| 2016-06-09 08:58:01 | CITY OF WEST PALM BEACH |
| | ENGINEERING DEPARTMENT |
| | PUBLIC UTILITY COMMENTS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. PLEASE SUBMIT SIGNED & SEALED ENGINEER/MEP WATER AND |
| | SEWER DEMAND CALCULATIONS (AVERAGE AND PEAK) FOR METER |
| | SIZING SELECTION AND SERVICE SIZING. PLEASE ALSO |
| | PROVIDE CALCULATION FOR FIRE FLOW DEMAND; |
| | |
| | 2. PLEASE INCLUDE APPLICABLE CITY OF WEST PALM BEACH |
| | STANDARD WATER AND SEWER DETAILS TO THE DETAILS SHEET. |
| | CONTACT THE ENGINEERING SERVICES DEPARTMENT (561) |
| | 494-1040 FOR THE LATEST REVISED DETAILS. |
| | |
| | 3. PLEASE PROVIDE THE FIRE HYDRANT FLOW TEST DATA FROM |
| | EXISTING FIRE HYDRANT USED FOR DESIGN; |
| | |
| | 4. PLEASE PROVIDE UTILITY CROSSING INFORMATION; |
| | |
| | 5. PLEASE LABEL CITY UTILITY PIPE SIZE AND MATERIAL; |
| | |
| | 6. PLEASE CALL OUT POINT OF SERVICE FOR WATER AND |
| | SEWER; |
| | |
| | 7. PLEASE SHOW EXISTING VALVES FOR WATER DISTRIBUTION |
| | SYSTEM FOR CONSTRUCTION COORDINATION PURPOSES (SYSTEM |
| | SHUTDOWNS, ETC.); |
| | |
| | 8. PLEASE ADD EXISTING AND/OR PROPOSED FRANCHISE |
| | UTILITIES (SIZE AND MATERIAL), IF ANY |
| | |
| | LAURA LE, PE |
| | PUBLIC UTILITIES ENGINEER |
| | 561-494-1093 |
| | [email protected] |
| | |
| | |
| 2016-06-08 07:52:46 | CITY OF WEST PALM BEACH |
| | ENGINEERING DEPARTMENT |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL. |
| | |
| | 1. PLEASE VERIFY THAT THE EXISTING ENVIRONMENTAL |
| | RESOURCE PERMIT INCLUDES THE IMPROVEMENT SHOWN ON THE |
| | PROPOSED SITE PLAN MODIFICATIONS. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL MODIFICATION |
| | WILL BE REQUIRED FROM THE ENGINEERING DIVISION OF THE |
| | PUBLIC WORKS DEPARTMENT. |
| | |
| | 2. PLEASE COORDINATE WITH THE CITY PUBLIC UTILITIES |
| | ENGINEER (LAURA LE) PRIOR TO FINALIZING THE PROPOSED |
| | UTILITY TIE IN LOCATIONS AND CONFIGURATION. |
| | |
| | 3. THE INCREASE IN SOLID WASTE YARDAGE WILL NEED TO BE |
| | VERIFIED AS PART OF THE FINAL DESIGN TO VERIFY THAT THE |
| | DESIGN INCLUDES APPROPRIATE NUMBER AND SIZE OF TRASH |
| | BINS. |
| | |
| | KELLY CRANFORD, P.E. |
| | CAPITAL IMPROVEMENT PLAN MANAGER |
| | [email protected] |
| | 561-494-1098 |
| | |
| | BRIAN COLLINS, P.E. |
| | INTERIM DIRECTOR OF ENGINEERING/CITY TRAFFIC ENGINEER |
| | [email protected] |
| | 561-494-1040 |
| | |
| | VINCE NOEL, PSM |
| | CITY SURVEYOR / REAL ESTATE SUPERVISOR |
| | [email protected] |
| | 561-494-1096 |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | 561-494-1120 |
| | [email protected] |
| | |
| | LAURA LE, PE |
| | PUBLIC UTILITIES ENGINEER |
| | 561-494-1093 |
| | [email protected] |
| | |
| |
Print |