Plan Review Notes
Plan Review Notes For Project Z17020040
Project Number Z17020040
Review Stop ENG - PPRC
Sequence Number 3
Notes
Date Text
2019-01-31 12:38:17SOME PREVIOUS COMMENTS FROM 4/13/17 HAVE NOT BEEN
 ADDRESSED; PLEASE ADDRESS ALL COMMENTS WITH WRITTEN
 RESPONSES TO BE PROVIDED WITH RESUBMITTAL.
  
 FOR ENGINEERING SUBMITTAL, UPDATE ALL CITY OF WEST PALM
 BEACH STANDARD DETAILS TO MOST CURRENT VERSIONS, WHICH
 CAN BE FOUND HERE: HTTP://WPB.ORG/DEPARTMENTS/ENGINEERI
 NG-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS ARE INCLUDED FOR YOUR GENERAL
 INFORMATION AND USE FOR THE ENGINEERING SUBMITTAL.
  
 THE CITY OF WEST PALM BEACH HAS A NUMBER OF REGULATIONS
 AND PERMIT REQUIREMENTS WHICH DIRECTLY AFFECT THE
 DEVELOPMENT AND INSTALLATION OF WATER AND WASTEWATER
 UTILITIES WITHIN THE CITY. PLEASE SEE DEVELOPMENT
 PERMIT SUBMITTAL REQUIREMENTS AT THE LINK BELOW:
 HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WPB_W
 EBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FULL-P
 ACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97B19
 60045731D3658206F27451722716EF
  
 THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE
 FOUND HERE:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 CODE OF ORDINANCES, CITY OF WEST PALM BEACH, FLORIDA,
 CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED SEPT. 22,
 2008. (SUPPLEMENT NO. 18)
  
 CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL,
 SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER
 SERVICE FACILITIES OF THE CITY.
  
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
  
 PROVIDE CALCULATIONS OF EXISTING AND PROPOSED DEMANDS
 FOR WATER & SEWER (AVERAGE, MAXIMUM AND PEAK) AND FIRE
 FLOW DEMANDS. CALCULATIONS SHALL BE PER FAC 64E-6 FOR
 SEWER AND PER FAC 64-E.008 FOR WATER.
  
 PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER ALONG
 ENTIRE PROJECT FRONTAGE.
  
 PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY OF
 WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC RIGHT
 OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF YOUR
 PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1079 FOR FURTHER
 ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION
 ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD
 SURVEY, POT-HOLING, SOFT DIGS ETC.
  
 AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS OF
 ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES,
 INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND
 SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND
 PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER
 OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY.
  
 PROVIDE PROFILE VIEW OF ALL UTILITY CONFLICTS WITHIN
 CITY OF WPB RIGHT OF WAY.
  
 CUT AND CAP ANY UTILITIES NOT BEING USED.
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved