| 2016-03-11 08:35:34 | CITY OF WEST PALM BEACH | | | PUBLIC WORKS DEPARTMENT | | | | | | | | | A TRAFFIC STUDY IS REQUIRED FOR THIS PROJECT SHOWING | | | HOW THE PROPOSED DEVELOPMENT WILL AFFECT THE TRAFFIC | | | VOLUME AND SURROUNDING LOCAL ROADWAYS. RESULTS SHOULD | | | JUSTIFY THE PROPOSED TWO-WAY TRAFFIC ON 2ND STREET, | | | WHICH IS CURRENTLY ONE-WAY WEST BOUND. INCLUDE TRAFFIC | | | ACCIDENT DATA FOR AFFECTED STREET CORRIDORS AND A | | | TRAFFIC CIRCULATION ANALYSIS. DATA COLLECTION WILL | | | INCLUDE COMPLETE 4 HOUR INTERSECTION TURNING MOVEMENT | | | COUNTS FOR AM AND PM PEAK HOURS FOR THE FOLLOWING | | | INTERSECTIONS: 2ND STREET/ROSEMARY AVENUE, 2ND STREET / | | | SAPODILLA AVENUE, AND BANYAN BLVD / ROSEMARY AVENUE. | | | INTERSECTION AND OPERATIONAL CONDUCT AN ANALYSIS AND | | | REVIEW BASED ON TRAFFIC DIVERSION TO 2ND STREET BASED | | | ON THE CONVERSION TO TWO-WAY CIRCULATION. SAFETY | | | IMPROVEMENTS SHALL BE RECOMMENDED WHERE NECESSARY. | | | | | | CONDITIONS OF RECOMMENDATION FOR SITE PLAN APPROVAL. | | | | | | 1. A MAINTENANCE AGREEMENT IS REQUIRED FOR THE | | | NON-STANDARD ELEMENTS (TREES AND TREE GRATES; PAVERS, | | | ETC.) PROPOSED WITHIN CITY RIGHT-OF-WAY. | | | | | | 2. UTILITY CONNECTION LOCATIONS AND CONFIGURATIONS WILL | | | REQUIRE APPROVAL OF THE CITY?S PUBLIC UTILITIES | | | ENGINEER. | | | | | | 3. THE APPLICANT IS REQUIRED TO MILL AND RESURFACE 2ND | | | STREET AND THE ALLEY. | | | | | | |
| |
Print |
|