| 2016-02-04 14:22:39 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, |
| | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM |
| | BEACH FIRE RESCUE. |
| | |
| | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE |
| | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. |
| | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS |
| | ARE SUBMITTED FOR PERMIT. |
| | |
| | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE |
| | PROPOSED PROJECT. |
| | |
| | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY |
| | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE |
| | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A |
| | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED |
| | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN |
| | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY |
| | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER |
| | PROTECTION. |
| | |
| | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY |
| | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING |
| | ALL CONSTRUCTION ACTIVITIES. |
| | |
| | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM |
| | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. |
| | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND |
| | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT |
| | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. |
| | |
| | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE |
| | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE |
| | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. |
| | |
| | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH |
| | THE 5TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, |
| | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES |
| | INCLUDING, BUT NOT LIMITED TO, NFPA 1, CHAPTER 20, |
| | OCCUPANCY FIRE SAFETY, 20.2 EDUCATIONAL OCCUPANCIES AND |
| | NFPA 101, CHAPTER 14, NEW EDICATIONAL OCCUPANCIES. |
| | |
| | 6. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM IS |
| | REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP DRAWINGS, |
| | ARE REQUIRED TO BE SUBMITTED, REVIEWED AND APPROVED BY |
| | THE FIRE PREVENTION BUREAU PRIOR TO ANY INSTALLATION. |
| | |
| | HAS A FIRE LOAD CALCUALTION BEEN COMPLETED FOR THIS |
| | STRUCTURE AND COMPARED TO THE AVAILABLE WATER SUPPLY? |
| | |
| | IS A FIRE PUMP PROPOSED ? |
| | |
| | PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004, |
| | FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE |
| | POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF |
| | APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT, |
| | CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR |
| | AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER |
| | SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA) |
| | AND ANY PERFORMANCE BASED INFORMATION SUCH AS |
| | PRE-ENGINEERED SYSTEMS. |
| | |
| | 7. A CLASS A NFPA 72 COMPLIANT MONITORED FIRE ALARM |
| | SYSTEM IS REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP |
| | DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND |
| | APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY |
| | INSTALLATIO |
| | |
| | IS THERE A PROPOSED EMERGENCY POWER SUPPLY ? |
| | |
| | 8. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL |
| | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL |
| | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, |
| | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A |
| | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE |
| | SAFETY FEATURES AND EQUIPMENT. |
| | |
| | IS THERE A PROPOSED EMERGENCY POWER SUPPLY ? |
| | |
| | 9. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS |
| | BUILDING. |
| | |
| | ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS, |
| | PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS. |
| | |
| | 10. ALL KITCHEN EQUIPMENT AND OPERATIONS SHALL COMPLY |
| | WITH NFPA 96, STANDARD FOR VENTILATION CONTROL AND FIRE |
| | PROTECTION OF COMMERCIAL COOKING OPERATIONS. |
| | EXTINGUISHMENT AND VENTILATION SYSTEM SHOP DRAWINGS |
| | SHALL BE SUBMITTED SEPARATELY FOR APPROVAL. |
| | |
| | 11. ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE |
| | FIGHTER?S EMERGENCY OPERATIONS REQUIREMENTS OF ASME |
| | A17.1/CSA B44, SAFETY CODE FOR ELEVATORS. |
| | |
| | 12. ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH |
| | OR IN WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM |
| | TERMINAL LANDING AND THE TOP TERMINAL LANDING EXCEEDS |
| | 25 FEET MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE |
| | PASSENGER ELEVATOR THAT IS OPERATIONAL AND WILL |
| | ACCOMMODATE AN AMBULANCE STRETCHER 76 INCHES LONG AND |
| | 24 INCHES WIDE IN THE HORIZONTAL POSITION. |
| | |
| | 13. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS |
| | PROJECT SHALL BE CLEARLY INDICATED AND IDENTIFIED ON |
| | THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF |
| | FIRE PREVENTION. |
| | |
| | 14. ALL FIRE DEPARTMENT SPRINKLER SYSTEM CONNECTIONS |
| | (FDC,S) FOR THE PROJECT SHALL BE IDENTIFIED AND |
| | COORDINATED WITH THE BUREAU OF FIRE PREVENTION. |
| | |
| | THE FDC SHALL BE LOCATED WITHIN 150" OF A FIRE HYDRANT. |
| | |
| | 15. ALL FIRE WATER MAINS, SIZES AND THEIR VALVE |
| | ASSEMBLIES SHALL BE CLEARLY IDENTIFIED AND ILLUSTRATED |
| | ON THE PLAN. |
| | |
| | 16. PER FLORIDA 69A-60.0081; NOTICE SIGNAGE IS REQUIRED |
| | FOR STRUCTURES WITH LIGHT-FRAME TRUSS-TYPE |
| | CONSTRUCTION. ANY COMMERCIAL, INDUSTRIAL, OR ANY |
| | MULTIUNIT RESIDENTIAL STRUCTURE OF THREE UNITS OR MORE |
| | WHICH USES HORIZONTAL OR VERTICAL LIGHT-FRAME |
| | TRUSS-TYPE CONSTRUCTION IN ANY PORTION SHALL BE MARKED |
| | WITH A MALTESE CROSS SIGN MEASURING 8 INCHES |
| | HORIZONTALLY AND 8 INCHES VERTICALLY, OF A BRIGHT RED |
| | REFLECTIVE COLOR. THE APPROVED SYMBOL SHALL BE PLACED |
| | WITHIN 24 INCHES TO THE LEFT OF THE MAIN ENTRY DOOR. |
| | A. STRUCTURES WITH LIGHT-FRAME TRUSS ROOFS SHALL BE |
| | MARKED WITH THE LETTER "R". |
| | B. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR SYSTEMS |
| | SHALL BE MARKED WITH THE LETTER "F". |
| | C. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR AND ROOF |
| | SYSTEMS SHALL BE MARKED WITH THE LETTERS "R/F". |
| | |
| | 17. THE WIDTH OF THE DROP-OFF ENRTY AND EGRESS LANES |
| | INDICATES 12'; FOR USE OF FIRE APPARATUS/RESCUE |
| | VEHICLES 20' IS REQUIRED. |
| | |
| | PROVIDE 30' RADUIS CURB AT EACH CORNER FOR FD APPARATUS |
| | CLEARANCE. |
| | |
| | 18. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT |
| | DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. |
| | |
| | 19. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING |
| | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH |
| | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |
| | |
| |