| 2020-10-23 16:44:58 | 1. SATISFIED- / SHEET A0.102 LIST BUILDING FOOTPRINT |
| | REQUIREMENT AS MINIMUM PERCENTAGE, IT IS A MAXIMUM |
| | PERCENTAGE. PLEASE CORRECT DATA TO ACCURATELY REFLECT |
| | REQUIREMENT. |
| | 2. PARTIALLY SATISFIED - PLEASE LIST THE REQUIRED GUEST |
| | PARKING FOR THE MICROUNITS.- / SHEET A0.102 STILL LIST |
| | 328 RESIDENTIAL UNITS WITHIN THE PROJECT DESCRIPTION |
| | AND THE REQUIRED PARKING DATA. PLEASE ADJUST TO THE |
| | CURRENT PROPOSAL OF 230 UNITS. TABLE IN THE SAME SHEET |
| | LIST 202 REGULAR RESIDENTIAL UNITS AND 23 MICRO UNITS |
| | FOR A TOTAL OF 205 NOT THE NEW 230 LISTED. PLEASE |
| | CORRECT AND ADJUST ALL RELATED CALCULATIONS. SHEET |
| | A0.06 OF SITE PLAN PACKET ALSO HAS DISCREPANCIES. |
| | AVERAGE UNIT SIZE IS LISTED BUT NOT LEGIBLE. |
| | 3. SATISFIED/ IN SHEET A1.500, THE HOTEL UNITS |
| | DESCRIPTION AND AREAS SUITE 1.3C AND 1.3W UNIT AREA IS |
| | NOT LISTED. PLEASE UPDATE TABLE AND INCLUDE INFORMATION |
| | TO CONFIRM COMPLIANCE WITH MINIMUM 350SF UNITS SIZE. |
| | 4. SATISFIED/ PLEASE PROVIDE INFORMATION TO CONFIRM |
| | THAT REGULAR RESIDENTIAL UNITS COMPLY WITH THE AVERAGE |
| | 800SF UNIT SIZE. |
| | 5. SATISFIED/ PLEASE SUBMIT COLORED ELEVATIONS WITH |
| | CALL OUT MATERIALS. |
| | 6. PARTIALLY SATISFIED- PLEASE CHECK THE FAR TABLE |
| | LISTED IN A0.06 AS THE FAR BY USE IN EVENT +RESTAURANT |
| | IS LESS THAN HOTEL RESTAURANT AND PUBLIC MEETING.-/ |
| | PLEASE SUBMIT THE FAR DETAIL INFORMATION PER FLOOR AS |
| | SUBMITTED FOR SITE PLAN APPROVAL. SHEET A0.08 IN SITE |
| | PLAN APPROVAL HAS A TYPO IN THE LEVEL NUMBERS. |
| | 7. NOT SATISFIED- MORE DETAIL IS NEEDED FOR THE GREEN |
| | SCREEN. PLEASE INDICATE PROPOSED PLANT MATERIAL FOR |
| | GREEN SCREEN AND INCLUDE A MAINTENANCE PLAN-/.PLEASE |
| | EXPLAIN HOW THE PLANTS PROPOSED FOR THE GARAGE |
| | SCREENING WILL GROW AND STILL MAINTAIN THE AIR FLOW |
| | REQUIRED FOR GARAGE VENTILATION. |
| | 8. SATISFIED.-PLEASE CONFIRM THE GLASS UTILIZED FOR |
| | THIS PROJECT AT THE GROUND FLOOR IS NOT DARK TINTED OR |
| | REFLECTIVE TO THE POINT THAT THE INTERIOR IS NOT |
| | VISIBLE FROM OUTSIDE. |
| | 9. SATISFIED.-FURTHER DISCUSSION IS NECESSARY FOR THE |
| | SELECTION OF THE LANDSCAPE MATERIAL TO BE LOCATED ON |
| | THE QUADRILLE BLVD MEDIAN. |
| | 10. PARTIALLY SATISFIED-PLEASE INDICATE THE NEW |
| | LOCATION OF THE TROLLEY SHELTER -PLEASE CONFIRM PALM |
| | TRAM APPROVED THE RELOCATION OF THE EXISTING SHELTER TO |
| | THE PROPOSED LOCATION. |
| | 11. SATISFIED- DUE TO THE PROPOSED MICROUNITS PROJECT |
| | IS REQUIRED TO PROVIDE 1 CAR SHARING STATION PER EVERY |
| | 13 MICROUNITS. IF PARKING IS PROVIDED FOR THE |
| | MICROUNITS THERE MUST BE AT LEAST ONE CAR SHARING |
| | STATION ON SITE. PLEASE IDENTIFY LOCATION OF CAR |
| | SHARING STATION INSIDE PARKING GARAGE. |
| | 12. SATISFIED- DUE TO THE PROPOSED MICROUNITS, PROJECT |
| | IS REQUIRED TO CONTRIBUTE A FEE INTO THE TROLLEY |
| | OPERATION FUND. FEE IS EQUAL TO $10 PER UNIT/MONTH. AN |
| | AGREEMENT WILL BE REQUIRED WITH THE PROPERTY OWNER |
| | BEFORE FINAL CO. |
| | 13. SATISFIED- PLEASE IDENTIFY THE LOCATION FOR |
| | MICRO-MOBILITY STATION WITHIN THE PROJECT PUBLIC REALM |
| | AREA. |
| | 14. SATISFIED - MINIMUM ACTIVE USE REQUIREMENT ALONG |
| | DIXIE HWAY IS 80% NOT 79%. PLEASE ADJUST TO CONFIRM |
| | COMPLIANCE. SITE PLAN INFORMATION SHOWS 80% NOT THE |
| | 79%. IN ADDITION, USES BEHIND THE CURB CUT (OUTLINED IN |
| | RED) CANNOT BE COUNTED AS ACTIVE USES FOR THE PURPOSE |
| | OF CALCULATING MINIMUM ACTIVE USE REQUIRED AS THEY ARE |
| | BEHIND THE MINIMUM SETBACK AND NOT ADJACENT TO A PUBLIC |
| | OPEN SPACE. YOU MAY NEED TO EXTEND THE RETAIL A LITTLE |
| | BIT TO THE NORTH TO REDUCE THE GAP. |
| | 15. SATISFIED- THE VARIANCE APPROVED BY THE DAC TO |
| | REDUCE ACTIVE USES ABOVE THE FIRST FLOOR ALONG |
| | QUADRILLE BLVD ALLOWED A REDUCTION FROM 60% TO 47%. |
| | PROPOSED PROJECT LISTS ACTIVE USES ONLY ALONG 31.9%. |
| | PLEASE INCREASE AMOUNT OF ACTIVE USES TO COMPLY WITH |
| | VARIANCE APPROVED. SITE PLAN INFORMATION SHOWS 47% |
| | ACTIVE USES BUT BUILDING PERMIT PACKET SHOWS 31.9%. |
| | PLEASE IDENTIFY WHERE THE DISCREPANCY EXISTS. |
| | 16. SATISFIED- PLEASE PROVIDE A PEDESTRIAN CROSSING |
| | ACROSS DIXIE HWAY FROM THE SE CORNER OF THE PROJECT. |
| | 17. SATISFIED- PLEASE RELOCATE AT LEAST 3 BIKE RACKS |
| | CLOSER TO THE OFFICE TOWER OPEN SPACE, AND RELOCATE AT |
| | LEAST 2 BIKE RACKS TO THE AREA CLOSER TO THE PROPOSED |
| | RETAIL. |
| | 18. SATISFIED- GRADING PLAN SHEET 4 HAS LABELS BLACKED |
| | OUT. |
| | 19. SATISFIED- A SEPARATE LANDSCAPE PERMIT WILL BE |
| | REQUIRED FOR THIS PERMIT. |
| | 20. NOT SATISFIED-/PLEASE PROVIDE INFORMATION TO |
| | CONFIRM COMPLIANCE WITH PLANAR BREAK REQUIREMENT ALONG |
| | ALL FRONTAGES. |
| | FOR ADDITIONAL INFORMAITON PLEASE CONTACT ANA MARIA |
| | APONTE AT 561-822-1439. |
| |