| Date |
Text |
| 2017-02-07 14:29:14 | FROM: RAY CARANCI, LANDSCAPE PLANNER |
| | PROJECT: 900 NORTH OLIVE Z17010022 |
| | FEBRUARY 7, 2016 |
| | |
| | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND |
| | PROVIDE THE FOLLOWING COMMENTS: |
| | |
| | 1. LANDSCAPE REQUIREMENTS ARE TRIGGERED IF THE |
| | RENOVATION AND ADDITION EXCEED 50 PERCENT OF THE |
| | CURRENT BUILDING VALUATION. |
| | |
| | 2. PLEASE IDENTIFY AND LIST ALL EXISTING TREES ON THE |
| | PROPERTY. |
| | |
| | 3. LANDSCAPE PLANS MUST BE PREPARED BY A LANDSCAPE |
| | ARCHITECT PER SECTION 94-113 (E). |
| | |
| | 4. PLEASE VERIFY THAT THE LANDSCAPE BUFFER ADJACENT TO |
| | THE RESIDENTIAL SUBDISTRICT TO THE EAST MEETS ALL |
| | REQUIREMENTS OF SECTION 94-113 (G). |
| | |
| | 5. PLEASE CALCULATE THE REQUIRED NUMBER OF TREES, |
| | FLOWERING TREES, AND SHRUBS FOR THE PROPERTY BASED ON |
| | THE OPEN SPACE PROVIDED PER SECTION 94-113(E)(2). THE |
| | CALCULATIONS SHALL BE MADE USING THE REQUIREMENTS OF |
| | SECTION 94-442(B)(2)B. PLEASE SHOW THE NUMBER OF |
| | REQUIRED AND PROVIDED TREES AND SHRUBS. |
| | |
| | 6. PLEASE PROVIDE INFORMATION ON THE COLEUS |
| | CLASSIFICATION AS VERY DROUGHT TOLERANT. |
| | |
| | 7. PLEASE CONSIDER REMOVING THE UNUSED CONCRETE AREA |
| | ADJACENT TO THE RAMP AND CONVERTING TO LANDSCAPE AREA, |
| | AND RECONFIGURE SIDEWALK TO CONNECT FUNCTIONALLY TO |
| | PARKING. |
| | |
| | 8. PLEASE ADD STREET TREES WITHIN THE PARKWAY ALONG 8TH |
| | STREET AS REQUIRED PER SECTION 94-113 (D). |
| | |
| | 9. PLEASE PROVIDE A SHADE OR FLOWERING TREE IN ALL |
| | TERMINAL ISLANDS OR LANDSCAPE AREAS ADJACENT TO EACH |
| | ROW OF PARKING PER SECTION 94-113 (F)(2). |
| | |
| | CONDITIONS OF APPROVAL |
| | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON |
| | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE |
| | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT |
| | SERVICES DEPARTMENT, PLANNING DIVISION. |
| | |
| | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE |
| | STREET TREES AND RIGHT OF WAY LANDSCAPING AND |
| | IRRIGATION APPROVED WITH THIS PETITION. |
| | |
| | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF |
| | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A |
| | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. |
| | |
| |
Print |