| Date |
Text |
| 2016-03-08 15:04:10 | CITY OF WEST PALM BEACH |
| | PUBLIC WORKS DEPARTMENT |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL. |
| | |
| | 1. PLEASE SUBMIT A COPY OF THE SURVEY. |
| | |
| | 2. PLEASE REVISE THE COVER SHEET TO REFLECT THE CORRECT |
| | DEPARTMENT. (DEPARTMENT OF ENGINEERING SERVICES DOES |
| | NOT EXIST.) |
| | |
| | 3. PLEASE SPECIFY THE VERTICAL DATUM ON THE CIVIL |
| | PLANS. |
| | |
| | 4. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE |
| | AVAILABLE AT HTTP://WWW.CO.PALM-BEACH.FL.US/NEWSROOM/08 |
| | 14/08-26-14-FLOOD_MAPS.HTM. PLEASE REVIEW THE MAPS AND |
| | VERIFY THAT THE NEW MAPS WILL NOT IMPACT THE PROPOSED |
| | PROJECT. |
| | |
| | 5. DETAILS SHEETS WILL NEED TO UTILIZE STANDARD CITY OF |
| | WEST PALM BEACH DETAILS, WHICH MAY BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 6. WHAT IS BEING DISCHARGED FROM THE SUMP DRAIN INTO |
| | THE DRAINAGE SYSTEM? |
| | |
| | 7. PLEASE REVIEW THE PROPOSED CATCH BASIN INLET FOR |
| | CONSTRUCTABILITY AND SEPARATION REQUIREMENTS. THE |
| | PROPOSED CATCH BASIN INLET IS LESS THAN 3 FEET FROM 60? |
| | PIPE LINE AND LESS THAN 5 FEET FROM 30? RAW WATER LINE. |
| | PLEASE ALSO REVIEW THE LOCATION OF THE PROPOSED |
| | EXFILTRATION TRENCH, WHICH IS LESS THAN 5 FEET FROM 30? |
| | RAW WATER LINE. |
| | |
| | 8. HOW MUCH COVER WILL REMAIN OVER THE EXISTING |
| | DRAINAGE SYSTEM IN THE DRY RETENTION POND? |
| | |
| | 9. DRY RETENTION POND APPEARS TO HAVE 1:1 SIDE SLOPES. |
| | HOW WILL THIS BE MAINTAINED? |
| | |
| | 10. PLEASE REVISE THE PLANS TO COMPLY WITH CODE SECTION |
| | 94-485 FOR PARKING LOT STRIPING (DOUBLE LINES CONNECTED |
| | AT END). |
| | |
| | 11. ARE PAVERS PROPOSED AS PART OF THE PROJECT? |
| | STRIPING DETAIL CALLS OUT MATERIAL FOR PAVER SYSTEMS. |
| | |
| | 12. NO DIRECT STORMWATER RUNOFF FROM ROADWAY AND |
| | PARKING LOTS SHOULD ENTER INTO EAST LAKE. RUNOFF SHOULD |
| | BE COLLECTED IN INLETS, SWALES OR DRY RETENTION AREAS. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING DIVISION OF THE PUBLIC |
| | WORKS DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL |
| | APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 2. PLEASE PROVIDE A COPY OF THE MODIFICATION OF SFWMD |
| | PERMIT. |
| | |
| | |
| | KELLY CRANFORD, P.E. |
| | CAPITAL IMPROVEMENT PLAN MANAGER |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |
| | VINCE NOEL, PSM |
| | CITY SURVEYOR / REAL ESTATE SUPERVISOR |
| | [email protected] |
| | 561-494-1096 |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | 561-494-1120 |
| | [email protected] |
| | |
| | |
| |
Print |