2019-04-17 18:59:26THE COMMENTS BELOW ARE FROM THE REVIEW OF THE APRIL 9,
 2019 REVIEW SUBMITTAL PACKAGE.
  
  
 1. REMOVE / ABANDON THE STORM PIPE CROSSING THE WEST
 END OF 4TH STREET IF THE STORM PIPE IS NOT NEEDED.
  
 2. COORDINATE THE RIM/GRATE ELEVATIONS OF DRAINAGE
 STRUCTURES WITH THE GRADING PLAN. THERE ARE MANY PLACES
 WHERE THE RIM ELEVATION IS TOO LOW COMPARED TO A
 PROPOSED SPOT GRADE ELEVATION 5 FEET AWAY.
  
 3. SPECIFY WHAT THE SPOT GRADES REPRESENT - TOP OF
 CURB, EDGE OF PAVEMENT, SIDEWALK, ETC.
  
 4. GRADE THE PLAZAS TO DRAIN TO ONSITE DRAINAGE SYSTEM
 INSTEAD OF FLOWING INTO RIGHT-OF-WAY. (REPEAT COMMENT)
  
 5. SECTIONS C-C AND F-F SHOW VALLEY GUTTER BUT THESE
 GUTTERS DO NOT APPEAR ON THE GRADING PLAN. (REPEAT
 COMMENT)
  
 6. CONFIRM CURBING AND PAVEMENT WIDTH FOR SECTION D-D.
 (REPEAT COMMENT)
  
 7. LABEL THE DRAINAGE PIPE SIZE CONNECTED TO STRUCTURE
 S-401.
  
 8. CONFIRM SE INVERT OF 0.00 SHOWN FOR STRUCTURE S-104.
 ALSO SHOW THE PIPE.
  
 9. WHY TWO OUTFALL PIPES (EAST AND SOUTH) AT STRUCTURE
 S-201? CONFIRM THERE IS A DRAINAGE MANHOLE TO THE EAST
 OF STRUCTURE S-201.
  
 10. SHOW CORRECT PIPE CONNECTIVITY FOR DRAINAGE
 STRUCTURES ON DIXIE HWY AND 4TH STREET.
  
 11. PROVIDE VIDEO OF EXISTING STORM PIPES ON 4TH
 STREET. SOME PIPES MAY BE VCP.
  
 12. ADD VERTICAL DATUM REFERENCE AND CONVERSION
 EQUATION TO NGVD1929 ON EVERY SHEET WITH ELEVATION
 DATA.
  
 13. ADD THE CONVERSION EQUATION TO NGVD1929 TO GENERAL
 NOTE #7 ON THE COVER SHEET.
  
 14. CALL OUT THE TYPE OF CURB RAMPS AND ADA MATS FOR
 DRIVEWAYS CROSSING SIDEWALK ON 4TH STREET.
  
 15. PROVIDE MINIMUM 5 FEET OF HORIZONTAL CLEARANCE
 BETWEEN SANITARY LATERALS AND DRAINAGE STRUCTURES IN
 THE RIGHT-OF-WAY.
  
 16. RELOCATE EXFILTRATION TRENCHES FROM UNDER PLANTER
 AREAS.
  
 17. INTERCEPT STORMWATER RUNOFF AT ALL DRIVEWAYS AND
 CONVEY TO INTERNAL DRAINAGE SYSTEM.
  
 18. BETWEEN TYPICAL SECTIONS C AND B, THE INTERNAL
 DRIVE GOES FROM INVERTED CROWN TO NORMAL CROWN. HOW IS
 THE STORMWATER RUNOFF COLLECTED?
  
 19. WAS CONSIDERATION MADE TO CONNECT STRUCTURE S-302
 AND S-108 AND ELIMINATE THE PIPE BETWEEN STRUCTURES
 S-301 AND S-201?
  
 20. PROVIDE A DETAIL OF THE CONTROL STRUCTURE SHOWING
 STRUCTURE DIMENSIONS, WHERE THE PIPES ARE COMING INTO
 THE STRUCTURE, WHERE THE WEIR WILL BE LOCATED AND
 ELEVATIONS OF THE INVERTS AND WEIR OVERFLOW.
  
 21. HOW WILL THE LOADING DOCK DRAIN?
  
 22. SHOW UTILITIES (INCLUDING EXFILTRATION TRENCHES) ON
 THE LANDSCAPE PLANS.
  
 23. CIVIL PLAN 5 SIGNING AND MARKING PLAN:
 A. PARKING DIMENSIONS DO NOT LINE UP WITH THE STRIPING
 ON 4TH STREET.
 B. NEED TO CALLOUT STRIPING ON N. DIXIE HWY.
 C. CALLOUT CROSSWALK STRIPING.
 D. RIGHT TURN ONLY SIGN FOR DRIVEWAY TO QUADRILLE BLVD.
 E. RIGHT TURN ARROW STRIPING FOR DRIVEWAY TO N. DIXIE
 HWY.
  
 24. ANY OFFSITE ENGINEERING PLANS?
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved