| 2019-02-13 15:11:31 | 1. PROVIDE COUNTY TPS LETTER. |
| | 2. APPROXIMATELY TWO-THIRD OF THE PARKING SPACES ARE |
| | EITHER TANDEM OR PARKING LIFTS. CLARIFY IF THESE |
| | PARKING SPACES ARE USED BY VALET ONLY. THE TRAFFIC |
| | STUDY ASSUMED ONLY 20% OF TRIPS ARE USING VALET. |
| | 3. THE VALET LANES ON 4TH STREET MAY NOT PROVIDE |
| | SUFFICIENT STORAGE FOR VEHICLES. VALET QUEUE LENGTH OF |
| | 6 VEHICLES REQUIRES THE SECOND VALET LANE BE OCCUPIED, |
| | WHICH MAY BLOCK OTHER EGRESS VEHICLES. ALLOWING |
| | UBER/LYFT IN THE VALET LANES MAY WORSEN THE ISSUES AS |
| | UBER/LYFT VEHICLES MAY OCCUPY THE VALET LANES FOR A |
| | LONGER TIME DURING PICK-UP. VEHICLES BACKUP ON THE |
| | WESTBOUND APPROACH OF QUADRILLE BOULEVARD/4TH STREET |
| | MAY BLOCK EGRESS VEHICLES AND FURTHER EXACERBATE THE |
| | ISSUES. PLEASE ALSO VERIFY THE PERCENTAGE OF VALET |
| | TRIPS IS CONSISTENT WITH THE TYPE OF PARKING SPACES |
| | PROVIDED. |
| | 4. PROVIDE A VALET OPERATION MANAGEMENT PLAN TO DISCUSS |
| | THE DETAILED OPERATIONS OF THE VALET, AND HOW THE QUEUE |
| | ISSUES COULD BE ADDRESSED SHOULD THEY ARISE. THE PLAN |
| | SHOULD DISCUSS THE RUNNING TIME, ROUTE, AND NUMBER OF |
| | VALET STAFF, AS WELL AS THE PLAN OF ACTION SHOULD THE |
| | VALET LANE EGRESS IS BLOCKED BY QUEUED VEHICLES AT |
| | QUADRILLE BOULEVARD/4TH STREET. |
| | 5. IDENTIFY AN AREA INSIDE THE GARAGE WHICH COULD BE |
| | CONVERTED TO AN ADDITIONAL VALET DROP-OFF/PICK-UP AREA |
| | SHOULD THE NEED ARISES. |
| | 6. SHEET A0.06 - CITY CODE SECTION 94-111 PERMITS UP TO |
| | FOUR STANDARD PARKING SPACES TO BE COUNTED TOWARDS THE |
| | PARKING REQUIREMENT WHEN UP TO EIGHT MOTORCYCLE PARKING |
| | SPACES ARE PROVIDED. THEREFORE, THE TOTAL PARKING COUNT |
| | TOWARDS THE REQUIRED PARKING WOULD BE 700. |
| | 7. SHEET A1.05 - PROVIDE THE EQUIVALENCE OF ONE PARKING |
| | SPACE AT THE TERMINUS OF THE DEAD-END AISLE IN WEST |
| | SIDE OF THE GARAGE AS A DEDICATED PULL-IN AREA FOR |
| | TURNING AROUND PER CITY CODE SECTION 94-111. |
| | 8. ON CIVIL PLAN SHEETS 4, 5 AND 6, DARKEN THE LINEWORK |
| | FOR THE PROPOSED CURB. ALSO, THE VALET PICK-UP/DROP-OFF |
| | LANES ON 4TH STREET DOES NOT SHOW PROPOSED PAVEMENT. |
| | PLEASE REVISE. |
| | 9. SHOW SIGNING AND PAVEMENT MARKINGS FOR THE INTERNAL |
| | ROADWAYS AND ALONG 4TH STREET INCLUDING PARKING SPACES. |
| | 10. SHEET 9 SECTION H ? THE RIGHT OF WAY LINE ON THE |
| | SOUTH SIDE OF 4TH STREET DOES NOT APPEAR TO BE AT THE |
| | RIGHT LOCATION. THERE SHOULD BE 9 FEET BETWEEN THE |
| | PARKING LANE AND THE PROPERTY LINE ACCORDING TO THE |
| | CROSS-SECTION. |
| | 11. PROVIDE SIDEWALK EASEMENT FOR THE PORTION OF |
| | SIDEWALK OUTSIDE RIGHT-OF-WAY. |
| | 12. PROVIDE 12-FOOT SIDEWALK BETWEEN THE DRIVEWAY AND |
| | NORTH OF THE PROPERTY ON QUADRILLE BOULEVARD. |
| | 13. PROVIDE ADA-COMPLIANCE CONCRETE LANDING PAD FOR THE |
| | RELOCATED BUS STOP WITH SHELTER ON QUADRILLE BOULEVARD. |
| | 14. IN THE AUTOTURN EXHIBIT, THE PASSENGER CAR RUNS |
| | OVER THE STRIPPED MEDIAN ISLAND AREA JUST OUTSIDE THE |
| | GARAGE ENTRANCE FROM QUADRILLE BOULEVARD. PLEASE MODIFY |
| | THE STRIPING TO DESIGN FOR PASSENGER CARS. PLEASE ALSO |
| | SHOW TWO CONCURRENT PASSENGER CARS MAKING THAT TURN IN |
| | THE OPPOSING DIRECTIONS, AND SHOW THE DIMENSIONS OF THE |
| | VEHICLES USED IN THE AUTOTURN PATHS. |
| | 15. PLEASE REPLACE OR RESET THE PAVERS AT THE DIXIE |
| | HIGHWAY/4TH STREET INTERSECTION AS THE PAVERS WILL BE |
| | IMPACTED DURING MILLING AND RESURFACING. |
| | 16. PROVIDE TDM MEASURES INCLUDING BUT NOT LIMITED TO |
| | THE TDM MEASURES LISTED BELOW. DETAILS OF THE TDM |
| | MEASURES WILL BE DETERMINED BY THE CITY. MONITORING OF |
| | THESE TDM MEASURES WILL ALSO BE REQUIRED. |
| | O UNBUNDLED PARKING/PARKING CASH-OUT PROGRAM |
| | O TRANSIT PASS SUBSIDY |
| | O CONTRIBUTE FUNDING TO TROLLEY OPERATIONS |
| | O LIVE NEAR YOUR WORK PROGRAM |
| | 17. A TROLLEY STOP ALONG DIXIE HIGHWAY WILL BE REQUIRED |
| | AS PART OF THE TDM MEASURES. THE EXACT LOCATION WILL BE |
| | DETERMINED BY THE CITY. |
| | |
| | THE FOLLOWING ITEMS RELATED TO COMMENTS PROVIDED |
| | PREVIOUSLY WILL BE INCLUDED IN THE CONDITIONS OF |
| | APPROVAL: |
| | 1. PROVIDE LANDSCAPED RAISED MEDIAN BETWEEN 4TH STREET |
| | AND DIXIE HIGHWAY ON QUADRILLE BOULEVARD. THE MEDIAN |
| | DESIGN SHOULD PREVENT WESTBOUND VEHICLES FROM MAKING |
| | LEFT-TURNS FROM THE DRIVEWAY. COORDINATE WITH FDOT ON |
| | THE TURN LANE REQUIREMENTS AT QUADRILLE BOULEVARD/4TH |
| | STREET, THE SITE DRIVEWAY, AND EASTBOUND LEFT-TURN AT |
| | QUADRILLE BOULEVARD/DIXIE HIGHWAY. |
| | 2. PURSUE WITH FDOT ON ELIMINATING THE EXCLUSIVE |
| | RIGHT-TURN LANE REQUIREMENT ON QUADRILLE BOULEVARD. THE |
| | CITY WILL PROVIDE A LETTER OF SUPPORT TO THE APPLICANT. |
| | 3. CONDUCT TRAFFIC SIGNAL WARRANT ANALYSES AT QUADRILLE |
| | BOULEVARD/4TH STREET EVERY YEAR FOR 2 YEARS WHEN THE |
| | FOLLOWING CONDITIONS ARE MET: |
| | O CO IS ISSUED FOR AT LEAST 50% OF THE PROPOSED |
| | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND |
| | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH |
| | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM |
| | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY |
| | CAPACITY MANUAL METHODOLOGY. |
| | O CO IS ISSUED FOR AT LEAST 85% OF THE PROPOSED |
| | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND |
| | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH |
| | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM |
| | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY |
| | CAPACITY MANUAL METHODOLOGY. |
| | O THE LAST CO IS ISSUED FOR THE PROPOSED DEVELOPMENT. |
| | 4. THE TRAFFIC SIGNAL ANALYSES SHOULD INCLUDE, AT A |
| | MINIMUM, WARRANT 1 EIGHT-HOUR VEHICULAR VOLUME, WARRANT |
| | 2 FOUR-HOUR VEHICULAR VOLUME, WARRANT 4 PEDESTRIAN |
| | VOLUME, AND WARRANT 7 CRASH EXPERIENCE DOCUMENTED IN |
| | THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). |
| | THE NECESSARY TRAFFIC AND SAFETY DATA SHOULD BE |
| | COLLECTED FOR THE ANALYSES. |
| | 5. SHOULD THE REQUEST FOR TRAFFIC SIGNAL BE DENIED, THE |
| | DEVELOPMENT SHOULD IMPLEMENT ALTERNATIVE MEASURES TO |
| | MITIGATE TRAFFIC CONGESTION AT QUADRILLE BOULEVARD/4TH |
| | STREET, INCLUDING BUT NOT LIMITED TO ADDITIONAL TDM |
| | MEASURES, WAYFINDING SIGNS TO DIVERT TRIPS TO THE |
| | QUADRILLE BOULEVARD/3RD STREET INTERSECTIONS, ETC. IN |
| | ADDITION, THE DEVELOPMENT SHOULD, ON CITY?S REQUEST, |
| | CONDUCT AN ENGINEERING STUDY FOR A POTENTIAL ENHANCED |
| | PEDESTRIAN CROSSWALK CROSSING QUADRILLE BOULEVARD AT |
| | 4TH STREET, AND PURSUE SUCH A CROSSWALK APPROVAL WITH |
| | FDOT, AND IF APPROVED, CONSTRUCT SUCH ENHANCED |
| | CROSSWALK AT THE DEVELOPER?S OWN EXPENSES. |
| | 6. PROVIDE SURETY FOR THE CONSTRUCTION OF A TRAFFIC |
| | SIGNAL AT QUADRILLE BOULEVARD/4TH STREET UNTIL THE |
| | OBLIGATIONS RELATED TO TRAFFIC SIGNAL WARRANT ANALYSES |
| | OR SIGNAL CONSTRUCTION (#3, #4 AND #5 ABOVE) ARE FULLY |
| | MET. |
| | |
| | SHING TSOI |
| | CITY IN-HOUSE TRAFFIC CONSULTANT |
| | 561-494-1141 |
| | [email protected] |
| | |
| |
Print |