2017-10-17 10:31:45THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 SEPTEMBER 28, 2017 SUBMITTAL PACKAGE:
  
 1. PROVIDE TYPICAL CROSS SECTIONS OF THE SAPODILLA AVE
 LANE ADDITIONS FROM THE EAST BACK OF CURB TO BACK OF
 SIDEWALK ALONG THE PROPOSED WEST RIGHT-OF-WAY.
  
 2. PROVIDE CROSS SECTION OF SAPODILLA AVE AT VALET
 DRIVEWAY FROM EAST BACK OF CURB CURB OF SAPODILLA AVE
 TO BEYOND THE HIGH POINT OF THE DRIVEWAY.
  
 3. CHECK PROPOSED GRADES OF SAPODILLA AVE. THERE IS A
 FLAT SPOT ALONG THE CURB LINE AND STEEP CROSS SLOPE
 SOUTH OF THE VALET PARKING DRIVEWAY.
  
 4. CROSS SLOPES FOR INTERIOR AND EXTERIOR CROSSWALKS
 SHOULD NOT EXCEED 2%. PROVIDE SPOT GRADES ON THE
 GRADING PLANS THAT MEET THIS ADA DESIGN CRITERIA.
  
 5. ADD DRAINAGE STRUCTURES BEFORE (UPSTREAM OF) THE
 CROSS WALKS AT THE INTERSECTION OF IRIS AND SAPODILLA
 TO LIMIT THE AMOUNT OF STORMWATER RUNOFF FLOWING ACROSS
 THE CROSSWALKS.
  
 6. IDENTIFY WHERE THE ONSITE DRAINAGE CONTROL
 STRUCTURES WILL BE. ONSITE DRAINAGE SYSTEMS SHOULD BE
 LOCATED UPSTREAM OF THE CONTROL STRUCTURES.
  
 7. THE ADDITIONAL PARKING AREA FOR THE LOADING ZONE
 APPEARS TO HAVE A 10% CROSS SLOPE.
  
 8. DEMOLITION PLAN CALLS OUT THE CONVERSION OF AN
 EXISTING CATCH BASIN (APPROXIMATELY 200 FEET WEST OF
 THE CROSS WALK AT S. SAPODILLA) TO A STORM MANHOLE AND
 THE REMOVAL OF THE STORM PIPE TO THE WEST OF THE CATCH
 BASIN. THE PGD PLANS SHOW CONSTRUCTION OF 18? RCP FROM
 THIS CATCH BASIN TO STRUCTURE S-10. SHOULD THE EXISTING
 CATCH BASIN REMAIN A CATCH BASIN TO LIMIT THE SPREAD OF
 WATER AT STRUCTURE S-10?
  
 9. THE PROPOSED BULBOUT AT IRIS AND SAPODILLA APPEARS
 TO INTERRUPT THE DRAINAGE FLOW PATTERN.
  
 10. DESIGN GRADING OF VALET DRIVEWAY AND STRUCTURE S-3
 TO PREVENT BY-PASS OF THE STRUCTURE DUE TO THE STEEP
 SLOPE OF THE DRIVEWAY.
  
 11. LIST VERTICAL DATUM ON THE PGD PLANS. ALTHOUGH THE
 VERTICAL DATUM IS LISTED ON THE GENERAL NOTES SHEET,
 THIS SHEET IS NOT ALWAYS WITH THE PGD PLANS.
  
 12. WIDTH OF HANDICAP PARKING SPACE (11 FEET) (SHEET
 SMP-1) DOES NOT MATCH THE H.C. PARKING DETAIL (SHEET
 PDD-2).
  
 13. CONSIDER PLACING STOP SIGNS (R1-1) INSTEAD OF YIELD
 HERE TO PEDESTRIAN SIGNS (R1-5) ON THE VALET PARKING
 DRIVEWAY (SHEET SMP-1)
  
 14. SUBMIT A COPY OF THE SFWMD PERMIT MODIFICATION FOR
 THE KRAVIS CENTER SITE WITH THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION.
  
 15. SUBMIT A COPY OF THE SFWMD PERMIT MODIFICATION
 (CITY PLACE PERMIT?) FOR THE SAPODILLA AVE ROAD
 WIDENING WITH THE ENGINEERING DEVELOPMENT APPROVAL
 APPLICATION.
  
 16. OKEECHOBEE BLVD IS MAINTAINED BY THE FLORIDA
 DEPARTMENT OF TRANSPORTATION. PERMITS WILL BE NEEDED
 FROM FDOT FOR WORK WITHIN OKEECHOBEE BLVD RIGHT-OF-WAY.
 PROVIDE A COPY OF FDOT PERMIT FOR IMPROVEMENTS PROPOSED
 WITHIN THE OKEECHOBEE BLVD. RIGHT-OF-WAY WITH THE
 ENGINEERING DEVELOPMENT APPROVAL APPLICATION.
  
 17. MINIMUM 2 FEET OF FREEBOARD ABOVE THE BASE FLOOD
 ELEVATION IS NOW REQUIIRED FOR STRUCTURES WITHIN
 SPECIAL FLOOD HAZARD AREAS AS INDICATED ON THE NEW FEMA
 FIRMS.
  
 18. REVIEW SPREAD ON WEST SIDE OF SAPODILLA AVE. TO
 DETERMINE NEED FOR CATCH BASIN.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved