| 2015-10-13 12:01:11 | CITY OF WEST PALM BEACH |
| | PUBLIC WORKS DEPARTMENT |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL. |
| | |
| | 1. PLEASE SUBMIT ESTIMATES FOR THE PEAK POTABLE WATER |
| | DEMAND, SANITARY SEWER FLOW, AND SOLID WASTE COLLECTION |
| | YARDAGE. |
| | |
| | 2. A TRAFFIC STUDY WILL BE REQUIRED FOR THIS PROJECT |
| | SHOWING HOW THE PROPOSED DEVELOPMENT WILL AFFECT THE |
| | TRAFFIC VOLUME AND SURROUNDING LOCAL ROADWAYS. INCLUDE |
| | TRAFFIC ACCIDENT DATA FOR AFFECTED STREET CORRIDORS. |
| | ESTIMATE INCREASED OR DECREASED POTENTIAL. SAFETY |
| | IMPROVEMENTS SHALL BE RECOMMENDED WHERE NECESSARY. |
| | PLEASE SCHEDULE A MEETING WITH THE CITY TRAFFIC |
| | ENGINEER (BRIAN COLLINS) TO DETERMINE THE SCOPE OF THE |
| | REQUIRED STUDY. |
| | |
| | 3. PLEASE REVISE THE DRIVEWAY APRONS TO MEET THE CITY?S |
| | ENGINEERING DESIGN STANDARDS. HTTP://WPB.ORG/ENGINEERIN |
| | G/ENGINEERING-SERVICES/ENGINEERING-STANDARDS/ |
| | |
| | 4. THE CITY DOES NOT ALLOW UNSIGNALIZED, DOUBLE LEFT |
| | TURN LANES AT EXITS. THE WEAVING DISTANCE IS TOO SHORT |
| | AND THE CLEAR PATH IS NOT READILY APPARENT, WHICH |
| | CONFUSES DRIVERS AND REDUCES THEIR ABILITY TO SAFELY |
| | NAVIGATE THE TURN. PLEASE REVISE THE PLAN TO SHOW A |
| | SINGLE TURN LANE ONTO SOUTH DIXIE. |
| | |
| | 5. APPROVAL FROM THE FLORIDA DEPARTMENT OF |
| | TRANSPORTATION (FDOT) FOR THE PROPOSED EXIT ON |
| | QUADRILLE BOULEVARD. |
| | |
| | 6. THE STRIPING AND MARKING PLAN MUST INCLUDE SIGN(S) |
| | ON THE ALLEY NOTIFYING DRIVERS THAT ALLEY IS ONE-WAY |
| | ONLY. IF TWO-WAY TRAFFIC ON THE ALLEY IS PROPOSED, THE |
| | ALLEY MUST BE WIDENED TO A MINIMUM WIDTH OF 20 FEET. |
| | |
| | 7. A MAINTENANCE AGREEMENT WILL BE REQUIRED FOR THE |
| | NON-STANDARD ELEMENTS (TREES AND TREE GRATES; PAVERS, |
| | ETC.) PROPOSED WITHIN GARDENIA RIGHT-OF-WAY. |
| | |
| | 8. PLEASE PROVIDE AN AUTOTURN ANALYSIS DEMONSTRATING |
| | THE SOLID WASTE COLLECTION VEHICLE CAN ACCESS THE |
| | PROPOSED DUMPSTER AND COMPACTOR LOCATIONS. THE TRASH |
| | DUMPSTER/COMPACTORS MUST LOCATED IN AREAS EASILY |
| | SERVICED BY THE CITY SANITATION EQUIPMENT AND MANPOWER |
| | PER SECTION 74-35(A)(5) OF THE CODE OF ORDINANCES. IF A |
| | ROLL-OFF COMPACTOR IS PROPOSED, PLEASE PROVIDE A LETTER |
| | FROM THE PRIVATE PROVIDER VERIFYING THAT THEY CAN |
| | PROVIDE SERVICE WITH THE CONFIGURATION SHOWN ON THE |
| | PLANS. |
| | |
| | 9. PROVIDE VERTICAL PROFILES FOR THE PARKING GARAGE |
| | RAMPS INCLUDING THE TRANSITION AREA GEOMETRY. |
| | |
| | 10. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE |
| | AVAILABLE AT HTTP://WWW.CO.PALM-BEACH.FL.US/NEWSROOM/08 |
| | 14/08-26-14-FLOOD_MAPS.HTM. PLEASE REVIEW THE MAPS AND |
| | VERIFY THAT THE NEW MAPS WILL NOT IMPACT THE PROPOSED |
| | PROJECT. |
| | |
| | 11. PLEASE SHOW THE SIGHT TRIANGLES ON THE GROUND FLOOR |
| | LANDSCAPING PLAN FOR THE INTERSECTIONS AND VEHICULAR |
| | EXITS. (SECTION 94-305E, CODE OF ORDINANCES) |
| | |
| | 12. PER SECTION 2.21.2 OF THE CITY RIGHT OF WAY |
| | STANDARDS MANUAL, PROJECTS WHICH DISTURB 40% OR MORE OF |
| | A ROADWAY (LINEAR FOOTAGE) PER BLOCK WILL BE REQUIRED |
| | TO MILL AND RESURFACE THE ENTIRE BLOCK. PLEASE SCHEDULE |
| | A MEETING WITH THE CITY?S TRAFFIC ENGINEER TO FINALIZE |
| | THE DESIGN OF GARDENIA AND THE ALLEY. |
| | |
| | 13. PLEASE SHOW THE EXISTING DRIVEWAYS ON THE SOUTH |
| | SIDE OF GARDENIA. CONSIDER ALIGNING THE ENTRANCES / |
| | EXITS WITH THE EXISTING CURB CUTS. |
| | |
| | 14. A MAINTENANCE AGREEMENT WILL BE REQUIRED FOR THE |
| | NON-STANDARD ELEMENTS (PAVERS AND LANDSCAPING) PROPOSED |
| | WITHIN THE GARDENIA STREET RIGHTS-OF-WAY. |
| | |
| | 15. PLEASE REVISE THE ELEVATION SHEET TO SHOW ALL |
| | CANOPIES, CORNICES AND OTHER FEATURES WHICH PROJECT |
| | FROM THE BUILDING FACE. |
| | |
| | 16. THE SUBMITTED SURVEY DOES NOT APPEAR TO BE COMPLETE |
| | AND ACCURATE. PLEASE REFER TO FDOT MAINTENANCE MAPS FOR |
| | DIXIE AND QUADRILLE. |
| | |
| | 17. DUE TO DIFFICULTY MAINTAINING AND REPLACING |
| | UTILITIES WITHIN NARROW ALLEYS WITHOUT IMPACTING |
| | ADJACENT BUILDINGS, NEW WATER OR SEWER CONNECTION ARE |
| | NOT PERMITTED WITHIN CITY ALLEYS. PLEASE REVISE THE |
| | DESIGN TO CONNECT TO THE EXISTING WATER AND SEWER |
| | SYSTEMS ALONG THE MAIN ROADWAYS. |
| | |
| | 18. THE SUBMITTED NARRATIVE STATES THAT THE PROPOSED |
| | PROJECT IS A 17-STORY BUILDING. THE PLANS SHOW 18 |
| | STORIES. PLEASE CORRECT THE NARRATIVE TO MATCH THE |
| | PLANS. |
| | |
| | 19. THE PARKING LAYOUT CONTAINS SEVERAL DEAD-ENDS |
| | (ACCESSIBLE PARKING SPACES ON SHEET A1, STANDARD |
| | PARKING ON SHEETS A4 THROUGH A10) WHICH DO NOT MEET |
| | CODE REQUIREMENTS. TURN AROUND SPACES MUST BE PROVIDED |
| | AT THE DEAD ENDS. SHOW PROFILE DETAILS FOR ANY PARKING |
| | SPOTS PROPOSED UNDER RAMPS. REVISE THE PARKING LAYOUT |
| | TO COMPLY WITH SECTIONS 94-111 AND 94-485 OF THE CODE |
| | OF ORDINANCES |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING DIVISION OF THE PUBLIC |
| | WORKS DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL |
| | APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 2. A SEPARATE SUBMITTAL WILL BE REQUIRED TO THE |
| | ENGINEERING DIVISION OF THE PUBLIC WORKS DEPARTMENT FOR |
| | PLAT APPROVAL. PLEASE CONTACT VINCE NOEL AT |
| | [email protected] TO GET A COPY OF THE PLAT APPLICATION. |
| | |
| | 3. A SEPARATE SUBMITTAL WILL BE REQUIRED TO THE |
| | ENGINEERING DIVISION OF THE PUBLIC WORKS DEPARTMENT FOR |
| | THE AERIAL / FOOTER ENCROACHMENT AGREEMENT. PLEASE |
| | CONTACT VINCE NOEL AT [email protected] TO GET A COPY OF |
| | THE APPLICATION. |
| | |
| | KELLY CRANFORD, P.E. |
| | LAND DEVELOPMENT ENGINEER |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |
| | VINCE NOEL, PSM |
| | CITY SURVEYOR / REAL ESTATE SUPERVISOR |
| | [email protected] |
| | 561-494-1096 |
| | |
| | BRIAN COLLINS, PE |
| | CITY TRAFFIC ENGINEER |
| | [email protected] |
| | 561-494-1040 |
| | |
| | FERDINAND RIVERA |
| | PUBLIC WORKS OPERATIONS MANAGER |
| | [email protected] |
| | 561-822-2076 |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | 561-494-1120 |
| | [email protected] |
| | |
| |