2016-10-28 16:57:23REVIEW OF PLANS SUBMITTED 10/25/16:
 1. DEMOLITION PLAN SHEET DM-1 SHOWS THE REMOVAL OF 60
 LF OF EXFILTRATION TRENCH BUT ONLY 54 LF IS SHOWN TO BE
 CONSTRUCTED ON SHEET PD-2.
  
 2. HOW WILL EXFILTRATION TRENCH BE SURCHARGED? PROVIDE
 A DETAIL FOR THE CONTROL STRUCTURE FOR THE EXFILTRATION
 TRENCH.
  
 3. SUGGEST ADDING STRUCTURES ON THE STORM PIPE BEING
 DEFLECTED AROUND THE CLUBHOUSE EXPANSION. THESE WILL
 PROVIDE MAINTENANCE ACCESS TO THE STORM PIPE.
  
 4. HOW WILL NEW EXFILTRATION TRENCH PIPE CONNECT TO THE
 EXISTING DRAINAGE PIPE? COULD THE EXFILTRATION SYSTEM
 CONNECT DIRECTLY INTO EX-S12?
  
 5. LEADER ARROW FOR "STORM PIPE" LABEL ON LANDSCPAE
 PLAN LP-1.02 APPEARS TO POINT TO WALL INSTEAD OF THE
 PIPE LINE.
  
 6. DRAINAGE PERMIT MAY BE REQUIRED FROM THE NOTHERN
 PALM BEACH COUNTY IMPROVEMENT DISTRICT.
  
 TRACY L. WARD, P.E.
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved