| Date |
Text |
| 2017-03-07 17:22:35 | CITY OF WEST PALM BEACH |
| | PUBLIC WORKS DEPARTMENT |
| | ENGINEERING DIVISION |
| | |
| | DATE: 03/07/2017 |
| | |
| | Z17020040: 550 N. QUADRILLE BLVD - ONE WEST PALM |
| | DEVELOPMENT |
| | |
| | THIS IS A RESUBMITTAL HENCE ALL PREVIOUS CONDITIONS OF |
| | APPROVAL STILL APPLY. ANY AND ALL PREVIOUS COMMENTS |
| | THOSE HAVE NOT BEEN SATISFIED WILL NEED TO BE ADDRESSED |
| | DURING THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION |
| | PROCESSES. |
| | |
| | THE FOLLOWING NEW COMMENTS ARE MADE ON THE RECENTLY |
| | SUBMITTED PLANS AND MUST BE ADDRESSED PRIOR TO ISSUANCE |
| | OF CONSTRUCTION AUTHORIZATION INCLUDING BUILDING |
| | PERMITS AND ENGINEERING DEVELOPMENT APPROVAL: |
| | |
| | FOLLOWING IS GENERAL SITE COMMENT: |
| | |
| | 1. FOR SANITATION/GARBAGE COLLECTION CONTACT THE CITY'S |
| | PUBLIC WORKS DEPARTMENT. FINAL APPROVED SITE PLANS NEED |
| | TO SHOW PROPOSED SANITATION COLLECTION PLANS AND |
| | DETAILS; AND WILL NEED APPROVAL FROM PETER BIENIEK, |
| | PUBLIC WORKS DIRECTOR. PLEASE INCLUDE THE CITY OF WEST |
| | PALM BEACH STANDARD DETAIL FOR THE DUMPSTER ENCLOSURE |
| | ON THE PLANS. MINIMUM DIMENSIONAL (E.G. THE GATE WIDTH |
| | MUST BE A MINIMUM OF 12.5 FEET) REQUIREMENTS FOR THE |
| | ENCLOSURE ARE LISTED IN CODE OF ORDINANCES, SECTION |
| | 94-444(B) OF THE CODE OF ORDINANCES. CITY STANDARD |
| | DETAIL GC-8 MAY BE DOWNLOADED AT: |
| | |
| | HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEE |
| | RING-STANDARDS/ |
| | |
| | FOLLOWING ARE WATER AND SEWER COMMENTS AND NEED TO BE |
| | ADDRESSED PRIOR TO ENGINEERING DEPARTMENT APPROVAL: |
| | |
| | 2. A FIRE HYDRANT FLOW TEST DATA FROM EXISTING FIRE |
| | HYDRANT WILL BE REQUIRED PART OF THE PLAN SUBMITTAL; |
| | |
| | 3. PLEASE INCLUDE THE LATEST VERSION OF THE APPLICABLE |
| | CITY OF WEST PALM BEACH STANDARD UTILITY DETAILS TO THE |
| | DETAILS SHEET DURING SUBMISSION OF THE FINAL |
| | ENGINEERING PLANS. CONTACT THE ENGINEERING SERVICES |
| | DEPARTMENT FOR THE LATEST REVISED DETAILS IN CAD |
| | FORMAT. CITY?S STANDARD DETAILS (IN PDF FILE FORMAT) |
| | CAN BE DOWNLOADED FROM THE FOLLOWING SITE: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | 4. PLACEMENT OF THE PROPOSED METER, BACKFLOW PREVENTER, |
| | DCDA ETC. SHALL BE INSTALLED PER THE CITY'S STANDARD |
| | DETAILS. THEY SHALL NOT BE INSIDE THE BUILDING |
| | ENCLOSURE. WATER METER SHOULD BE WITHIN THE |
| | RIGHT-OF-WAY OR INSIDE AN 'UTILITY EASEMENT' JUST |
| | INSIDE THE PROPERTY NEAR THE RIGHT-OF-WAY AND |
| | ACCESSIBLE; |
| | |
| | 5. IN THE FINAL PLANS, SHOW CONFLICT INFORMATION |
| | (BOTTOM AND TOP OF CROSSING PIPES) AT THE CONFLICT |
| | POINTS OF ALL WATER, STORM AND SANITARY SEWER PIPES AS |
| | WELL AS OTHER FRANCHISE UTILITIES. EXISTING UTILITIES |
| | WITHIN THE PROPOSED SANITARY SEWER LATERAL ARE TO BE |
| | VERIFIED VIA SOFTDIGS AND PROVIDE ALL UTILITY CROSSING |
| | INFORMATION; |
| | |
| | 6. CCTV RECORD (VIDEO AND TV LOG) OF THE EXISTING |
| | SANITARY SEWER (FULL LENGTH FROM MH TO MH) ON NORTH |
| | DIXIE HWY. AND NEW SANITARY SEWER LATERAL WILL BE |
| | REQUIRED AS PART OF THE PROJECT CLOSE-OUT SUBMITTALS; |
| | |
| | 7. EXISTING WATER SERVICE CONNECTIONS/WATER METERS |
| | SERVING THE PROPERTY, IF NOT USED, ARE TO BE CUT AND |
| | CAPPED AT THE MAIN. DE-ACTIVATED/INACTIVE PIPELINES |
| | LARGER THAN 2" DIAMETER WILL BE REMOVED. PLEASE LABEL |
| | PIPE SIZE AND MATERIAL AND ADD NOTES TO THE UTILITY |
| | PLANS ACCORDINGLY; |
| | |
| | 8. EXISTING SEWER SERVICE CONNECTIONS SERVING THE |
| | PROPERTY, IF NOT USED, ARE TO BE CUT AND CAPPED AT THE |
| | MAIN; |
| | |
| | 9. SHOW SIZE AND MATERIAL OF THE PROPOSED SANITARY |
| | SEWER SERVICE. INCLUDE A PROFILE FOR THE PROPOSED |
| | SERVICE LATERAL WITH GROUND ELEVATIONS ABOVE THE PIPE; |
| | |
| | 10. EXISTING SANITARY SEWER MH TO BE REHABBED PER |
| | CITY'S REQUIREMENTS WHILE CONNECTING NEW SERVICE LINES; |
| | |
| | 11. FOR THE FINAL UTILITY PLANS, INCLUDE A NOTE THAT: |
| | AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM BEACH |
| | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, |
| | MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD |
| | FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI |
| | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL |
| | |
| | 12. ALL PROPOSED FIRE DEPARTMENT CONNECTIONS SHALL BE |
| | WITHIN 150 FEET OF A FIRE HYDRANT AND SHALL BE WITHIN |
| | AN EASEMENT WITHIN THE PROPERTY. LANDSCAPE PLAN SHALL |
| | SHOW LOCATIONS OF ALL WATER METERS, VALVES, CLEAN-OUTS, |
| | LIGHT POLES, ETC. ROOT BARRIERS MAY BE REQUIRED WHERE |
| | PLANTINGS ARE NEAR UNDERGROUND STORMWATER, SANITARY, OR |
| | POTABLE WATER LINES. |
| | |
| | 13. SUBMITTAL OF MAINTENANCE OF TRAFFIC (MOT) FOR WORK |
| | WITHIN THE RIGHT-OF-WAY WILL BE REQUIRED AT THE |
| | PRE-CONSTRUCTION MEETING. |
| | |
| | MOSTAQUE KHAN, P.E. |
| | LAND DEVELOPMENT ENGINEER |
| | [email protected] |
| | 561-494-1124 (OFFICE) |
| | |
| |