| Date |
Text |
| 2017-04-07 14:11:59 | CITY OF WEST PALM BEACH |
| | ENGINEERING SERVICES DEPARTMENT |
| | |
| | DATE: 04/10/2017 |
| | |
| | Z17030019: 335 27TH ST. - DR. ALICE MOORE APARTMENTS |
| | (ISPR NO. 17-01) |
| | |
| | THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | NO CIVIL ENGINEERING PLANS WERE SUBMITTED IN THE |
| | INITIAL SITE PLAN PACKAGE INDICATING STORMWATER CONTROL |
| | AND PLANS FOR WATER AND SEWER SERVICES/CONNECTIONS FOR |
| | THE PROPOSED DEVELOPMENT. FOLLOWING COMMENTS NEED TO BE |
| | ADDRESSED PRIOR TO SITE PLAN APPROVAL: |
| | |
| | 1. A TRAFFIC IMPACT STATEMENT WILL BE REQUIRED TO |
| | DEMONSTRATE THAT THE PROPOSED DEVELOPMENT WOULD NOT |
| | IMPACT THE TRAFFIC PATTERN IN THE VICINITY OF THE |
| | DEVELOPMENT ADVERSELY. PLEASE CONTACT UYEN DANG, CITY'S |
| | TRANSPORTATION ENGINEER AT (561) 494-1087; |
| | |
| | 2. SURVEY AND SITE PLAN HAVE LOT DIMENSIONS THAT ARE |
| | NOT CONSISTENT. PLEASE REVISE SITE PLAN TO CORRECT |
| | DISCREPANCIES DURING NEXT REVIEW/RE-SUBMITTAL. PARKING |
| | SHOWN ON THE 27TH ST. CANNOT BE PRIVATE. ONLY PUBLIC |
| | PARKING WITH METER WILL BE ALLOWED ON CITY'S |
| | RIGHT-OF-WAY. PLEASE CONTACT UYEN DANG, CITY'S |
| | TRANSPORTATION ENGINEER AT (561) 494-1087 FOR APPROVAL; |
| | |
| | 3. PLEASE SHOW ON THE PLANS, IN THE NEXT REVIEW LEVEL, |
| | HOW WILL THE SITE/BUILDING BE SERVED FOR WATER, SEWER |
| | AND FIRE PROTECTION. SHOW ALL EXISTING UTILITIES WITHIN |
| | THE VICINITY OF THE PROPOSED SITE AS WELL AS PROPOSED |
| | UTILITIES TO SERVE THE DEVELOPMENT (LABEL SIZE AND |
| | MATERIAL OF ALL PIPES AND CONDUITS ETC.); |
| | |
| | 4. SUBMIT ESTIMATES FOR WATER AND FIRE DEMAND, BOTH |
| | AVERAGE AND PEAK FLOW WITH PEAKING FACTOR. ALSO SUBMIT |
| | ESTIMATES OF SANITARY SEWER FLOW FOR THE PROPOSED |
| | DEVELOPMENT; |
| | |
| | 5. THE AVAILABLE WATER PRESSURE IN THIS PORTION OF THE |
| | CITY MAY NOT BE ACCEPTABLE AT ELEVATIONS HIGHER THAN |
| | THE 2ND FLOOR. WE RECOMMEND A LONG-TERM PRESSURE STUDY |
| | BE PERFORMED PRIOR TO FINALIZATION OF THE UTILITY |
| | DESIGN; |
| | |
| | 6. ON THE LANDSCAPING PLAN, WHEN SUBMITTED IN THE NEXT |
| | REVIEW PHASE, SHOW LOCATIONS OF ALL WATER METERS, |
| | VALVES, CLEAN-OUTS, LIGHT POLES, ETC. ROOT BARRIERS MAY |
| | BE REQUIRED WHERE PLANTINGS ARE NEAR UNDERGROUND |
| | STORMWATER, SANITARY, OR POTABLE WATER LINES. ALSO |
| | CLEARLY INDICATE ALL EXISTING AND PROPOSED EASEMENTS ON |
| | THE LANDSCAPE PLAN; |
| | |
| | 7. PLEASE ALSO SHOW ON THE LANDSCAPE PLAN, WHEN |
| | SUBMITTED IN THE NEXT REVIEW PHASE, SHOW THE SIGHT |
| | TRIANGLES FOR THE ALL VEHICULAR EXITS FROM THE SITE. |
| | (SECTION 94-305E, CODE OF ORDINANCES); |
| | |
| | 8. A MAINTENANCE AGREEMENT WILL BE REQUIRED FOR THE |
| | NON-STANDARD ELEMENTS (TREES AND TREE GRATES; PAVERS, |
| | ETC.) PROPOSED WITHIN POINSETTIA AVENUE AND 27TH STREET |
| | RIGHT-OF-WAYS; |
| | |
| | 9. SHOW ON THE SITE PLANS ADA ACCESSIBLE RAMPS ON THE |
| | SIDEWALK AT EACH ENTRANCE AND EXIT /DRIVEWAY APPROACH; |
| | |
| | 10. PLEASE SUBMIT ESTIMATES FOR THE SOLID WASTE |
| | COLLECTION YARDAGE AT THE CONCEPTUAL STAGE. AS PART OF |
| | THE FINAL DESIGN, THIS SOLID WASTE ESTIMATE WILL NEED |
| | TO BE VERIFIED TO VALIDATE APPROPRIATE NUMBER AND SIZE |
| | OF DUMPSTERS/GARBAGE RECEPTACLES. PLEASE SHOW ON THE |
| | PLAN IF A COMPACTOR IS |
| | PROPOSED TO REDUCE THE YARDAGE OF WASTE THAT WILL NEED |
| | TO BE COLLECTED; |
| | |
| | 11. THE TRASH DUMPSTER/COMPACTORS MUST LOCATED IN AREAS |
| | EASILY SERVICED BY THE CITY SANITATION EQUIPMENT AND |
| | MANPOWER PER SECTION 74-35(A)(5) OF THE CODE OF |
| | ORDINANCES. A 'TRASH ROOM' IS SHOWN ON THE SUBMITTED |
| | SITE PLAN WHICH IS INSIDE THE BUILDING ENCLOSURE; |
| | |
| | 12. IF ROLL OUT TYPE DUMPSTER IS PROPOSED, PLEASE NOTE |
| | ON THE PLANS THAT: "OWNER IS RESPONSIBLE TO ROLL OUT |
| | THE DUMPSTER OUTSIDE THE ENCLOSURE TO THE OPEN SPACE |
| | PRIOR TO CITY'S SANITATION CREW PICK UP GARBAGE". |
| | CITY'S FRONT LOADING SANITATION/GARBAGE TRUCKS NEED AT |
| | LEAST 25-FEET VERTICAL CLEARANCE FOR TIPPING THE |
| | GARBAGE RECEPTACLES/BINS OVER IT; |
| | |
| | 13. FOR SANITATION/GARBAGE COLLECTION CONTACT THE |
| | CITY'S PUBLIC WORKS DEPARTMENT. FINAL APPROVED SITE |
| | PLANS NEED TO SHOW PROPOSED SANITATION COLLECTION PLANS |
| | AND DETAILS; AND WILL NEED APPROVAL FROM PETER BIENIEK, |
| | PUBLIC WORKS DIRECTOR. IF A SEPARATE ON-SITE LOCATION |
| | IS CHOSEN FOR STANDARD DUMPSTER, PLEASE INCLUDE THE |
| | CITY OF WEST PALM BEACH STANDARD DETAIL FOR THE |
| | DUMPSTER ENCLOSURE ON THE PLANS. MINIMUM DIMENSIONAL |
| | (E.G. THE GATE WIDTH MUST BE A MINIMUM OF 12.5 FEET) |
| | REQUIREMENTS FOR THE ENCLOSURE ARE LISTED IN CODE OF |
| | ORDINANCES, SECTION 94-444(B) OF THE CODE OF |
| | ORDINANCES. CITY STANDARD DETAIL GC-8 MAY BE DOWNLOADED |
| | AT: |
| | |
| | HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEE |
| | RING-STANDARDS/ |
| | |
| | 14. PLEASE PROVIDE AN AUTOTURN ANALYSIS DEMONSTRATING |
| | THE SOLID WASTE COLLECTION VEHICLE CAN ACCESS AND |
| | MANEUVER WITHIN THE PROPOSED DEVELOPMENT. |
| | AFTER THE SITE PLAN IS APPROVED, IN THE NEXT PHASE, THE |
| | FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL: |
| | |
| | 15. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION |
| | WILL BE REQUIRED FROM THE ENGINEERING SERVICES |
| | DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL |
| | APPLICATION FORMS CAN BE DOWNLOADED FROM THE FOLLOWING |
| | WEBSITE LINK: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | 16. PLEASE SUBMIT THE LATEST VERSION OF THE 'AUTO-CALC |
| | CERTIFIED COST ESTIMATE FORM' FOR SUBMISSION TO CITY OF |
| | WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL |
| | WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE |
| | FOLLOWING LINK: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | 17. SUBMIT WITH THE ENGINEERING DEVELOPMENT APPROVAL |
| | APPLICATION SIGNED & SEALED ENGINEER/MEP WATER AND |
| | SANITARY SEWER CALCULATION (IN DETAIL I.E. AVERAGE AND |
| | PEAK WITH PEAKING FACTOR). SUBMIT CALCULATIONS TO |
| | VALIDATE METER SIZE SELECTION. SHOW THESE CALCULATIONS |
| | ON THE UTILITY PLAN SHEET AS WELL; |
| | |
| | 18. SHOW ON THE FINAL PLANS WHERE ARE THE PROPOSED |
| | WATER AND SANITARY SEWER LINES ARE CONNECTED TO |
| | EXISTING WATER AND SEWER MAINS ON THE PRESIDENTIAL WAY; |
| | |
| | 19. SHOW THE NEAREST FIRE HYDRANT TO THIS SITE ON THE |
| | FINAL UTILITY PLAN. FIRE HYDRANT FLOW TEST DATA FROM |
| | EXISTING FIRE HYDRANT WILL BE REQUIRED PART OF THE PLAN |
| | SUBMITTAL; |
| | |
| | 20. PLEASE INCLUDE THE LATEST VERSION OF THE APPLICABLE |
| | CITY OF WEST PALM BEACH STANDARD UTILITY DETAILS TO THE |
| | DETAIL SHEET/S DURING SUBMISSION OF THE FINAL |
| | ENGINEERING PLANS. CONTACT THE ENGINEERING SERVICES |
| | DEPARTMENT FOR THE LATEST REVISED DETAILS IN CAD |
| | FORMAT. CITY'S STANDARD DETAILS (IN PDF FILE FORMAT) |
| | CAN BE DOWNLOADED FROM THE FOLLOWING SITE: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | 21. PLACEMENT OF THE ANY PROPOSED METER, BACKFLOW |
| | PREVENTER, DCDA ETC. SHALL BE INSTALLED PER THE CITY'S |
| | STANDARD DETAILS. WATER METER SHOULD BE WITHIN THE |
| | RIGHT-OF-WAY OR INSIDE AN 'UTILITY EASEMENT' JUST |
| | INSIDE THE PROPERTY NEAR THE RIGHT-OF-WAY AND |
| | ACCESSIBLE; |
| | |
| | 22. IN THE FINAL PLANS, SHOW CONFLICT INFORMATION |
| | (BOTTOM AND TOP OF CROSSING PIPES) AT THE CONFLICT |
| | POINTS OF ALL WATER, STORM AND SANITARY SEWER PIPES AS |
| | WELL AS OTHER FRANCHISE UTILITIES. EXISTING UTILITIES |
| | WITHIN THE PROPOSED SANITARY SEWER LATERAL ARE TO BE |
| | VERIFIED VIA SOFTDIGS AND PROVIDE ALL UTILITY CROSSING |
| | INFORMATION; |
| | |
| | 23. IN THE FINAL PLANS, SHOW DIRECTION OF FLOW FOR THE |
| | EXISTING SANITARY SEWER. SHOW INVERT AT CONNECTION |
| | POINTS AND INCLUDE A PROFILE FOR THE PROPOSED SERVICE |
| | LATERAL WITH GROUND ELEVATIONS ABOVE THE PIPE; |
| | |
| | 24. PAVEMENT RESTORATION FOR OPEN CUT/TRENCH FOR |
| | UTILITY CONNECTION WORKS WILL NEED TO BE IN ACCORDANCE |
| | WITH CITY STANDARD DETAIL GC-9. THE ROAD SHALL BE |
| | MILLED/RESURFACED FOR FULL LANE WIDTH OF THE TRAVEL |
| | LANE(S) ENCROACHED BY THE TRENCH AREA, INCLUDING A |
| | TRANSITION AREA OF 50 FEET ON EACH SIDE OF THE TRENCH. |
| | PLEASE SHOW ON THE FINAL PLANS THE EXTENT OF THE |
| | MILLING AND RESURFACING; |
| | |
| | 25. SHOW ON THE FINAL PLANS SIZE AND MATERIAL OF ALL |
| | EXISTING UTILITIES ON POINSETTIA AVENUE AND 27TH STREET |
| | INCLUDING BUT NOT LIMITED TO WATER, SEWER, GAS, |
| | UNDERGROUND ELECTRIC CONDUITS ETC. PLEASE IDENTIFY THE |
| | SOURCE OF THE AS-BUILT INFORMATION UTILIZED FOR THE |
| | POTABLE WATER, SANITARY SEWER, AND STORM SEWER DESIGN; |
| | |
| | 26. FOR THE FINAL WATER AND SEWER PLANS, INCLUDE A NOTE |
| | THAT: AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM |
| | BEACH CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, |
| | MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD |
| | FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI |
| | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL |
| | |
| | 27. ALL PROPOSED FIRE DEPARTMENT CONNECTIONS SHALL BE |
| | WITHIN 150 FEET OF A FIRE HYDRANT AND SHALL BE WITHIN |
| | AN EASEMENT WITHIN THE PROPERTY. LANDSCAPE PLAN SHALL |
| | SHOW LOCATIONS OF ALL WATER METERS, VALVES, CLEAN-OUTS, |
| | LIGHT POLES, ETC. ROOT BARRIERS MAY BE REQUIRED WHERE |
| | PLANTINGS ARE NEAR UNDERGROUND STORMWATER, SANITARY, OR |
| | POTABLE WATER LINES. |
| | |
| | |
| | MOSTAQUE KHAN, P.E. |
| | LAND DEVELOPMENT ENGINEER |
| | [email protected] |
| | 561-494-1124 (OFFICE) |
| | |
| |
Print |