| 2017-02-22 10:20:46 | PLANNING BOARD CASE NO. 1600G |
| | PALM BEACH DAY ACADEMY SITE PLAN AMENDMENT |
| | 1902 SOUTH FLAGLER DRIVE |
| | RESUBMITTAL REVIEW |
| | |
| | - CONTACT ERIC SCHNEIDER @ (561) 822-1446 |
| | |
| | - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN |
| | WRITTEN FORMAT. |
| | |
| | - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FIVE |
| | (5) PAPER COPIES AND AN ELECTRONIC COPY IN.PDF FORMAT |
| | OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE |
| | RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS |
| | TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL |
| | COMMENTS. |
| | |
| | - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT |
| | RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS |
| | FROM THE DATE OF THESE COMMENT (BY APRIL 22, 2017), THE |
| | CASE SHALL BE CONSIDERED WITHDRAWN. ANY FURTHER ACTION |
| | SHALL REQUIRE A NEW DEVELOPMENT APPLICATION. |
| | |
| | - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) |
| | ADDITIONAL RESUBMITTAL AT NO ADDITIONAL COST. IF |
| | PREVIOUSLY-ISSUED COMMENTS CONTINUE TO NOT BE |
| | SUFFICIENTLY ADDRESSED, THE APPLICANT WILL BE ACCESSED |
| | A RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF THE ORIGINAL |
| | APPLICATION FEE ($60). |
| | |
| | 1) REVISED COMMENT: THE SURVEY DATED JANUARY 20, 2017, |
| | SHOWS THE FENCE ALONG THE SOUTHERN BOUNDARY OF THE SITE |
| | ON THE PROPERTY LINE (ANNE NORTON SCULPTURE GARDEN) |
| | IMMEDIATELY ADJACENT TO THE PEDESTRIAN PATH. THIS IS |
| | ALSO HOW IT IS INSTALLED IN THE FIELD. PLEASE CORRECT |
| | BOTH THE SITE AND LANDSCAPE PLANS TO SHOW ACCURATE SITE |
| | CONDITIONS. THE CIVIL PLAN SHOWS THIS CORRECTLY. |
| | |
| | 2) UPDATED COMMENT: THE SITE DATA TABLE NEEDS TO BE |
| | CORRECTED AS FOLLOWS: |
| | |
| | A. EXISTING PBDA SCHOOL: FRONT SETBACK (SOUTH) AND REAR |
| | (NORTH). THE SETBACK DIMENSIONS NEED TO BE SWITCHED TO |
| | REFLECT THE CORRECT FRONT/SOUTH, REAR/NORTH SETBACKS. |
| | |
| | B. RELOCATED OUT BUILDING: THE SIDE STREET SETBACK IS |
| | MEASURED TO TUXEDO LANE NOT OLIVE LANE. |
| | |
| | 3) PROVIDE AN UPDATED SURVEY SHOWING THE NEW PROPERTY |
| | BOUNDARIES AND NEW EASEMENTS BASED ON THE RECENTLY |
| | RECORDED PLAT. THE EXISTING SITE CONDITIONS MUST BE |
| | SHOWN ON THE PLAT. |
| | |
| | 4) ON SHEET SP-3, IT APPEARS THAT THE WALKWAY CANOPY |
| | MAY OVERHANG THE NEW COCOANUT LANE RIGHT-OF-WAY, WHICH |
| | IS NOT PERMITTED. THIS WILL BE VERIFIED ONCE THE SURVEY |
| | IS REVISED BASED ON THE RECORDED PLAT. NOTE: THE CIVIL |
| | PLAN APPEARS TO SHOW A DIFFERENT CANOPY THAN THE SITE |
| | AND ARCHITECTURAL PLANS, TO INCLUDE DIFFERENT LOCATIONS |
| | OF THE SUPPORT POSTS AND SIDEWALK OVERHANG, WHEN |
| | COMPARED TO THE SITE PLAN (SEE SIDEWALK ALONG RELOCATED |
| | COCOANUT). |
| | |
| | 5) THE FLOOR PLANS SUBMITTED ON SEPTEMBER 13, 2016 AND |
| | THE ELEVATIONS SUBMITTED ON NOVEMBER 11, 2016, NO |
| | LONGER MATCH THE PLANS SUBMITTED FOR BUILDING PERMIT. |
| | PLEASE SUBMIT THE MOST CURRENT FLOOR PLANS AND |
| | ELEVATIONS. |
| | |
| | APPROVAL CONDITIONS: |
| | |
| | A. AT TIME OF SIGN PERMITTING, THE CITY'S ENGINEERING |
| | SERVICES DIVISION MUST GRANT SPECIFIC APPROVAL FOR THE |
| | LOW FREESTANDING SIGN WITHIN THE DRAINAGE EASEMENT |
| | VERIFYING THAT THE SIGN DOES NOT INTERRUPT THE FUNCTION |
| | OF THE EASEMENT. ADDITIONALLY, THE INSTALLATION OF THE |
| | SIGN FOUNDATION SHALL NOT DAMAGE THE ROOT SYSTEM OF THE |
| | ADJACENT, EXISTING TREE. |
| | |
| | B. THE FINAL LIGHTING PLACEMENT WILL BE VERIFIED AS |
| | PART OF THE SITE LIGHTING BUILDING PERMIT. |
| | |
| | |
| |