| 2016-04-11 08:19:36 | CITY OF WEST PALM BEACH |
| | PUBLIC WORKS DEPARTMENT |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. PLEASE SUBMIT ESTIMATES FOR THE PEAK POTABLE WATER |
| | DEMAND, SANITARY SEWER FLOW, AND SOLID WASTE COLLECTION |
| | YARDAGE. |
| | |
| | 2. DETAILS SHEETS WILL NEED TO UTILIZE STANDARD CITY OF |
| | WEST PALM BEACH DETAILS, WHICH MAY BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 3. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE |
| | AVAILABLE AT HTTP://WWW.CO.PALM-BEACH.FL.US/NEWSROOM/08 |
| | 14/08-26-14-FLOOD_MAPS.HTM. PLEASE REVIEW THE MAPS AND |
| | VERIFY THAT THE NEW MAPS WILL NOT IMPACT THE PROPOSED |
| | PROJECT. |
| | |
| | 4. PLEASE SHOW THE SIGHT TRIANGLES ON THE LANDSCAPING |
| | PLANS FOR THE INTERSECTIONS AND VEHICULAR EXITS. |
| | (SECTION 94.305E, CODE OF ORDINANCES) |
| | |
| | 5. PLEASE COORDINATE WITH THE CITY ENGINEERING STAFF |
| | (LAURA LE) FOR THE PROPOSED UTILITY TIE IN LOCATIONS. |
| | THE AGE AND CONDITION OF THE EXISTING PIPES MAY NOT BE |
| | ADEQUATE FOR THE PROPOSED CONNECTIONS. |
| | |
| | 6. INDICATE MILLING AND RESURFACING LIMITS AROUND |
| | TRENCH CUTS ON CITY STREETS. |
| | |
| | 7. PLEASE ALSO SHOW THE LOCATIONS OF ROOF DRAINS AND |
| | INDICATE WHERE THE DISCHARGE WILL BE DIRECTED. RUNOFF |
| | VELOCITY AND VOLUME SHOULD NOT EXCEED EXISTING |
| | CONDITIONS. |
| | |
| | 8. CHECK CALLOUT FOR FIRE DEPARTMENT CONNECTION ON |
| | SHEETS LP.1 AND C-2. |
| | |
| | 9. CONFIRM THE PROPOSED DRY DETENTION AREA WILL HAVE A |
| | TOP OR A TOE OF SLOPE ELEVATION OF 13.00 ON SHEET C-1. |
| | |
| | 10. PROVIDE A CROSS SECTION OF THE DRY DETENTION AREA. |
| | |
| | 11. SEWER SERVICE LATERALS SHOULD HAVE MINIMUM SLOPE OF |
| | 1% (AS OPPOSED TO 1% MAXIMUM SLOPE) ON SHEET C-2. |
| | |
| | 12. THE ARCHITECTURAL PLANS SHOW A SECOND FLOOR PLAN. |
| | THE ENGINEERING AND LANDSCAPE PLANS CALLOUT A PROPOSED |
| | ONE STORY ADDITION. |
| | |
| | 13. ENGINEERING PLANS WERE NOT SIGNED AND SEALED. |
| | |
| | 14. ROOT BARRIERS MAY BE REQUIRED WHERE PLANTINGS ARE |
| | NEAR UNDERGROUND STORMWATER, SANITARY, OR POTABLE WATER |
| | LINES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING DIVISION OF THE PUBLIC |
| | WORKS DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL |
| | APPLICATION FORMS CAN BE DOWNLOADED AT: |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 2. SOLID WASTE YARDAGE WILL NEED TO BE VERIFIED AS PART |
| | OF THE FINAL DESIGN TO VERIFY THAT THE DESIGN INCLUDES |
| | APPROPRIATE NUMBER AND SIZE OF TRASH BINS. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | 561-494-1120 |
| | [email protected] |
| | |
| | KELLY CRANFORD, P.E. |
| | CAPITAL IMPROVEMENT PLAN MANAGER |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |
| | VINCE NOEL, PSM |
| | CITY SURVEYOR / REAL ESTATE SUPERVISOR |
| | [email protected] |
| | 561-494-1096 |
| | |
| | BRIAN COLLINS, PE |
| | CITY TRAFFIC ENGINEER |
| | [email protected] |
| | 561-494-1040 |
| | |
| | LAURA LE, PE |
| | PUBLIC UTILITIES ENGINEER |
| | 561-494-1093 |
| | [email protected] |
| | |
| |