Plan Review Notes
Plan Review Notes For Project Z17010008
Project Number Z17010008
Review Stop ENG - PPRC
Sequence Number 1
Notes
Date Text
2017-02-03 10:01:16CITY OF WEST PALM BEACH
 PUBLIC WORKS DEPARTMENT
 ENGINEERING DIVISION
  
 DATE: 02/03/2017
  
 Z17010008: 936 27TH ST. & 925 26TH ST. - MAINTENANCE
 BLDG. FOR R&D PAVING INDUSTRIAL SITE
  
 THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR
 TO ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL:
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE CITY'S ENGINEERING SERVICES
 DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL
 APPLICATION FORMS CAN BE DOWNLOADED AT:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 2. PLEASE SUBMIT THE LATEST VERSION OF THE "AUTO-CALC
 CERTIFIED COST ESTIMATE FORM" FOR SUBMISSION TO CITY OF
 WEST PALM BEACH ENGINEERING SERVICES DEPARTMENT. THIS
 FORM CAN BE DOWNLOADED FROM THE FOLLOWING LINK:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 3. CITY GARBAGE TRUCKS CANNOT BACK UP MORE THAN 50
 FEET. SHOW/DELINEATE THE PATH OF THE GARBAGE TRUCK IN
 THE PLAN. CONSIDER AN ALTERNATIVE LOCATION FOR THE
 DUMPSTER (MUCH CLOSER TO THE ENTRANCE) SO THAT CITY?S
 SANITATION TRUCKS CAN EASILY ACCESS AND MANEUVER;
  
 4. PROPOSED DUMPSTER PAD AND ENCLOSURE SHALL BE
 CONSISTENT WITH CITY OF WEST PALM BEACH STANDARD
 DETAIL. INCLUDE THE DETAIL ON THE PLANS DURING
 RE-SUBMITTAL. MINIMUM DIMENSION (E.G. THE GATE WIDTH
 MUST BE A MINIMUM OF 12.5 FEET) REQUIREMENTS FOR THE
 ENCLOSURE ARE LISTED IN CODE OF ORDINANCES, SECTION
 94-444(B) OF THE CODE OF ORDINANCES. CITY STANDARD
 DETAIL GC-8 MAY BE DOWNLOADED AT:
  
 HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEE
 RING-STANDARDS/
  
 5. IF ROLL OUT TYPE DUMPSTER IS PROPOSED, PLEASE NOTE
 ON THE PLANS THAT: "OWNER IS RESPONSIBLE TO ROLL OUT
 THE DUMPSTER OUTSIDE THE ENCLOSURE PRIOR TO CITY'S
 SANITATION CREW PICK UP GARBAGE".
  
 FOLLOWING ARE WATER AND SEWER COMMENTS:
  
 6. CITY RECORD DRAWING SHOWS AN EXISTING 6-INCH DIP
 SANITARY SEWER LATERAL IS SERVING THE PROPERTY
 (CLEANOUT NEAR THE PROPERTY LINE). IT IS RECOMMENDED TO
 UTILIZE THE EXISTING LATERAL/CONNECTION;
  
 7. CITY RECORD DRAWING SHOWS AN EXISTING 1-INCH
 WATERLINE AND AN EXISTING WATER METER IS SERVING THE
 PROPERTY. IT IS RECOMMENDED TO UTILIZE THE EXISTING
 SERVICE CONNECTION;
  
 8. ANY WATERLINE THAT HAS NOT BEEN USED FOR A WHILE
 SHALL REQUIRE BAC-T TESTING PRIOR TO CONNECTION FOR NEW
 SERVICE;
  
 9. PLEASE INCLUDE THE LATEST VERSION OF THE APPLICABLE
 CITY OF WEST PALM BEACH STANDARD UTILITY DETAILS TO THE
 DETAILS SHEET. CONTACT THE ENGINEERING SERVICES
 DEPARTMENT FOR THE LATEST REVISED DETAILS IN CAD
 FORMAT. CITY'S STANDARD DETAILS (IN PDF FILE FORMAT)
 CAN BE DOWNLOADED FROM THE FOLLOWING SITE:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 10. ANY NEW/PROPOSED WATER METER AND BACKFLOW PREVENTER
 SHALL BE INSTALLED PER THE CITY'S STANDARD DETAILS.
 WATER METER SHOULD BE INSIDE AN 'UTILITY EASEMENT' JUST
 INSIDE THE PROPERTY NEAR THE RIGHT-OF-WAY AND
 ACCESSIBLE;
  
 11. PERFORM SOFTDIGS DATA AND PROVIDE UTILITY CROSSING
 INFORMATION. SHOW CONFLICT INFORMATION (BOTTOM AND TOP
 OF CROSSING PIPES) AT THE CONFLICT POINTS OF ALL WATER,
 STORM AND SANITARY SEWER PIPES AS WELL AS OTHER
 FRANCHISE UTILITIES;
  
 12. PAVEMENT RESTORATION WILL BE REQUIRED AND SHALL BE
 PER THE CITY STANDARD DETAILS (GC-9 AND P-4) IF
 PROPOSED WATER AND SANITARY SEWER CONNECTION WORK IS
 PERFORMED WITHIN THE RIGHT-OF-WAY;
  
 13. EXISTING WATER SERVICE CONNECTIONS/WATER METERS
 SERVING THE PROPERTY, IF NOT USED, ARE TO BE CUT AND
 CAPPED AT THE MAIN. DE-ACTIVATED/INACTIVE PIPELINES
 LARGER THAN 2-INCH DIAMETER WILL BE REMOVED. PLEASE
 LABEL PIPE SIZE AND MATERIAL AND ADD NOTES TO THE
 UTILITY PLANS ACCORDINGLY;
  
 14. PLEASE NOTE THAT: AS OF DECEMBER 20, 2015 THE CITY
 OF WEST PALM BEACH CROSS-CONNECTION CONTROL MANUAL HAS
 BEEN REVISED, MAKING KNOWN THAT "ALL BACKFLOW DEVICES
 MUST BE LEAD FREE." FOR MORE INFORMATION REFER TO THE
 LINK BELOW:
  
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 15. LANDSCAPE PLAN SHALL SHOW LOCATIONS OF ALL WATER
 METERS, VALVES, CLEAN-OUTS, LIGHT POLES, ETC. ROOT
 BARRIERS MAY BE REQUIRED WHERE PLANTINGS ARE NEAR
 UNDERGROUND STORMWATER, SANITARY, OR POTABLE WATER
 LINES.
  
 MOSTAQUE KHAN, P.E.
 LAND DEVELOPMENT ENGINEER
 [email protected]
 561-494-1124 (OFFICE)
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved