| 2016-11-07 10:26:19 | CITY OF WEST PALM BEACH |
| | PUBLIC WORKS DEPARTMENT |
| | ENGINEERING DIVISION |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT: |
| | |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. PALM BEACH COUNTY APPROVAL OF THE PROPOSED DRIVEWAYS |
| | WILL BE REQUIRED PRIOR TO FINAL SITE PLAN APPROVAL; |
| | |
| | 2. A TRAFFIC STUDY WILL BE REQUIRED FOR THIS PROJECT |
| | SHOWING HOW THE PROPOSED DEVELOPMENT WILL AFFECT THE |
| | TRAFFIC VOLUME AND SURROUNDING LOCAL ROADWAYS. INCLUDE |
| | TRAFFIC ACCIDENT DATA FOR AFFECTED STREET CORRIDORS. |
| | ESTIMATE INCREASED OR DECREASED POTENTIAL. SAFETY |
| | IMPROVEMENTS SHALL BE RECOMMENDED WHERE NECESSARY; |
| | |
| | 3. CONSENT OF ADJOINING PROPERTY IS REQUIRED FOR |
| | DRAINAGE; |
| | |
| | 4. SEE COMMENTS ON DRAINAGE FROM CITY'S STORMWATER |
| | ENGINEER; |
| | |
| | 5. SOLID WASTE YARDAGE CALCULATION WILL NEED TO BE |
| | SUBMITTED AS PART OF THE FINAL DESIGN TO VERIFY THAT |
| | THE DESIGN INCLUDES APPROPRIATE NUMBER AND SIZE OF |
| | DUMPSTERS/GARBAGE RECEPTACLES. PLEASE SHOW ON THE PLAN |
| | IF A COMPACTOR IS PROPOSED TO REDUCE THE YARDAGE OF |
| | WASTE THAT WILL NEED TO BE COLLECTED; |
| | |
| | 6. PLEASE PROVIDE AN AUTOTURN ANALYSIS DEMONSTRATING |
| | THE SOLID WASTE COLLECTION VEHICLE CAN ACCESS THE |
| | PROPOSED DUMPSTER AND COMPACTOR LOCATIONS. THE TRASH |
| | DUMPSTER/COMPACTORS MUST LOCATED IN AREAS EASILY |
| | SERVICED BY THE CITY SANITATION EQUIPMENT AND MANPOWER |
| | PER SECTION 74-35(A)(5) OF THE CODE OF ORDINANCES. IF A |
| | ROLL-OFF COMPACTOR IS PROPOSED, PLEASE PROVIDE A LETTER |
| | FROM THE PRIVATE PROVIDER VERIFYING THAT THEY CAN |
| | PROVIDE SERVICE WITH THE CONFIGURATION SHOWN ON THE |
| | PLANS; |
| | |
| | 7. WATER TO BE MASTER-METERED. SANITARY SEWER WILL |
| | REQUIRE A POINT OF CONNECTION AT RIGHT-OF-WAY; |
| | |
| | 8. PLEASE REVISE THE LANDSCAPE PLAN TO SHOW LOCATIONS |
| | OF ALL WATER METERS, VALVES, CLEAN-OUTS, LIGHT POLES, |
| | ETC. ROOT BARRIERS MAY BE REQUIRED WHERE PLANTINGS ARE |
| | NEAR UNDERGROUND STORMWATER, SANITARY, OR POTABLE WATER |
| | LINES; |
| | |
| | 9. REVISE THE NORTH ARROW ON THE PLANS. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL: |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING DIVISION OF THE PUBLIC |
| | WORKS DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL |
| | APPLICATION FORMS CAN BE DOWNLOADED AT: |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | 2. CONTACT THE PALM BEACH COUNTY FOR WORK WITHIN THE |
| | AUSTRALIAN AVENUE RIGHT-OF-WAY TO OBTAIN A PERMIT. |
| | PLEASE SUBMIT A COPY OF THE PERMIT WITH THE DEVELOPMENT |
| | APPLICATION TO THE CITY?S ENGINEERING DEPARTMENT; |
| | |
| | 3. PLEASE IDENTIFY THE SOURCE OF THE AS-BUILT |
| | INFORMATION UTILIZED FOR THE POTABLE WATER, SANITARY |
| | SEWER, AND STORM SEWER DESIGN; |
| | |
| | 4. 8-FEET PATHWAY ALONG THE LAKE MANGONIA WILL BE |
| | REVIEWED BY THE CITY'S PUBLIC UTILITIES; |
| | |
| | 5. SHOW DISTANCE TO THE CLOSEST FIRE HYDRANT ON |
| | AUSTRALIAN AVENUE; |
| | |
| | 6. PLEASE SUBMIT THE CALCULATIONS FOR WATER AND |
| | SANITARY SEWER DEMANDS (AVERAGE AND PEAK); AND FIRE |
| | DEMAND. SUBMIT CALCULATIONS TO VALIDATE METER SIZE |
