Date Text
2017-02-01 12:01:19ADDITONAL COMMENTS FOR DAC SPECIAL REVIEW:
 1. STAFF RECOMMENDS THE BUILDING ENTRANCE TO THE
 RESIDENTIAL USE SHALL HAVE SOME ARCHITECTURAL TREATMENT
 THAT DIFFERENCIATES THE CORNER FROM THE RETAIL PORTION
 OF THE BUILDING.
 2. STAFF IS RECOMMENDING THE ALLEY OPENING TO BE
 REDUCED FROM THE PROPOSED 26'-6" TO 22'. THE DOWNTOWN
 ALLEYS ARE ENVISIONED AS SHARED ROADS AND DO NOT NEED A
 SEPARATE SIDEWALK.
 3. PLEASE PROVIDE WINDOWS ON THE TWO RETAIL WALLS
 FACING THE ALLEY.
 4. PLEASE LOOK AT THE OPTION TO TAKE THE GLASS BREAK
 PROPOSED ALL THE WAY DOWN AND RECESS IT THE NECESSARY
 AMOUNT TO COMPLY WITH THE PLANAR BREAK REQUIREMENTS ON
 THE DATURA ELEVATION. PLEASE JUSTIFY THE VARIANCE
 REQUEST IF NEEDED.
 5. PLEASE PROPOSE SOME OPTIONS TO MAKE THE ALLEY
 CIRCULATION MORE ATTRACTIVE FOR PEDESTRIANS AND
 MINIMIZE THE NEGATIVE IMPACT OF THE GARAGE OVER THE
 ALLEY. SUGGEST HOW THE PAVERS ON ROSEMARY ARE GOING TO
 TRANSITION INTO THE ALLEY MATERIAL. STAFF SUFFEST THE
 ALLEY MATERIAL SHALL BE ENHANCED BEYOND SIMPLE ASPHALT
 COAT.
 6. PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE
 WITH BLANK WALL REGULATION ON THE EAST FACADE.
 TREATMENT OF THE GARAGE WALL FACING EAST.
 7. STAFF RECOMMENDS THE STAGGERED SETBACK ON THE UPPER
 LEVELS OF THE CLEMATIS ELEVATION (ABOVE PODIUM) TO BE
 LARGER, MINIMIZING THE IMPACT OF THE 12 STORY BUILDING
 ON THE HISTORIC DISTRICT.
 8. STAFF RECOMMENDS THE BRICK FACADE TO PROJECT BELOW
 THE MINIMUM CELARANCE REQUIRED FOR THE ALLEY TO
 ACCOMPLISH A BETTER PEDESTRIAN SCALE FOR THE 1ST FLOOR
 OF THE BUILDING. EXACT DIMENSION TO BE DETERMINED WITH
 ENGINEERING TOENSURE CLEARANCE FOR TRUCKS ENTERING THE
 ALLEY IS PROVIDED.
 9. AWNINGS ON DATURA SHALL REFLECT THE SMALLER SIZE
 ALREDY INCLUDED IN THE ROSEMARY ELEVATIONS.
 10. ARE THE ROUND COLUMNS ON THE FIRST FLOOR FREE
 STANDING SEPARATED FROM THE GLASS STOREFRONT?
 RENDERINGS SEEM TO INDICATE THAT, BUT FLOOR PLANS ARE
 NOT.
  
  
 1. TDR APPROVAL STILL NEEDED. HPB APPROVAL DONE-SITE IS
 WITHIN A HISTORIC DISTRICT AND AS SUCH APPROVAL FROM
 THE HISTORIC PRESERVATION BOARD IS REQUIRED. IN
 ADDITION, AND DUE TO PROPOSED UTILIZATION OF THE TDR
 INCENTIVE PROGRAM, THE SITE REQUIRES APPROVAL FROM THE
 DOWNTOWN ACTION COMMITTEE (SPECIAL REVIEW STANDARDS).
 2. DONE- SETBACK ON ROSEMARY AVENUE SHALL BE MEASURED
 FROM THE BACK OF THE PLANTER CURB.
 3. DONE- PAVERS ON ROSEMARY AVENUE SHALL MATCH EXISTING
 PAVERS IN COLOR, PATTERN, TEXTURE ETC.
