Plan Review Notes
Plan Review Notes For Project Z16110015
Project Number Z16110015
Review Stop STORM
Sequence Number 3
Notes
Date Text
2017-05-25 16:53:02COMMENTS BELOW ARE FROM THE CONCEPTUAL LEVEL REVIEW OF
 THE MAY 23, 2017 REVIEW PACKAGE.
  
 1. WEIR BOX DETAIL ON SHEET 5 OF 8 CALLS OUT PLACING
 THE WEIR IN STRUCTURE S-102. THE WEIR NEEDS TO BE
 INSTALLED ON THE PRIVATE SYSTEM, OUTSIDE OF THE
 RIGHT-OF-WAY.
  
 2. CONSIDER MOVING THE STORM PIPE ALONG THE WEST SIDE
 OF THE BUILDING FURTHER TO THE WEST AWAY FROM THE
 BUILDING SO THAT IF THE PIPE NEEDS TO BE REPLACED IN
 THE FUTURE, IT CAN BE EXCAVATED WITHOUT UNDERMINING THE
 BUILDING FOUNDATION.
  
 3. CONSIDER ADDING MORE EXFILTRATION TRENCH AT THE
 SOUTH END OF THE DRAINAGE SYSTEM (WEST OF THE BUILDING
 AND/OR ACROSS THE WEST END OF THE SOCCER FIELD. THE
 EXISTING EXFILTRATION TRENCH IS AT THE UP STREAM END OF
 THE DRAINAGE SYSTEM AND ONLY THE PARKING LOT RUNOFF
 WILL BE FLOW TO THE EXFILTRATION TRENCH. THE PIPE
 SYSTEM SLOPES FROM NORTH TO SOUTH.
  
 4. CONFIRM DIAMETER OF THE EXISTING STORM PIPE ON
 BISCAYNE DRIVE WHERE STRUCTURE S-102 WILL BE
 CONSTRUCTED.
  
 5. LANDSCAPING ALONG THE SOUTH SIDE OF NEW BUILDING
 WILL BE IN CONFLICT WITH THE PROPOSED STORM PIPES.
  
 6. CONSIDER USING 45-DEGREE BEND INSTEAD OF 90-DEGREE
 BEND AFTER THE 4" X 8" REDUCER FOR THE WATER MAIN
 CONNECTION ON BISCAYNE DRIVE.
  
 7. PROVIDE UPDATED DRAINAGE CALCULATIONS FOR PHASE 2
 IMPROVEMENTS.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120