| 2015-10-09 12:49:32 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, |
| | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM |
| | BEACH FIRE RESCUE. |
| | |
| | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE |
| | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. |
| | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS |
| | ARE SUBMITTED FOR PERMIT. |
| | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE |
| | PROPOSED PROJECT. |
| | |
| | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY |
| | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE |
| | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A |
| | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED |
| | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN |
| | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY |
| | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER |
| | PROTECTION. |
| | |
| | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY |
| | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING |
| | ALL CONSTRUCTION ACTIVITIES. |
| | |
| | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM |
| | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. |
| | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND |
| | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT |
| | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. |
| | |
| | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE |
| | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE |
| | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. |
| | |
| | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH |
| | THE 5TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, |
| | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. |
| | |
| | 6. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA |
| | 14, CLASS 1, COMPLIANT WET STANDPIPE SYSTEM ARE |
| | REQUIRED FOR THIS STRUCTURE. TEMPORARY STANDPIPES ARE |
| | REQUIRED WHEN THE BUILDING REACHES THREE LEVELS OR |
| | THIRTY FEET WHILE BEING CONSTRUCTED. SEPARATE SHOP |
| | DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND |
| | APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY |
| | INSTALLATION. |
| | |
| | 7. FIRE SPRINKLER SYSTEM SHALL BE MONITORED BY AN |
| | APPROVED SUPERVISING STATION IN ACCORDANCE WITH NFPA |
| | 72. SEPARATE SHOP DRAWINGS, ARE REQUIRED TO BE |
| | SUBMITTED, REVIEWED AND APPROVED BY THE FIRE PREVENTION |
| | BUREAU PRIOR TO ANY INSTALLATION. |
| | |
| | 8. ALL PORTABLE FIRE EXTINGUISHERS LOCATIONS SHALL BE |
| | CLEARLY IDENTIFIED AND INDICATED ON THE PLAN. |
| | |
| | 9. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS |
| | BUILDING. |
| | |
| | 10. ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH |
| | OR IN WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM |
| | TERMINAL LANDING AND THE TOP TERMINAL LANDING EXCEEDS |
| | 25 FEET MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE |
| | PASSENGER ELEVATOR THAT IS OPERATIONAL AND WILL |
| | ACCOMMODATE AN AMBULANCE STRETCHER 76 INCHES LONG AND |
| | 24 INCHES WIDE IN THE HORIZONTAL POSITION. |
| | |
| | 11. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL |
| | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL |
| | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, |
| | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A |
| | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE |
| | SAFETY FEATURES AND EQUIPMENT. |
| | |
| | 12. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS |
| | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED |
| | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF |
| | FIRE PREVENTION. |
| | |
| | 13. ALL FIRE DEPARTMENT SPRINKLER SYSTEM CONNECTIONS |
| | (FDC,S) FOR THE PROJECT SHALL BE IDENTIFIED AND |
| | COORDINATED WITH THE BUREAU OF FIRE PREVENTION. |
| | |
| | 14. ALL FIRE WATER MAINS, SIZES AND THEIR VALVE |
| | ASSEMBLIES SHALL BE CLEARLY IDENTIFIED AND ILLUSTRATED |
| | ON THE PLAN. |
| | |
| | 15. THE PROPOSED 15' FIRE LANE IS NOT APPROVED. ALL |
| | FIRE LANES SHALL BE 20' WITH A 30' TURNING RADIUS. |
| | |
| | 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT |
| | DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. |
| | |
| | 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING |
| | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH |
| | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. |
| | |
| | |
| | |
| |