| Plan Review Notes For Project Z16080012 |
| Project Number |
Z16080012 |
|
| Review Stop |
STORM |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2017-04-17 09:05:42 | THE FOLLOWING TWO STORMWATER COMMENTS HAVE NOT BEEN | | | FULLY ANSWERED. THESE SHOULD BE A CONDITION OF SITE | | | PLAN APPROVAL. | | | | | | 4. THE METHOD FOR CONTROLLING GROUNDWATER FROM ENTERING | | | THE SUBTERRANEAN PARKING GARAGE AND HOW GROUNDWATER | | | WILL BE DISCHARGED FROM THE SITE ARE TO BE APPROVED BY | | | THE CITY'S ENGINEERING SERVICES DEPARTMENT. | | | | | | 5. DRAINAGE CALCULATIONS THAT ACCOUNT FOR SEA LEVEL | | | RISE IMPACTS ON THE ONSITE STORMWATER SYSTEM SHALL BE | | | SUBMITTED WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
| |
Print |
|