| 2016-01-20 10:35:42 | 2ND REVIEW RESPONSE |
| | |
| | AFTER A REVIEW OF THE PPRC RESPONSE DOCUMENTS DATED |
| | JANUARY 7, 2016, FROM ANA MARIA APONTE, CITY URBAN |
| | DESIGNER, THE PREVIOUSLY SUBMITTED FIRE PREVENTION |
| | BUREAU COMMENTS REMAIN CONSTRUCTION PLAN REVIEW |
| | RELATED. |
| | |
| | THE FOLLOWING COMMENTS ARE RE- SUBMITTED TO HIGHLIGHT |
| | SIGNIFICANT REVIEW POINTS OF LIFE SAFETY THAT NEED TO |
| | BE ADDRESSED WITH THE BUILDING PLAN SUBMITTAL. |
| | |
| | 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A, |
| | PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE, |
| | INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE |
| | OCCUPANCIES (PARKING STRUCTURES) |
| | IF THE VEHICLE IN THE VEHICLE ELEVATOR IS OCCUPIED, IT |
| | SHALL BE PROVIDED WITH A FIRE & LIFE SAFETY PROTECTION |
| | SYSTEM. |
| | |
| | 16. THE 7TH FLOOR OPEN-AIRTERRACE AREA APPEARS TO |
| | REQUIRE A SECOND EXIT. A DETAILED ANALYSIS IS REQUIRED. |
| | |
| | 17. THE 14TH FLOOR LEVEL APPEARS TO REQUIRE A THIRD |
| | EXIT. A DETAILED ANALYSIS IS REQUIRED. |
| | |
| | 18. COMMAND ROOM |
| | |
| | PLEASE SWAP THE LOCATION OF THE FIRE CONTROL ROOM WITH |
| | THE EMERGENCY POWER ROOM AND PROVIDE A MAN-DOOR TO THE |
| | ROOM, NOT A ROLL-UP DOOR. THIS ALLOWS FOR GREATER FD |
| | OPERATIONAL CREW ACCESS |
| | |
| | 19. RADIO |
| | |
| | PLEASE ENSURE THIS REQUIRMENT IS MET AND TESTED. |
| | |
| | THE BUREAU'S HAS NO OBJECTION TO THE PROJECT AND |
| | APPROVAL OF THIS SUBMITTED PROJECT DOES NOT CONSTITUTE |
| | IT'S FINAL REVIEW OR APPROVAL. |
| | |
| | THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT |
| | THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE |
| | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. |
| | |
| | |