| Date |
Text |
| 2016-08-09 14:59:36 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP:// |
| | WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER |
| | MITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. THE LANDSCAPE PLAN SHOWS TREES BEING PLANTED OVER OR |
| | NEAR EXISTING AND PROPOSED STORMWATER PIPES. |
| | |
| | 2. ONSITE STORMWATER SYSTEM TO PROVIDE REQUIRED |
| | PRE-TREATMENT PER SFWMD REGULATIONS. |
| | |
| | 3. MODIFY ROOT BARRIER DETAIL TO INCLUDE CITY?S |
| | UTILITIES. |
| | |
| | 4. EASEMENT WILL BE NEEDED FOR THE PORTION OF |
| | STORMWATER SYSTEM BETWEEN THE BOYD STREET RIGHT-OF-WAY |
| | AND OUTFALL INTO THE STUB CANAL. |
| | |
| | 5. ELIMINATE THE PIPE BETWEEN STRUCTURES S-103 AND |
| | S-104. THE ONSITE DRAINAGE SYSTEM CAN USE THE 18? RCP |
| | OUTFALL FROM S-103. |
| | |
| | 6. A CONTROL STRUCTURE WILL BE NEEDED FOR THE |
| | EXFILTRATION TRENCH SYSTEM. |
| | |
| | 7. REVIEW THE LOCATION OF THE EXFILTRATION TRENCH NEXT |
| | TO THE PROPOSED EXPANSION. THE EFFICIENCY OF |
| | EXFILTRATION TRENCH SYSTEMS DECREASE OVER TIME AND THE |
| | TRENCH WILL HAVE TO BE REPLACED IN ORDER TO BECOME |
| | FUNCTIONAL AGAIN. |
| | |
| | 8. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE |
| | AVAILABLE AT |
| | HTTP://MAPS.CO.PALM-BEACH.FL.US/GIS/FLOODZONES.ASPX?. |
| | PLEASE REVIEW THE MAPS AND VERIFY THAT THE NEW MAPS |
| | WILL NOT IMPACT THE PROPOSED PROJECT. |
| | |
| | 9. APPLICANT SHOULD MEET WITH FERDINAND RIVERA |
| | (822-2076) OF PUBLIC WORKS TO REVIEW SERVICEABILITY OF |
| | DUMPSTER IN NEW PROPOSED LOCATION. PROVIDE AN AUTOTURN |
| | ANALYSIS SHOWING ACCESS TO AND FROM THE DUMPSTER FROM |
| | BOTH DIRECTIONS ON MERCER AVE. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. PROVIDE ENGINEERING CALCULATIONS SIGNED AND SEALED |
| | BY A FLORIDA REGISTERED PROFESSIONAL ENGINEER |
| | INDICATING THE CHANGES TO THE ONSITE PEAK FLOOD STAGES |
| | WILL NOT EXCEED THE SFWMD PERMITTED FLOOD STAGES. |
| | |
| | 3. DETAILS SHEETS WILL NEED TO UTILIZE CITY OF WEST |
| | PALM BEACH STANDARD DETAILS, WHICH MAY BE DOWNLOADED AT |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FO |
| | RMS,-PERMITS-APPLICATIONS |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |
Print |