| 2017-06-16 16:23:17 | CITY OF WEST PALM BEACH | | | ENGINEERING SERVICES DEPARTMENT | | | | | | DATE: 06/16/2017 | | | | | | PROJECT NAME: 200 2ND ST. & 201 N. FLAGLER DR. - FORMER | | | CITY HALL AND HELEN WILKES HOTEL SITES - Z17020026 | | | | | | 3RD/RE-SUBMITTAL REVIEW RESPONSE | | | | | | STATUS: PASSED WITH CONDITION | | | | | | AFTER REVIEWING THE REVISED PLANS AND THE RESPONSES ON | | | THE "PPRC RESPONSE LETTER" OF JUNE 7, 2017, FOLLOWING | | | ARE OUR COMMENTS: | | | | | | 3. SITE PLAN APPROVAL IS PENDING UPON SUBMITTAL OF THE | | | "LETTER OF APPROVAL" FROM THE PUBLIC WORKS DIRECTOR, | | | PETER BIENIEK; | | | | | | 8. WATER METERS ARE SHOWN TO BE INSIDE THE RIGHT-OF-WAY | | | IN THE REVISED PLANS. FINAL DESIGN PLANS NEED TO COMPLY | | | WITH THIS CRITERIA; | | | | | | 13. COMMENT ACCEPTED - REDESIGNED/REVISED WATER AND | | | SEWER PLANS WILL BE REVIEWED AT THE FINAL DESIGN PHASE; | | | | | | 21. DURING FINAL DESIGN PHASE, SUBMIT PROFILE FOR THE | | | NEW SANITARY SEWER CONNECTION/LATERALS (WITH VERTICAL | | | INFORMATION OF ALL OTHER UTILITIES AT CONFLICT POINTS | | | I.E. TOP AND BOTTOM OF PIPES); | | | | | | 22. RESPONSE ACCEPTED - DETAILED GRADING AND DRAINAGE | | | PLANS WILL BE REVIEWED AT THE FINAL DESIGN PHASE; | | | | | | 23. RESPONSE ACCEPTED. | | | | | | MOSTAQUE KHAN, P.E. | | | LAND DEVELOPMENT ENGINEER | | | [email protected] | | | 561-494-1124 (OFFICE) | | | |
| |
Print |
|