| Plan Review Notes For Project Z16020008 |
| Project Number |
Z16020008 |
|
| Review Stop |
PW |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2016-04-25 12:19:30 | THE FOLLOWING COMMENTS ARE BASED ON THE REVIEW OF THE | | | APRIL 8, 2016 PLAN SUBMITTAL TO PPRC: | | | 1. SHEET C-1 SHOWS WHAT APPEARS TO BE AN EASEMENT OVER | | | THE WATER MAIN. THIS IS INCONSISTENT WITH THE | | | ACKNOWLEDGEMENT OF THE ENGINEER THAT THE WATER SYSTEM | | | WILL BE MASTER METERED. | | | | | | 2. REVISE THE PROPOSED RETENTION AREA OR WATER MAIN | | | ROUTE SO THAT THE WATER MAIN DOES NOT CROSS THE STORM | | | RETENTION AREA. PERHAPS THE STORM RETENTION AREA CAN | | | INCLUDE INLET D-13 INSTEAD OF D-14, THEREBY ELIMINATING | | | THE 90 LF OF 36" RCP THAT WOULD BE REMOVED IN PHASE 2. | | | | | | 3. ENGINEER HAS ACKNOWLEDGED THE NORTH PARKING LOTS | | | NEED TO BE RE-GRADED TO DRAIN TO THE STORM INLETS | | | INSTEAD OF THE BACK OF THE PARKING SPACES. | | | | | | 4. GRADING OF PHASE 2 ROADWAY ALONG SOUTH PROPERTY LINE | | | NOT INCLUDED IN THIS SUBMITTAL. | | | | | | 5. GRADING PLAN FOR ENGINEERING PERMIT WILL NEED | | | ADDITIONAL PROPOSED GRADES FOR THE CORNERS OF THE | | | PARKING LOTS. | | | | | | 6. ENGINEER EMAILED AN AUTOTURN ANALYSIS DEMONSTRATING | | | THE DUMPSTER LOCATION CAN BE READILY SERVICED. | | | | | | 7. REQUIREMENTS LISTED UNDER THE ORIGINAL APPROVAL | | | STILL APPLY. | | | | | | TRACY L. WARD, P.E. | | | PUBLIC WORKS DEPARTMENT | | | [email protected] | | | (561) 494-1120 |
| |
Print |
|