Plan Review Notes
Plan Review Notes For Project Z15110014
Project Number Z15110014
Review Stop ENG - PPRC
Sequence Number 2
Notes
Date Text
2016-03-11 08:35:34CITY OF WEST PALM BEACH
 PUBLIC WORKS DEPARTMENT
  
  
 A TRAFFIC STUDY IS REQUIRED FOR THIS PROJECT SHOWING
 HOW THE PROPOSED DEVELOPMENT WILL AFFECT THE TRAFFIC
 VOLUME AND SURROUNDING LOCAL ROADWAYS. RESULTS SHOULD
 JUSTIFY THE PROPOSED TWO-WAY TRAFFIC ON 2ND STREET,
 WHICH IS CURRENTLY ONE-WAY WEST BOUND. INCLUDE TRAFFIC
 ACCIDENT DATA FOR AFFECTED STREET CORRIDORS AND A
 TRAFFIC CIRCULATION ANALYSIS. DATA COLLECTION WILL
 INCLUDE COMPLETE 4 HOUR INTERSECTION TURNING MOVEMENT
 COUNTS FOR AM AND PM PEAK HOURS FOR THE FOLLOWING
 INTERSECTIONS: 2ND STREET/ROSEMARY AVENUE, 2ND STREET /
 SAPODILLA AVENUE, AND BANYAN BLVD / ROSEMARY AVENUE.
 INTERSECTION AND OPERATIONAL CONDUCT AN ANALYSIS AND
 REVIEW BASED ON TRAFFIC DIVERSION TO 2ND STREET BASED
 ON THE CONVERSION TO TWO-WAY CIRCULATION. SAFETY
 IMPROVEMENTS SHALL BE RECOMMENDED WHERE NECESSARY.
  
 CONDITIONS OF RECOMMENDATION FOR SITE PLAN APPROVAL.
  
 1. A MAINTENANCE AGREEMENT IS REQUIRED FOR THE
 NON-STANDARD ELEMENTS (TREES AND TREE GRATES; PAVERS,
 ETC.) PROPOSED WITHIN CITY RIGHT-OF-WAY.
  
 2. UTILITY CONNECTION LOCATIONS AND CONFIGURATIONS WILL
 REQUIRE APPROVAL OF THE CITY?S PUBLIC UTILITIES
 ENGINEER.
  
 3. THE APPLICANT IS REQUIRED TO MILL AND RESURFACE 2ND
 STREET AND THE ALLEY.
  
  