Plan Review Notes
Plan Review Notes For Project Z16100012
Project Number Z16100012
Review Stop STORM
Sequence Number 1
Notes
Date Text
2016-11-04 13:14:11THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP://
 WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER
 MITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE
 AVAILABLE AT
 HTTP://MAPS.CO.PALM-BEACH.FL.US/GIS/FLOODZONES.ASPX?.
 PLEASE REVIEW THE MAPS AND VERIFY THAT THE NEW MAPS
 WILL NOT IMPACT THE PROPOSED PROJECT.
  
 2. THE CITY COMMISSION RECENTLY PASSED A RESOLUTION
 INCREASING THE FREEBOARD REQUIREMENT TO ONE FOOT ABOVE
 BASE FLOOD ELEVATION FOR STRUCTURES IN A SPECIAL FLOOD
 HAZARD AREA.
  
 3. SURVEY AND ENGINEERING PLANS REFERENCE THE NORTH
 AMERICAN VERTICAL DATUM OF 1988. THE CITY?S VERTICAL
 DATUM IS NATIONAL GEODETIC VERTICAL DATUM OF 1929.
 PROVIDE ON THE SURVEY AND ENGINEERING PLANS THE
 RELATIONSHIP BETWEEN THESE TWO VERTICAL DATUMS AT THIS
 SITE.
  
 4. SITE PLAN INDICATES THE PLATTED DRAINAGE EASEMENT IS
 TO BE VACATED. INDICATE IF THE OUTFALL CONNECTION TO
 AUSTRALIAN AVENUE DRAINAGE SYSTEM WILL BE NEEDED. IF
 NOT, REMOVE CONTROL STRUCTURE AND PIPE CONNECTION TO
 THE AUSTRALIAN AVENUE DRAINAGE SYSTEM IN THE NORTHEAST
 CORNER OF THE SITE.
  
 5. THE PUBLIC UTILITIES DEPARTMENT WILL NEED TO APPROVE
 THE 5? WIDE CONCRETE WALKING PATH ALONG LAKE MANGONIA.
 PROVIDE A CROSS SECTION OF THE PATH AND INDICATE THE
 CROSS SLOPE SLOPES AWAY FROM THE LAKE.
  
 6. STATE THE NEED FOR THE 8? WIDE MAINTENANCE ACCESS
 GATES TO THE CITY?S PROPERTY AROUND THE LAKE.
  
 7. PROVIDE COPY OF AGREEMENT WITH OWNER OF PARCEL 1 TO
 DISCHARGE STORMWATER RUNOFF INTO THE LAKE ON PARCEL 1.
  
 8. INDICATE ON THE PRB DETAIL THAT THE BAFFLE SHOULD
 EXTEND A MINIMUM OF 6 INCHES BELOW THE PIPE INVERT.
 WHICH STRUCTURES WILL HAVE PRBS?
  
 9. NORTH ARROW ON ENGINEERING PLANS APPEARS TO BE
 POINTING SOUTH.
  
 10. INDICATE PAVEMENT RESTORATION AT SEWER CONNECTION
 TO EXISTING MANHOLE ON AUSTRALIAN AVE.
  
 11. AUSTRALIAN AVE. RIGHT-OF-WAY IS MAINTAINED BY PALM
 BEACH COUNTY. A COUNTY LAND DEVELOPMENT RIGHT-OF-WAY
 PERMIT MAY BE REQUIRED.
  
 12. SHOW EXISTING AND PROPOSED UTILITIES AND EASEMENTS
 ON THE LANDSCAPE PLANS.
  
 13. ARE THE PROPOSED FACILITIES SHOWN ON THE PROPERTY
 OWNED BY THE CITY PART OF THE SITE PLAN APPROVAL
 REQUEST?
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. PROVIDE ENGINEERING CALCULATIONS SIGNED AND SEALED
 BY A FLORIDA REGISTERED PROFESSIONAL ENGINEER FOR THE
 MINIMUM REQUIRED STORM RUNOFF WATER QUALITY TREATMENT
 AND PEAK FLOOD STAGES FOR 5-YEAR 1-DAY, 25-YEAR 3-DAY
 AND 100-YEAR 3-DAY DESIGN STORMS PER SFWMD CRITERIA.
  
 3. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION FOR
 THIS PROPOSED DEVELOPMENT.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT