| Date |
Text |
| 2016-02-08 15:49:40 | CITY OF WEST PALM BEACH |
| | PUBLIC WORKS DEPARTMENT |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL. |
| | |
| | 1. PLEASE PROVIDE A NARRATIVE EXPLAINING THE NEED FOR |
| | THE DECLARATION. |
| | |
| | 2. DO THE NEW LOT LINES FOR TRACT B REQUIRE A |
| | MODIFICATION OF THE SITE PLAN? |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. A SEPARATE SUBMITTAL WILL BE REQUIRED TO THE |
| | ENGINEERING DIVISION OF THE PUBLIC WORKS DEPARTMENT FOR |
| | ENGINEERING DEVELOPMENT APPROVAL. THE ENGINEERING |
| | DEVELOPMENT APPROVAL APPLICATION FORMS CAN BE |
| | DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 2. A SEPARATE SUBMITTAL WILL BE REQUIRED TO THE |
| | ENGINEERING DIVISION OF THE PUBLIC WORKS DEPARTMENT FOR |
| | PLAT APPROVAL. PLEASE CONTACT VINCE NOEL AT |
| | [email protected] TO GET A COPY OF THE PLAT APPLICATION. |
| | FINAL PLAT APPROVAL WILL BE BASED ON THE APPROVED SITE |
| | PLAN. |
| | |
| | |
| | KELLY CRANFORD, P.E. |
| | CAPITAL IMPROVEMENT PLAN MANAGER |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |
| | VINCE NOEL, PSM |
| | CITY SURVEYOR / REAL ESTATE SUPERVISOR |
| | [email protected] |
| | 561-494-1096 |
| | |
| | BRIAN COLLINS, PE |
| | CITY TRAFFIC ENGINEER |
| | [email protected] |
| | 561-494-1040 |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | 561-494-1120 |
| | [email protected] |
| | |
| | |
| |
Print |