | 12) PER THE STORMWATER REVIEW: |
| | |
| | A. PROVIDE CIVIL PLANS TO SHOW HOW THE CATCH BASIN WILL |
| | FUNCTION WITH THE NEW PARKING. |
| | B. YOUR CIVIL ENGINEER WILL NEED TO REVIEW THE SFWMD |
| | PERMIT TO ENSURE THAT THE NEW PAVEMENT WILL NOT REQUIRE |
| | A MODIFIED PERMIT. IF A MODIFIED PERMIT IS REQUIRED, IT |
| | WILL NEED TO BE SUBMITTED AT THE TIME OF PERMITTING. |
| | |
| | 13) PER THE FIRE DEPARTMENT, THERE IS NO ISSUE WITH THE |
| | REMOVAL OF THE "FIRE LANE" THAT IS PAINTED ON THE |
| | GROUND; HOWEVER, THE DRIVE AISLE MAY NOT BE REDUCED IN |
| | WIDTH. PLEASE PROVIDE THE CURRENT DIMENSION OF THE |
| | DRIVE AISLE AND, ON THE PLANS, THE DIMENSION AFTER THE |
| | INSTALLATION OF THE PARKING SPACES. |
| | |
| | 14) PER THE SANITATION REVIEW, YOU NEED TO PROVIDE THE |
| | PLANNING DIVISION WRITTEN VERIFICATION FROM THE PRIVATE |
| | FRANCHISE HAULER(S) THAT WILL BE PROVIDING THE |
| | COMPACTOR AND CARDBOARD RECYCLING SERVICES THAT THE |
| | LOCATION OF THE COMPACTOR AND RECYCLING CONTAINERS |
| | PERMIT PICK-UP BY THEIR VEHICLES. |
| | |
| |