| Date |
Text |
| 2016-01-13 09:38:42 | CITY OF WEST PALM BEACH |
| | PUBLIC WORKS DEPARTMENT |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL. |
| | |
| | 1. PLEASE SUBMIT A COPY OF THE PROPOSED UNITY OF |
| | CONTROL OR CROSS ACCESS AGREEMENT FOR APPROVAL BY THE |
| | CITY ATTORNEY DEPARTMENT. |
| | |
| | 2. PLEASE REVISE THE DRIVEWAY APRONS ON THE ALLEY TO |
| | MEET THE CITY?S ENGINEERING DESIGN STANDARDS. HTTP://WP |
| | B.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEERING-STAN |
| | DARDS/ |
| | |
| | 3. THE ALLEY WIDTH (12 FT) IS ONLY WIDE ENOUGH FOR |
| | ONE-WAY TRAFFIC. PLEASE SHOW THE LOCATION OF THE |
| | PROPOSED ONE-WAY SIGNAGE. |
| | |
| | 4. PLEASE SUBMIT UPDATED DRAINAGE CALCULATIONS THAT |
| | DEMONSTRATE THAT THE PROJECT WILL PROVIDE ADEQUATE |
| | DRAINAGE AND STORMWATER MANAGEMENT. COMPLIANCE WITH |
| | CHAPTER 40E-4 WILL DEMONSTRATE COMPLIANCE WITH THIS |
| | PROVISION [SECTIONS 90-201, 94-35(C )(11), AND 94-307]. |
| | |
| | 5. PER SECTION 2.21.2 OF THE CITY RIGHT OF WAY |
| | STANDARDS MANUAL, PROJECTS WHICH DISTURB 40% OR MORE OF |
| | A ROADWAY (LINEAR FOOTAGE) PER BLOCK WILL BE REQUIRED |
| | TO MILL AND RESURFACE THE ENTIRE BLOCK. PLEASE INCLUDE |
| | MILLING AND RESURFACING OF THE ALLEY FROM S DIXIE TO |
| | THE EASTERN PROPERTY LINE AND THE SOUTHERN SIDEWALK |
| | ALONG ROSEMARY ON THE CONSTRUCTION PLANS. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING DIVISION OF THE PUBLIC |
| | WORKS DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL |
| | APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | KELLY CRANFORD, P.E. |
| | PUBLIC WORKS CIP MANAGER |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |
| | VINCE NOEL, PSM |
| | CITY SURVEYOR / REAL ESTATE SUPERVISOR |
| | [email protected] |
| | 561-494-1096 |
| | |
| | BRIAN COLLINS, PE |
| | CITY TRAFFIC ENGINEER |
| | [email protected] |
| | 561-494-1040 |
| | |
| | FERDINAND RIVERA |
| | PUBLIC WORKS OPERATIONS MANAGER |
| | [email protected] |
| | 561-822-2076 |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | 561-494-1120 |
| | [email protected] |
| | |
| | |
| |