| 2015-10-13 14:51:26 | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND |
| | PROVIDE THE FOLLOWING COMMENTS: |
| | |
| | 1. PLEASE PROVIDE A TREE SURVEY IDENTIFYING EXISTING |
| | TREES ON THE PROPERTY AND INDICATE THE SPECIES, SIZE, |
| | AND IF THEY WILL BE REMOVED, RELOCATED, OR REMAIN. |
| | PLEASE PROVIDE A MITIGATION CHART TO REFLECT THE TREE |
| | INVENTORY, AND PROVIDE PERTINENT INFORMATION FOR EACH |
| | TREE PER SECTION 94-448 (E) INCLUDING SPECIES, CANOPY |
| | SIZE AND REPLACEMENT REQUIREMENT FOR ANY TREES PROPOSED |
| | TO BE REMOVED. |
| | |
| | 2. PLEASE PROVIDE THE REQUIRED OPEN SPACE CALCULATION |
| | TO REFLECT THE REQUIRED 40 PERCENT OF THE TOTAL SITE |
| | AREA AND PROVIDE ALL REQUIRED SHADE AND FLOWERING TREE |
| | AND SHRUB CALCULATIONS PER SECTION 94-442. |
| | |
| | 3. PLEASE REMOVE REFERENCES TO SECTION 94-113, AS THIS |
| | IS NOT APPLICABLE. |
| | |
| | 4. TREES, PALMS AND SHRUBS PROPOSED TO BE PLANTED IN |
| | THE RIGHT OF WAY CANNOT BE COUNTED TOWARD ON SITE |
| | REQUIREMENTS. PLEASE PROVIDE A SEPARATE PLANT LIST FOR |
| | ANY OFF SITE LANDSCAPING. |
| | |
| | 5. PLEASE PROVIDE THE REQUIRED TREES FOR ALL LANDSCAPE |
| | BUFFERS ON SITE PER SECTION 94-443. |
| | |
| | 6. A LANDSCAPE ISLAND MUST BE PROVIDED ON THE NORTH END |
| | OF THE ROW OF PARKING ALONG THE WEST SIDE OF THE |
| | BUILDING PER SECTION 94-443(C)(3). |
| | |
| | 7. PLEASE PROVIDE A SCREENING HEDGE ON THE WEST SIDE OF |
| | THE DUMPSTER ENCLOSURE. |
| | |
| | 8. PLEASE SHOW COMPLIANCE WITH SECTION 94-443(C)(3) AND |
| | (4) TO PROVIDE THE REQUIRED LANDSCAPE AREAS WITHIN THE |
| | PARKING AREAS BASED ON PARKING SPACES AND OTHER PAVED |
| | AREAS. |
| | |
| | 9. PLEASE SHOW COMPLIANCE WITH SECTION 94-443(E) AND |
| | PROVIDE LANDSCAPING FOR AT LEAST 30 PERCENT OF THE |
| | LINEAR FEET AROUND THE EXTERIOR OF THE BUILDING. |
| | |
| | |
| | |
| | 10. PLEASE PROVIDE A ROOT BARRIER DETAIL AND SHOW |
| | LOCATIONS OF ROOT BARRIERS TO PROTECT INFRASTRUCTURE |
| | AND TREES FROM CONFLICTS. THIS INCLUDES WATER, SEWER, |
| | DRAINAGE, SIDEWALKS AND CURBS, AND ANY FIELD STRUCTURES |
| | THAT COULD BE IMPACTED BY TREE ROOTS. |
| | |
| | 11. PLEASE SHOW ALL UTILITIES INCLUDING FPL, WATER, |
| | SEWER, AND DRAINAGE ON THE LANDSCAPE PLAN. PLEASE |
| | PROVIDE SCREENING FOR ALL GROUND MOUNTED EQUIPMENT AND |
| | UTILITIES. |
| | |
| | PLEASE UNDERSTAND THAT ADDITIONAL INFORMATION MAY BE |
| | REQUESTED, AND STAFF MAY HAVE ADDITIONAL COMMENTS AS |
| | THE REVIEW PROCESS CONTINUES. |
| | |
| | CONDITIONS OF APPROVAL |
| | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON |
| | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE |
| | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT |
| | SERVICES DEPARTMENT, PLANNING DIVISION. |
| | |
| | RAY CARANCI, LANDSCAPE PLANNER |
| | 561-822-1462 |
| | |
| | |
| | |
| |