| | SELECTION. |
| | |
| | 7. PLEASE INCLUDE APPLICABLE CITY OF WEST PALM BEACH |
| | STANDARD DETAILS TO THE DETAILS SHEET. CONTACT THE |
| | ENGINEERING SERVICES DEPARTMENT FOR THE LATEST REVISED |
| | DETAILS IN CAD FORMAT. CITY?S STANDARD DETAILS (IN PDF |
| | FILE FORMAT) CAN BE DOWNLOADED FROM THE FOLLOWING SITE: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | 8. PLACEMENT OF THE PROPOSED METER, BACKFLOW PREVENTER, |
| | DCDA ETC. SHALL BE INSTALLED PER THE CITY?S STANDARD |
| | DETAILS. REVISE THE LOCATION OF THE FIRE HYDRANT. WATER |
| | METER SHOULD BE INSIDE AN 'UTILITY EASEMENT' JUST |
| | INSIDE THE PROPERTY NEAR THE RIGHT-OF-WAY AND |
| | ACCESSIBLE; |
| | |
| | 9. PROVIDE SOFT DIG INFORMATION FOR THE EXISTING |
| | UTILITIES; |
| | |
| | 10. SHOW DIRECTION OF FLOW FOR THE EXISTING SANITARY |
| | SEWER; |
| | |
| | 11. SHOW RIGHT-OF-WAY LINES (LABEL THEM) ON THE |
| | UTILITY/WATER AND SEWER PLANS; |
| | |
| | 12. CONSTRUCT A MANHOLE WITHIN THE RIGHT-OF-WAY AS |
| | POINT-OF-SERVICE FOR SANITARY SEWER AND SHOW ALL |
| | PROPOSED ONSITE SANITARY SERVICE AS PRIVATE; |
| | |
| | 13. PAVEMENT RESTORATION WILL BE REQUIRED FOR THE |
| | PROPOSED SANITARY SEWER CONNECTION TO THE EXISTING |
| | MANHOLE WITHIN THE RIGHT-OF-WAY; |
| | |
| | 14. EXISTING WATER SERVICE CONNECTIONS SERVING THE |
| | PROPERTY, IF NOT USED, ARE TO BE CUT AND CAPPED AT THE |
| | MAIN. DE-ACTIVATED/INACTIVE PIPELINES LARGER THAN 2" |
| | DIAMETER WILL BE REMOVED. PLEASE LABEL PIPE SIZE AND |
| | MATERIAL AND ADD NOTES TO THE UTILITY PLANS |
| | ACCORDINGLY; |
| | |
| | 15. ADD AN ON-LINE VALVE FOR WATER LINE; |
| | |
| | 16. PROVIDE PROFILE FOR WATER AND SEWER LINES; |
| | |
| | 17. PLEASE INCLUDE THE CITY OF WEST PALM BEACH STANDARD |
| | DETAIL FOR THE DUMPSTER ENCLOSURE ON THE PLANS. MINIMUM |
| | DIMENSIONAL (E.G. THE GATE WIDTH MUST BE A MINIMUM OF |
| | 12.5 FEET) REQUIREMENTS FOR THE ENCLOSURE ARE LISTED IN |
| | CODE OF ORDINANCES, SECTION 94-444(B) OF THE CODE OF |
| | ORDINANCES. CITY STANDARD DETAIL GC-8 MAY BE DOWNLOADED |
| | AT: |
| | |
| | HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEE |
| | RING-STANDARDS/ |
| | |
| | 18. CITY'S GARBAGE COLLECTOR TRUCK NEEDS TO HAVE NO |
| | LESS THAN 14' HIGH VERTICAL CLEARANCE AND 12' |
| | HORIZONTAL CLEARANCES FOR THE TRUCK TO DRIVE THROUGH; |
| | |
| | 19. PLEASE NOTE THAT: AS OF DECEMBER 20, 2015 THE CITY |
| | OF WEST PALM BEACH CROSS-CONNECTION CONTROL MANUAL HAS |
| | BEEN REVISED, MAKING KNOWN THAT "ALL BACKFLOW DEVICES |
| | MUST BE LEAD FREE." FOR MORE INFORMATION REFER TO THE |
| | LINK BELOW: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI |
| | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL |
| | |
| | 20. THE PROPOSED FIRE DEPARTMENT CONNECTION SHALL BE |
| | WITHIN 150 FEET OF A FIRE HYDRANT. LANDSCAPE PLAN SHALL |
| | SHOW LOCATIONS OF ALL WATER METERS, VALVES, CLEAN-OUTS, |
| | LIGHT POLES, ETC. ROOT BARRIERS MAY BE REQUIRED WHERE |
| | PLANTINGS ARE NEAR UNDERGROUND STORMWATER, SANITARY, OR |
| | POTABLE WATER LINES. |
| | |
| | MOSTAQUE KHAN, P.E. |
| | LAND DEVELOPMENT ENGINEER |
| | [email protected] |
| | 561-494-1024 (OFFICE) |
| | |
| |