| 2016-07-12 17:14:24 | THIS IS A PRELIMINARY REVIEW OF THE CONCEPTUAL CIVIL | | | PLAN. ADDITIONAL COMMENTS ARE EXPECTED WHEN DRAWINGS | | | ARE SUBMITTED FOR ENGINEERING DEVELOPMENT APPROVAL | | | APPLICATION. | | | 1. THE CITY IS REVIEWING THE EXISTING WATER AND SEWER | | | MAINS AND CONNECTIONS (LOCATION, ALIGNMENT, PIPE SIZE, | | | VALVES, FIRE HYDRANT, ETC) AS CURRENTLY DEPICTED ON | | | SHEET C-3 | | | 2. PLEASE CHANGE WATER MAIN PIPE DIAMETER FROM 16 FT | | | TO16 INCHES, SANITARY SEWER FROM 8 FT TO 8 INCHES, AND | | | FORCE MAIN FROM 24 FT TO 24 INCHES | | | 3. PLEASE ADD THE EXISTING WATER METER AND METER | | | BOX/VAULT AND CALL OUT THE METER SIZE | | | 4. PLEASE PROVIDE CALCULATIONS FOR THE INCREASED WATER | | | DEMAND (AVERAGE AND PEAK) AND DEMONSTRATE THAT THE | | | EXISTING METER SIZE IS ADEQUATE FOR THE ADDITIONAL | | | DEMAND | | | | | | LAURA LE, PE | | | PUBLIC UTILITIES ENGINEER | | | ENGINEERING DEPARTMENT | | | 561-494-1093 | | | [email protected] |
| |
Print |
|