Plan Review Notes
Plan Review Notes For Project Z16110037
Project Number Z16110037
Review Stop STORM
Sequence Number 2
Notes
Date Text
2017-01-18 16:19:33COMMENTS ON THE 12/22/2016 RE-SUBMITTAL PACKAGE.
 1. SOME OF THE RESPONSES TO THE PPRC COMMENTS INDICATED
 THE COMMENTS WILL BE ADDRESSED AT BUILDING PERMIT
 SUBMITTAL.
  
 2. COORDINATE WITH PALM BEACH COUNTY THE PROPOSED
 IMPROVEMENTS IN THE CONGRESS AVE RIGHT-OF-WAY. SHOULD
 THERE BE VALLEY GUTTER ACROSS THE DRIVEWAYS? WILL
 EXISTING LIGHT POLE NORTH OF THE SOUTH DRIVEWAY NEED TO
 BE RELCATED BECAUSE OF PROPOSED DRAINAGE STRUCTURE #1?
 WHO WILL BE RESPONSIBLE TO MAINTAIN THE EXFILTRATION
 TRENCH CONNECTED TO STRUCTURE #1?
  
 3. CONNECTION OF PROPOSED 8" WATER MAIN TO THE EXISTING
 18" WATER MAIN SHOULD NOT OCCUR UNDER THE DRAINAGE
 STRUCTURE TOP.
  
 4. LABEL THE VERTICAL DATUM FOR THE FINISHED FLOOR
 ELEVATION ON THE SITE PLAN.
  
 5. THE PAVING, DRAINAGE, WATER AND SEWER PLAN LISTS THE
 FFE AS 17.50 NGVD. THE SITE PLAN LISTS THE FFE AS
 16.50. THIS NEEDS TO BE COORDINATED.
  
 6. WILL FILL BE BROUGHT IN FOR THE AREAS NORTHWEST AND
 SOUTHEAST OF THE PARKING LOTS. PROVIDE A CROSS SECTION
 ACROSS THESE AREAS FROM THE PROPERTY LINE TO THE
 CURBING OF THE PARKING AREAS.
  
 TRACY L. WARD, P.E.
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved