Plan Review Notes
Plan Review Notes For Project Z16020016
Project Number Z16020016
Review Stop ENG - PPRC
Sequence Number 3
Notes
Date Text
2018-02-13 11:50:34CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DEPARTMENT
 DATE: 02/13/2018
 PROJECT: INDIGO HOTEL
 ADDRESS: 3RD ST & W RAILROAD AVE
 STATUS: FAILED
  
 THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. FOLLOWING COMMENTS NEED TO BE
 ADDRESSED PRIOR TO SITE PLAN APPROVAL:
  
 1. SUBMIT ESTIMATES FOR WATER AND FIRE DEMAND, BOTH
 AVERAGE AND PEAK FLOW WITH PEAKING FACTOR. ALSO SUBMIT
 ESTIMATES OF SANITARY SEWER FLOW FOR THE PROPOSED
 DEVELOPMENT. SHOW PROJECTED DEMANDS ON THE UTILITY PLAN
 SHEET;
  
 2. THE AVAILABLE WATER PRESSURE IN THIS PORTION OF THE
 CITY MAY NOT BE ACCEPTABLE AT ELEVATIONS HIGHER THAN
 THE 2ND FLOOR. WE RECOMMEND A LONG-TERM PRESSURE STUDY
 BE PERFORMED PRIOR TO FINALIZATION OF THE UTILITY
 DESIGN;
  
 3. A MAINTENANCE AGREEMENT WILL BE REQUIRED FOR THE
 NON-STANDARD ELEMENTS (TREES AND TREE GRATES; PAVERS,
 ETC.) PROPOSED WITHIN RIGHT-OF-WAYS;
  
 4. CONSIDER RELOCATING THE BACKFLOW PREVENTERS TO BE
 LOCATED AS CLOSED TO THE RIGHT-OF-WAY AS POSSIBLE.
 ANOTHER OPTION IS TO ENCASE THE PIPE UP TO THE BACKFLOW
 PREVENTERS WHICH WILL NEED TO BE APPROVED BY CUSTOMER
 SERVICE;
  
 5. ADVISORY: GENERALLY VAULTS FOR DOMESTIC METERS
 RANGES UP TO 20 LF. ROTATE THE VAULT 90 DEGREES TO
 OBTAIN THE NECESSARY SPACE FOR THE VAULT WHICH WILL
 CONFLICT WITH PROPOSED TREE GRATE;
  
 6. ON THE SE CORNER OF THE PROPERTY THERE IS A CURB
 RAMP PERPENDICULAR TO 3RD STREET WITH NO PROPOSED CURB
 RAMP ON THE SOUTH SIDE OF 3RD STREET. PLEASE COORDINATE
 WITH CITY TRANSPORTATION ENGINEER, ERIK FERGUSON ON THE
 LOCATION OF THE PROPOSED CURB RAMP/CROSSWALK;
  
 7. ON THE NE CORNER OF THE PROPERTY THE CURB RAMP DOES
 NOT ALIGN WITH THE NORTH CURB RAMP ON 4TH STREET. THE
 CURB RAMP ALSO CONFLICTS WITH THE PROPOSED STORM INLET.
 PLEASE REDESIGN TO AVOID CONFLICT;
  
 8. SHOW PROPERTY LINE ON THE PLANS;
  
 9. ADD A NORTH ARROW ON THE LOCATION MAP;
  
 10. PLANNING AND GRADING PLANS WERE NOT SUBMITTED
 DURING THIS PLAN REVIEW;
  
 11. A ROAD WIDTHS TO THE PLANS FROM RIGHT-OF-WAY TO
 RIGHT-OF-WAY;
  
 AFTER THE SITE PLAN IS APPROVED, IN THE NEXT PHASE, THE
 FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL:
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED FROM THE FOLLOWING WEBSITE LINK: HTTP
 ://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-
 PERMITS-APPLICATIONS
  
 2. PLEASE SUBMIT THE LATEST VERSION OF THE 'AUTO-CALC
 CERTIFIED COST ESTIMATE FORM' FOR SUBMISSION TO CITY OF
 WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL
 WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE
 FOLLOWING LINK: HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-
 PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 3. SUBMIT WITH THE ENGINEERING DEVELOPMENT APPROVAL
 APPLICATION SIGNED & SEALED ENGINEER/MEP WATER AND
 SANITARY SEWER CALCULATION (IN DETAIL I.E. AVERAGE AND
 PEAK WITH PEAKING FACTOR). SUBMIT CALCULATIONS TO
 VALIDATE METER SIZE SELECTION. SHOW THESE CALCULATIONS
 ON THE UTILITY PLAN SHEET AS WELL;
  
 4. SHOW THE NEAREST FIRE HYDRANT TO THIS SITE ON THE
 FINAL UTILITY PLAN. FIRE HYDRANT FLOW TEST DATA FROM
 EXISTING FIRE HYDRANT WILL BE REQUIRED PART OF THE PLAN
 SUBMITTAL. SHOW HYDRANT FLOW TEST DATA RESULT ON THE
 PLANS;
  
 5. FIRE HYDRANT TEST CAN BE REQUESTED AT (561)804-4700;
  
 6. ALL PROPOSED FIRE DEPARTMENT CONNECTIONS SHALL BE
 WITHIN 100 FEET OF A FIRE HYDRANT AND SHALL BE WITHIN
 AN EASEMENT WITHIN THE PROPERTY;
  
 7. PLACEMENT OF THE ANY PROPOSED METER, BACKFLOW
 PREVENTER, DCDA ETC. SHALL BE INSTALLED PER THE CITY'S
 STANDARD DETAILS. WATER METER SHOULD BE WITHIN THE
 RIGHT-OF-WAY OR INSIDE AN 'UTILITY EASEMENT' JUST
 INSIDE THE PROPERTY NEAR THE RIGHT-OF-WAY AND
 ACCESSIBLE;
  
 8. IN THE FINAL PLANS, MUST PROVIDE UTILITY CONFLICT
 TABLE (BOTTOM AND TOP OF CROSSING PIPES) AT THE
 CONFLICT POINTS OF ALL WATER, STORM AND SANITARY SEWER
 PIPES AS WELL AS OTHER FRANCHISE UTILITIES. EXISTING
 UTILITIES WITHIN THE PROPOSED SANITARY SEWER LATERAL
 ARE TO BE VERIFIED VIA SOFTDIGS, PROVIDE ALL UTILITY
 CROSSING INFORMATION;
  
 9. IN THE FINAL PLANS, SHOW DIRECTION OF FLOW FOR THE
 EXISTING SANITARY SEWER. SHOW INVERT AT CONNECTION
 POINTS AND INCLUDE A PROFILE FOR THE PROPOSED SERVICE
 LATERAL WITH GROUND ELEVATIONS ABOVE THE PIPE;
  
 10. PAVEMENT RESTORATION FOR OPEN CUT/TRENCH FOR
 UTILITY CONNECTION WORKS WILL NEED TO BE IN ACCORDANCE
 WITH 2016 CITY STANDARD DETAIL GC-9. THE ROAD SHALL BE
 MILLED/RESURFACED FOR FULL LANE WIDTH OF THE TRAVEL
 LANE(S) ENCROACHED BY THE TRENCH AREA, INCLUDING A
 TRANSITION AREA OF 50 FEET ON EACH SIDE OF THE TRENCH.
 PLEASE SHOW ON THE FINAL PLANS THE EXTENT OF THE
 MILLING AND RESURFACING;
  
 11. SHOW ON THE FINAL PLANS SIZE AND MATERIAL OF ALL
 EXISTING UTILITIES ON 3RD STREET, 4TH STREET AND WEST
 RAILROAD AVE INCLUDING BUT NOT LIMITED TO WATER, SEWER,
 GAS, UNDERGROUND ELECTRIC CONDUITS ETC. PLEASE IDENTIFY
 THE SOURCE OF THE AS-BUILT INFORMATION UTILIZED FOR THE
 POTABLE WATER, SANITARY SEWER, AND STORM SEWER DESIGN;
  
 12. FOR THE FINAL WATER AND SEWER PLANS, INCLUDE A NOTE
 THAT: AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM
 BEACH CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW: HT
 TP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLICA
 TIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 SOFIA QUINONES-BENEJAM, EI
 PROJECT ENGINEER
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33402
 (MAILING ADDRESS: PO BOX 3366)
 P: 561.494.1108
 C: 561.459.6518
 F: 561.494.1116
 EMAIL: [email protected]
  
  