 4. DONE- FIRST FLOOR ALONG ROSEMARY AVENUE COMPLIES
 WITH THE MINIMUM 228.8 RETAIL REQUIREMENT. HOWEVER,
 STAFF RECOMMENDS THE RELOCATION OF THE FITNESS CENTER
 AND THE USE OF THE PROMINENT CORNER SPACE FOR THE LOBBY
 ENTRANCE OR COMMERCIAL SPACE (OFFICES ALLOWED- RETAIL
 ALLOWED BUT NOT REQUIRED).
 5. NOT SATISFIED. PLEASE CONFIRM FINAL DECISION ON
 ALLOWING THE DUMPSTER TO BE ROLLED OUT TO THE ALLEY FOR
 PICK UP- PLEASE EXPLAIN THE GARBAGE COLLECTION
 OPERATION. WHAT TYPE OF CONTAINER/PICK UP IS PROPOSED?
 - 1ST REVIEW: PLEASE INDICATE HOW IS THE GARBAGE
 PICK-UP OPERATION (CIRCULATION, STAGING, PRIVATE OR
 PUBLIC).
 6. DONE-PARTIALLY SATISFIED - PLEASE INDICATE THE RAMP
 SLOPE IN PERCENTAGE AND IN ALL RAMPS PROPOSED WITHIN
 THE GARAGE - 1ST REVIEW: PLEASE INDICATE THE PARKING
 RAMP PROPOSED SLOPE (SEC 94-111 (Q)(2) - NON-PARKING
 RAMP SLOPE HIGHER THAN 14% REQUIRES A BREAK-OVER
 TRANSITION).
 7. DONE- DEAD-END PARKING REQUIRES A TURN-AROUND SPACE.
 8. DONE -NOT SATISFIED - PLEASE PROVIDE ALL THE FLOOR
 LEVELS ABOVE THE 7TH STORY AS IT SEEMS FOR THE
 INFORMATION PROVIDED IN THE FACADES THE UPPER LEVEL ARE
 ALL DIFFERENT AND STEP BACK FROM CLEMATIS AS THEY GO
 HIGHER. - 1ST REVIEW: FACADES AND RENDERING FACING
 NORTH ARE NOT CONSISTENT WITH FLOOR PLANS (CANTILEVER
 CONDITION AND STEP BACK CONDITIONS)
 9. DONE- DATURA ELEVATION DOES NOT SHOW THE GARAGE
 ENTRANCE.
 10. DONE-PARTIALLY SATISFIED- SHEET A2.01 STILL SHOWS
 SETBACK ON CLEMATIS AT 52'.- 1ST REVIEW: ALONG CLEMATIS
 STREET A 56' CONDITIONAL SETBACK IS REQUIRED ABOVE THE
 2ND FLOOR. PROPOSAL SEEMS TO BE AT 52' ONLY. PLEASE
 INCLUDE DIMENSION FROM THE BACK OF THE EXISTING CURB.
 11. DONE- PLEASE PROVIDE AUTO TURN FOR THE LOADING
 AREAS.
 12. - DONE- SITE PLAN SHOWS THE ALLEY OPENING (WALL TO
 WALL) TO BE AROUND 26' WHILE ELEVATION SHOWS THE ALLEY
 OPENING AT 34' IN WIDTH.
 13. NOT SATISFIED- PLEASE LOOK AT DEFINITION OF PLANAR
 BREAK, TABLE IV-4 AND FIGURE IV-21 TO CONFIRM
 COMPLIANCE. FOR COMPLIANCE WITH TRANSPARENCY PLEASE
 SHOW DIAGRAMS ON ELEVATIONS WITH TRANSPARENCY AREAS.-
 1ST REVIEW: PLEASE PROVIDE INFORMATION TO CONFIRM
 COMPLIANCE WITH THE PLANAR BREAK REGULATIONS, AND
 TRANSPARENCY.
 14. DONE-NOT SATISFIED- DUE TO THE HISTORIC NATURE OF
 THE EXISTING BUILDINGS ON CLEMATIS STREET THE TERRACE
 WILL NOT BE PERMITTED ON THE ROOF OF HISTORIC
 BUILDINGS. THE REQUIRED AREA SHALL BE RELOCATED TO THE
 ROOF TOP GARDEN. - 1ST REVIEW:THE SETBACK REQUIRED
 ABOVE THE 2ND STORY, AND PROVIDED IN THIS PROJECT ABOVE
 THE 1ST STORY SHALL BE DESIGNED AS A TERRACE (20% OF
 THE CWD-CD SITE).
 15. DONE- PLEASE DOCUMENT ALL THE EXISTING CONDITIONS
 FOR THE ADJACENT PROPERTY ON THE EAST SIDE OF THE
 SUBJECT PARCEL, AND IDENTIFY ANY POSSIBLE CONFLICTS AND
 IMPACTS.
 16. DONE - AN AERIAL AND UDNERGROUND EASEMENT WILL BE
 PROVIDED. PROJECT LEGAL TEAM TO WORK WITH THE CITY ON
 DRAFT AGREEMENT AND APPROVAL OF EASEMENT.- 1ST REVIEW:
 PROPOSAL TO EXPAND THE BUILDING OVER THE ALLEY SHALL BE
 DISCUSSED FURTHER. INITIAL OPTIONS ARE 1. ABANDONING
 THE ALLEY BUT REQUIRE AN ACCESS AND UTILITY EASEMENT;
 OR 2. AIR RIGHT EASEMENT AND UNDERGROUND EASEMENT.
 17. DONE- PLEASE INDICATE THE CONDITIONS OF THE
 SIDEWALK ON DATURA STREET EAST OF THE PROJECT AND HOW
 IT WILL TRANSITION TO THE NEW HARDSCAPE.
 18. DONE- PLEASE INDICATE INFORMATION ON SITE PLAN
 REFLECTING EXISTING CONDITIONS- 1ST REVIEW:PLEASE
 INDICATE IF ANY ON-STREET PARKING IS GOING TO BE
 REMOVED.
 19. DONE - PLEASE SPECIFY THE PLANTING DETAIL FOR THE
 PROPOSED OAKS ALONG DATURA STREET CONSIDERING THE
 UNDERGROUND PARKING IS BEING PROPOSED UNDER THE
 EXISTING SIDEWALK. ARE THE PROPOSED TREES VIABLE?
  
 ADDITIONAL COMMENTS ON SUBMITTAL PACKAGE:
 19. NOT SATISFIED - SURVEY SHALL INCLUDE THE SQURE
 FOOTAGE OF NORTH AND SOUTH PARCELS SEPARATELY. IT SHALL
 ALSO INCLUDE SIDEWALK DIMENSIONS AND DISTANCE FROM BACK
 OF CURB TO PROPERTY LINE. - 1ST REVIEW: DATA ON SURVEY
 SHOWS TOTAL PARCEL AREA AS 43,584 OR 1.23 ACRE. PLEASE
 CORRECT NUMBER AND PROVIDE SQUARE FOOTAGE FOR THE GROUP
 OF PROPERTIES DESIGNATED CWD-CD AND CWD-10 SEPARATELY.
 SURVEY SHALL INCLUDE MEASUREMENTS OF THE EXISTING
 SIDEWALKS, AND ROW INCLUDING SIDEWALK ACROSS THE
 STREET.
 20. DONE- PLEASE ADJUST THE LOT SIZE AREAS TO BE
 CONSISTENT IN ALL THE DRAWINGS BASED ON THE SURVEY
 INFORMATION.
 21. DONE - PARTIALLY SATISFIED- PLEASE INDICATE THE TWO
 PROPERTY LINES ON DATURA IN SHEET A2.01.- 1ST REVIEW:
 PLEASE INCLUDE PROPERTY LINES AND SETBACK LINES IN ALL
 FLOOR PLANS AND ELEVATIONS.
 22. DONE- SHEET A1.02 DOES NOT SEEM TO BE ACCURATE
 (ACCESS RAMP NOT SHOWN).
 23. DONE- PARTIALLY SATISFIED- PLEASE PROVIDE
 RENDERINGS WITHIN THE REAL CONTEXT, HOW IS THE PROJECT
 INSERTED ON THE SITE AND HOW IT WILL IMPACT THE
 PERCEPTION FROM THE STREET. THE SUBMITTED RENDERINGS
 ARE GOOD TO PROVIDE A VISUAL OF THE ENTIRE BUILDING,
 BUT ARE NOT ACCURATELY REFLECTING THE SCALE OF THE
 BUILDING IN RELATION TO THE STREET AND THE ADJACENT
 BUILDING (ROSEMAY SECTION). TAHT TYPE OF RENDERINGS ARE
 IMPORTANT FOR THE SPECIAL REVIEW APPROVAL- 1ST REVIEW:
 THE INTENTIONRENDERING IN SHEET R0-02 IS NOT ACCURATE
 IN THE PLACEMENT OF THE SURROUNDING BUILDINGS. ALL
 RENDERINGS SHALL ACCURATELY REFLECT THE EXISTING
 CONDITIONS OF THE SURROUNDING AREA.
 24. DONE- NOT SATISFIED- SUBMITTED ELEVATIONS ARE BLACK
 AND WHITE. - 1ST REVIEW: PLEASE INCLUDE NORTH AND EAST
 COLORED ELEVATIONS. PLEASE INDICATE SCALE ON ALL
 ELEVATIONS.
 25. NOT SATISFIED.- 1ST REVIEW: FOR THE DAC SPECIAL
 REVIEW FLOOR PLANS AND ELEVATIONS SHALL BE MORE
 DETAILED INDICATING LOCATION OF WINDOWS, BUILDING
 ENTRANCES AND BALCONIES. FACADE SHALL INCLUDE A CALL
 OUT FOR PROPOSED MATERIALS AND IMAGES OF THE PROPOSED
 MATERIALS. A MATERIAL BOARD WILL BE REQUIRED FOR THE
 HEARING.
 26. NOT SATISFIED - 1ST REVIEW: FOR DAC, COMPLIANCE
 WITH SPECIAL REVIEW STANDARDS SHALL BE DEMONSTRATED.
 27. DONE- PLEASE PROVIDE ELECTRONIC DRAWINGS (DXF OR
 CADD) TO ALLOW THE MEASUREMENT OF THE FAR AREA
 INDICATED IN SHEET A0.06.
 28. DONE - PLEASE ENSURE ALL THE DRAWINGS ARE PRINTED
 AT SCALE (SHEET A1.01 IS NOT AT SCALE). STAFF WAS NOT
 ABLE TO VERIFY ANY DIMENSION ON SUBMITTED DRAWINGS.
 29. DONE- PLEASE CORRECT FAR CALCULATION IN SHEET
 A1.01AND A0.01. ADDITIONAL FAR PERMITTED ON CWD-10/12
 IS ONLY 14,780SF. ADJUST TOTAL ALLOWED.
  
 SPECIAL REVIEW COMMENTS:
 1. PARTIALLY SATISFIED- THE TREATMENT AND SCALE OF THE
 1ST FLOOR ALONG ROSEMAY AVE DOES NOT RELATE TO THE
 SCALE OF ROSEMARY AVE, OR THE ADJACENT BUILDINGS. THE
 PROPOSED LARGE AWNINGS ARE NOT APPROPRIATE FOR THE
 HISTORIC DISTRICT.
 2. PARTIALLY SATISFIED- THE SCALE OF THE 1ST FLOOR
 SHALL BE LOWERED.
  
 HPB APPROVAL CONDITIONS SHALL BE INCORPORATED -
 COMMENTS FROM CITY'S HISTORIC PRESERVATION PLANNER:
 AFTER PRELIMINARILY REVIEWING THE PROPOSED PROJECT I
 OFFER THE FOLLOWING COMMENTS:
  
 1. ADDITION/NEW CONSTRUCTION IN HISTORIC DISTRICT
 REQUIRES APPROVAL BY THE HISTORIC PRESERVATION BOARD.
 2. PLANS ARE NOT DETAILED ENOUGH TO UNDERSTAND
 REHABILITATION EFFORTS ON EXISTING HISTORIC STRUCTURES,
 PLEASE PROVIDE CLARIFICATION.
 3. PROPOSED ADDITION DOES NOT COMPLY WITH SECTION
 94-49, SPECIFICALLY;
 SETTING, ORIENTATION AND SETBACKS IS NOT COMPATIBLE
 WITH DISTRICT UTILIZING INVERSE STEPPING OF BUILDING AS
 PROPOSED
 PROPORTION OF OPENINGS ARE NOT VISUALLY COMPATIBLE WITH
 SURROUNDING BUILDINGS
 RHYTHM OF SOLIDS TO VOIDS IS NOT VISUALLY COMPATIBLE
 AND
 THE SIZE, SCALE, MASS AND VOLUME OVERWHELMS THE
 EXISTING STRUCTURES.
 2. DETAILED PLANS OF SHORING/SUPPORT SHALL BE SUBMITTED