2017-03-07 16:23:18CITY OF WEST PALM BEACH
 PUBLIC WORKS DEPARTMENT
 ENGINEERING DIVISION
  
 DATE: 03/07/2017
  
 Z17020023: 2300 PRESIDENTIAL WAY - BANYAN CAY GOLF
 COURSE MAINTENANCE FACILITY AND STORAGE
  
 THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR
 TO ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL:
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED FROM THE FOLLOWING WEBSITE LINK:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 2. PLEASE SUBMIT THE LATEST VERSION OF THE 'AUTO-CALC
 CERTIFIED COST ESTIMATE FORM' FOR SUBMISSION TO CITY OF
 WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL
 WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE
 FOLLOWING LINK:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 FOLLOWING GENERAL SITE COMMENTS:
  
 3. FOR SANITATION/GARBAGE COLLECTION CONTACT THE CITY'S
 PUBLIC WORKS DEPARTMENT. FINAL APPROVED SITE PLANS NEED
 TO SHOW PROPOSED SANITATION COLLECTION PLANS AND
 DETAILS; AND WILL NEED APPROVAL FROM PETER BIENIEK,
 PUBLIC WORKS DIRECTOR. PLEASE INCLUDE THE CITY OF WEST
 PALM BEACH STANDARD DETAIL FOR THE DUMPSTER ENCLOSURE
 ON THE PLANS. MINIMUM DIMENSIONAL (E.G. THE GATE WIDTH
 MUST BE A MINIMUM OF 12.5 FEET) REQUIREMENTS FOR THE
 ENCLOSURE ARE LISTED IN CODE OF ORDINANCES, SECTION
 94-444(B) OF THE CODE OF ORDINANCES. CITY STANDARD
 DETAIL GC-8 MAY BE DOWNLOADED AT:
  
 HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEE
 RING-STANDARDS/
  
 4. IN THE FINAL PLANS SHOW ADA ACCESSIBLE RAMPS ON THE
 SIDEWALK AT EACH ENTRANCE AND EXIT /DRIVEWAY APPROACH;
  
 FOLLOWING ARE WATER AND SEWER COMMENTS AND NEED TO BE
 ADDRESSED PRIOR TO ENGINEERING DEPARTMENT APPROVAL:
  
 5. SUBMIT WITH THE ENGINEERING DEVELOPMENT APPROVAL
 APPLICATION SIGNED & SEALED ENGINEER/MEP WATER AND
 SANITARY SEWER CALCULATION (AVERAGE AND PEAK WITH
 PEAKING FACTOR). SUBMIT CALCULATIONS TO VALIDATE METER
 SIZE SELECTION. SHOW THESE CALCULATIONS ON THE UTILITY
 PLAN SHEET AS WELL;
  
 6. SHOW ON THE FINAL PLANS WHERE ARE THE PROPOSED WATER
 AND SANITARY SEWER LINES ARE CONNECTED TO EXISTING
 WATER AND SEWER MAINS ON THE PRESIDENTIAL WAY;
  
 7. THERE IS NO FIRE LINE SHOWN ON THE CONCEPTUAL PLAN;
 EVALUATE FIRE DEMAND FOR THE PROPOSED DEVELOPMENT AND
 PROVIDE CALCULATIONS. ANY PROPOSED FIRE LINE CONNECTION
 WITH APPROPRIATE DETAILS NEED TO BE SHOWN ON THE FINAL
 UTILITY PLANS;
  
 8. SHOW THE NEAREST FIRE HYDRANT TO THIS SITE ON THE
 FINAL UTILITY PLAN. FIRE HYDRANT FLOW TEST DATA FROM
 EXISTING FIRE HYDRANT WILL BE REQUIRED PART OF THE PLAN
 SUBMITTAL;
  
 9. PLEASE INCLUDE THE LATEST VERSION OF THE APPLICABLE
 CITY OF WEST PALM BEACH STANDARD UTILITY DETAILS TO THE
 DETAILS SHEET DURING SUBMISSION OF THE FINAL
 ENGINEERING PLANS. CONTACT THE ENGINEERING SERVICES
 DEPARTMENT FOR THE LATEST REVISED DETAILS IN CAD
 FORMAT. CITY?S STANDARD DETAILS (IN
 PDF FILE FORMAT) CAN BE DOWNLOADED FROM THE FOLLOWING
 SITE:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 10. PLACEMENT OF THE ANY PROPOSED METER, BACKFLOW
 PREVENTER, DCDA ETC. SHALL BE INSTALLED PER THE CITY'S
 STANDARD DETAILS. WATER METER SHOULD BE WITHIN THE
 RIGHT-OF-WAY OR INSIDE AN 'UTILITY EASEMENT' JUST
 INSIDE THE PROPERTY NEAR THE RIGHT-OF-WAY AND
 ACCESSIBLE;
  
 11. IN THE FINAL PLANS, SHOW CONFLICT INFORMATION
 (BOTTOM AND TOP OF CROSSING PIPES) AT THE CONFLICT
 POINTS OF ALL WATER, STORM AND SANITARY SEWER PIPES AS
 WELL AS OTHER FRANCHISE UTILITIES. EXISTING UTILITIES
 WITHIN THE PROPOSED SANITARY SEWER LATERAL ARE TO BE
 VERIFIED VIA SOFTDIGS AND PROVIDE ALL UTILITY CROSSING
 INFORMATION;
  
 12. IN THE FINAL PLANS, SHOW DIRECTION OF FLOW FOR THE
 EXISTING SANITARY SEWER. SHOW INVERT AT CONNECTION
 POINTS AND INCLUDE A PROFILE FOR THE PROPOSED SERVICE
 LATERAL WITH GROUND ELEVATIONS ABOVE THE PIPE;
  
 13. PAVEMENT RESTORATION WILL BE REQUIRED FOR THE
 PROPOSED SANITARY SEWER CONNECTION TO THE EXISTING
 MANHOLE WITHIN THE RIGHT-OF-WAY. REFER TO THE CITY
 STANDARD DETAILS FOR RESTORATION GUIDELINES;
  
 14. SHOW SIZE AND MATERIAL OF ALL EXISTING UTILITIES ON
 PRESIDENTIAL WAY INCLUDING BUT NOT LIMITED TO WATER,
 SEWER, GAS, UNDERGROUND ELECTRIC CONDUITS ETC.;
  
 15. FOR THE FINAL UTILITY PLANS, INCLUDE A NOTE THAT:
 AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW:
  
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 16. ALL PROPOSED FIRE DEPARTMENT CONNECTIONS SHALL BE
 WITHIN 150 FEET OF A FIRE HYDRANT AND SHALL BE WITHIN
 AN EASEMENT WITHIN THE PROPERTY. LANDSCAPE PLAN SHALL
 SHOW LOCATIONS OF ALL WATER METERS, VALVES, CLEAN-OUTS,
 LIGHT POLES, ETC. ROOT BARRIERS MAY BE REQUIRED WHERE
 PLANTINGS ARE NEAR UNDERGROUND STORMWATER, SANITARY, OR
 POTABLE WATER LINES.
  
 MOSTAQUE KHAN, P.E.
 LAND DEVELOPMENT ENGINEER
 [email protected]
 561-494-1124 (OFFICE)
  