Plan Review Notes
Plan Review Notes For Project Z16020016
Project Number Z16020016
Review Stop STORM
Sequence Number 3
Notes
Date Text
2019-07-18 16:12:50THE FOLLOWING COMMENTS CAN BE MADE CONDITIONAL APPROVAL
 OF THE SITE PLAN:
  
 1.STORMWATER MANAGEMENT SYSTEM TO BE DESIGNED PER SFWMD
 CRITERIA FOR WATER QUALITY TREATMENT AND PEAK FLOW
 ATTENUATION. ONLY ONE CONNECTION WILL BE ALLOWED TO THE
 CITY?S MS4. EXISTING CONDITIONS TO BE CONSIDERED
 UNDEVELOPED LAND.
  
 2.SURVEY AND ENGINEERING PLANS ARE TO USE THE SAME
 VERTICAL DATUM. THE SURVEY USED NAVD 1988. THE
 ENGINEERING PLANS LIST NGVD1929.
  
 3.THE CITY?S VERTICAL DATUM IS NGVD 1929. THE CITY HAS
 ALLOWED THE USE OF NAVD 1988 PROVIDED THE CONVERSION
 EQUATION TO NGVD 1929 IS PROVIDED ON THE SHEET(S). ALL
 SHEETS WITH ELEVATION INFORMATION SHALL LIST THE
 VERTICAL DATUM USED AND THE CONVERSION EQUATION TO
 NGVD1929.
  
 4.THE EXISTING WATER SERVICE LINES TO THE PROJECT SITE
 ARE TO BE CUT AND CAPPED AT THE MAIN IF NOT UTILIZED
 FOR THE PROPOSED DEVELOPMENT.
  
 5.THE EXISTING SANITARY SEWER LATERALS ARE TO BE
 REMOVED AND PLUGGED AT THE MAIN IF NOT USED FOR THE
 PROPOSED DEVELOPMENT.
  
 6.SHOW PROPOSED UTILITIES ON THE LANDSCAPE PLANS.
 PROVIDE HORIZONTAL CLEARANCE TO UTILITIES AND ROOT
 BARRIERS PER PUBLIC UTILITIES GUIDELINES.
  
 7.PROVIDE CCTV OF THE CITY?S MS4 PRIOR TO SUBMITTAL OF
 ENGINEERING PERMIT APPLICATION.
  
 TRACY L. WARD, P.E.
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  