Plan Review Notes
Plan Review Notes For Project Z16100010
Project Number Z16100010
Review Stop STORM
Sequence Number 2
Notes
Date Text
2017-06-09 11:37:53THE COMMENTS BELOW WERE GENERATED FROM JUNE 2017 PPRC
 PACKAGE FOR THE NEW ROADWAY AND PARKING ALONG THE
 ROADWAY.
  
 THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP://
 WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER
 MITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. LABEL VERTICAL DATUM ON ENGINEERING PLANS. THE CITY
 OF WEST PALM BEACH USES NGVD 1929. IF NAVD 1988 IS
 USED, THE CONVERSION BETWEEN NGVD 1929 AND NAVD 1988
 WILL NEED TO BE SHOWN ON THE PLANS.
  
 2. INDICATE IF STABILIZED SUBGRADE WILL BE NEEDED FOR
 THE ROADWAY OR PARKING AREAS.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved