| Date |
Text |
| 2015-10-14 08:15:40 | CITY OF WEST PALM BEACH |
| | PUBLIC WORKS DEPARTMENT |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | BUILDING PERMIT APPLICATION PROCESSES. |
| | |
| | 1. SITE PLAN DOES NOT CONTAIN ENOUGH INFORMATION TO |
| | EVALUATE THE PROPOSED DESIGN. |
| | |
| | 2. PLEASE SHOW THE LOCATION OF THE PROPOSED DUMPSTER |
| | ENCLOSURE. THE ENCLOSURE SHOULD MEET THE MINIMUM |
| | DIMENSIONAL REQUIREMENTS FOR THE ENCLOSURE AS LISTED IN |
| | CODE OF ORDINANCES, SECTION 94-444(B), ALSO SEE FIGURE |
| | XIV-3 OF THE SAME SECTION. |
| | |
| | 3. THE WATER QUALITY TREATMENT FOR THE PREVIOUS CAR |
| | WASH WAS TREATED IN A 540 GALLON SAND TRAP NEAR THE |
| | SOUTHERN PROPERTY LINE. WHAT IS THE CONDITION OF THE |
| | TRAP? |
| | |
| | 4. PLEASE VERIFY THAT THE PREVIOUSLY APPROVED DRAINAGE |
| | SYSTEM, WHICH DIRECTED RUNOFF TO THE CENTER OF THE |
| | PROJECT, IS STILL IN PLACE AND IN GOOD CONDITION. |
| | |
| | 5. WILL THE WASH WATER BE RECYCLED? THE WATER CANNOT BE |
| | DIRECTED TO THE SANITY SYSTEM WITHOUT THE INSTALLATION |
| | OF AN INTERCEPTOR (ORDINANCE 90-125). WASH WATER MAY |
| | NOT BE DIRECTED TO THE STORMWATER SYSTEM. PREFERABLY, |
| | THE WASH WATER SHOULD BE COLLECTED IN A WASH PIT AND |
| | DISPOSED OF BY AN INDUSTRIAL WASTE COMPANY. |
| | |
| | 6. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE |
| | AVAILABLE AT HTTP://WWW.CO.PALM-BEACH.FL.US/NEWSROOM/08 |
| | 14/08-26-14-FLOOD_MAPS.HTM. PLEASE REVIEW THE MAPS AND |
| | VERIFY THAT THE NEW MAPS WILL NOT IMPACT THE PROPOSED |
| | PROJECT. |
| | |
| | 7. THE SUBMITTED SURVEY DOES NOT APPEAR TO BE COMPLETE |
| | AND ACCURATE. PLEASE REFER TO FDOT MAINTENANCE MAPS FOR |
| | BROADWAY. PROPERTY CORNERS ARE MISSING. THE PROPERTY |
| | LINE IS SHOW TO INCLUDE THE SIDEWALK ON THE WEST SIDE |
| | OF BROADWAY. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. A UNITY OF TITLE APPLICATION WILL BE REQUIRED FROM |
| | THE ENGINEERING DIVISION OF THE PUBLIC WORKS |
| | DEPARTMENT. THE APPLICATION FOR UNITY OF TITLE CAN BE |
| | DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 2. DETAILS SHEETS WILL NEED TO UTILIZE STANDARD CITY OF |
| | WEST PALM BEACH DETAILS, WHICH MAY BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | KELLY CRANFORD, P.E. |
| | LAND DEVELOPMENT ENGINEER |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |
| | VINCE NOEL, PSM |
| | CITY SURVEYOR / REAL ESTATE SUPERVISOR |
| | [email protected] |
| | 561-494-1096 |
| | |
| | BRIAN COLLINS, PE |
| | CITY TRAFFIC ENGINEER |
| | [email protected] |
| | 561-494-1040 |
| | |
| | FERDINAND RIVERA |
| | PUBLIC WORKS OPERATIONS MANAGER |
| | [email protected] |
| | 561-822-2076 |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | 561-494-1120 |
| | [email protected] |
| |
Print |