| 2017-06-20 16:32:04 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE JUNE | | | 8, 2017 REVIEW PACKAGE. | | | | | | 1. THE 5/9/2017 STORM COMMENTS WERE NOT ADDRESSED. | | | | | | 2. ENGINEERING PLAN SHEET 5 OF 6 CALLS OUT 12" P.C.V. | | | PIPE. WHAT DOES THE ABBREVIATION P.C.V. STAND FOR? | | | | | | 3. MINIMUM STORM PIPE SIZE IN THE RIGHT-OF-WAY IS 15". | | | | | | 4. STORM PIPE MATERIAL IN THE RIGHT OF WAY SHALL BE RCP | | | (REINFORCED CONCRETE PIPE). | | | | | | 5. SPECIFY CATCH BASIN INLETS INSTEAD OF YARD DRAINS | | | FOR THE PROPERTY NORTH OF 2ND STREET. | | | | | | 6. STRUCTURE A4 IS LOCATED WITHIN THE 10-FT TRAVEL | | | LANE. CAN IT BE SHIFTED TO BE CENTERED ON THE EDGE OF | | | TRAVEL LANE SIMILAR TO STRUCTURE A5? | | | | | | 7. SHEET 4 OF 6 CALLS OUT 12" HEADER CURB FOR | | | CENTERLINE STRIPING. SECTION C-C ON SHEET 6 OF 6 CALLS | | | OUT 6" HEADER CURB FOR CENTERLINE STRIPING. | | | | | | 8. CONSIDER ADDING CATCH BASIN ON SOUTH SIDE OF 2ND | | | STREET BETWEEN NARCISSUS AND FLAGLER DRIVE. | | | | | | 9. LABEL VERTICAL DATUM ON SHEET 6 OF 6. | | | | | | 10. MOVE THE EXFILTRATION TRENCH ON NARCISSUS AVE FROM | | | UNDERNEATH THE STREET TREES. THE PLANTING AREA FOR THE | | | TREES EXTEND OUT BEYOND THE TREE GRATE. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
| |
Print |
|