| Date |
Text |
| 2016-03-08 01:03:28 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, |
| | COMMENTS: |
| | |
| | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE |
| | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH |
| | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE |
| | ADDRESSED FOR PERMITTING. |
| | |
| | 2. WHEN SUBMITTED FOR PERMIT, THE PLANS SHALL SHOW AT |
| | LEAST ONE ACCESSIBLE ROUTE, COMPLYING WITH SECTIONS |
| | 206.2 AND 402.2 OF FLORIDA ACCESSIBILITY CODE, FROM THE |
| | PUBLIC RIGHT-OF-WAY TO ALL ACCESSIBLE BUILDING OR |
| | FACILITY ENTRANCES. |
| | |
| | 3. SITE PLAN SHEET SP-1 SHOWS THAT 148 PARKING SPACES |
| | ARE PROPOSED, AND JUST 4 ACCESSIBLE PARKING SPACES ARE |
| | PROPOSED. 5 ACCESSIBLE PARKING SPACES ARE REQUIRES |
| | BECAUSE THE MINIMUM NUMBER OF ACCESSIBLE PARKING SPACES |
| | PROVIDED SHALL BE IN ACCORDANCE WITH SECTION 208.2 OF |
| | FLORIDA ACCESSIBILITY CODE. |
| | |
| | 4. WHE SUBMITTED FOR BUILDING PERMIT, THE PLANS SHALL |
| | SHOW THAT THE TYPE OF CONSTRUCTION FOR THE BUILDINGS |
| | WILL BE IN ACCORDANCE WITH THE HEIGHT, AREA AND |
| | OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE FLORIDA |
| | BUILDING CODE |
| | |
| | 5. WHEN SUBMITTED FOR BUILDING PERMIT, COMPLIANCE WITH |
| | ALL BUILDING SEPARATION, PERCENTAGE OF OPENINGS AND |
| | OPENING PROTECTIVE REQUIREMENTS OF CHAPTERS 6 AND 7 OF |
| | THE FLORIDA BUILDING CODE SHALL BE VERIFIED. |
| | |
| | 6. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS |
| | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE |
| | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED |
| | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, |
| | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND |
| | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, |
| | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. |
| | |
| | 7. EACH SEPARATE BUILDING SHALL HAVE A SEPARATE |
| | ADDRESS. FOR STREET ADDRESSING, CONTACT MICHAEL ORIO, |
| | GIS SUPPORT SPECIALIST, AT (561) 494 1080, OR BY EMAIL: |
| | [email protected] |
| | |
| | 8. THIS PROJECT WILL BE SUBJECT TO ART IN PUBLIC PLACES |
| | (AIPP) ASSESSMENT. FOR ADVICE ON THE PROVISION OF |
| | PUBLIC ARTWORK IN LIEU OF THE AIPP ASSESSMENT, CONTACT |
| | SYBILLE WELTER, ART IN PUBLIC PLACES COORDINATOR, AT |
| | (561) 822-1521, OR BY EMAIL: [email protected] |
| | |
| | ROBERT BROWN |
| | BUILDING OFFICIAL |
| | TEL: 561 805 6652 |
| | EMAIL: [email protected] |
| | |
| |
Print |