| 2015-10-14 08:26:12 | CITY OF WEST PALM BEACH |
| | PUBLIC WORKS DEPARTMENT |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | BUILDING PERMIT APPLICATION PROCESSES. |
| | |
| | 1. PLEASE SUBMIT ESTIMATES FOR THE PEAK POTABLE WATER |
| | DEMAND, SANITARY SEWER FLOW, AND SOLID WASTE COLLECTION |
| | YARDAGE. |
| | |
| | 2. PLEASE REVISE THE DRIVEWAY APRONS TO MEET THE CITY?S |
| | ENGINEERING DESIGN STANDARDS. PLEASE ALSO INCLUDE THE |
| | DETAILS FOR THE SIDEWALK RAMPS, HTTP://WPB.ORG/ENGINEER |
| | ING/ENGINEERING-SERVICES/ENGINEERING-STANDARDS/ |
| | |
| | 3. PRELIMINARY ENGINEERING PLANS (WATER, SEWER, PAVING, |
| | AND DRAINAGE) WERE NOT SUBMITTED. WATER AND SEWER |
| | CONNECTION LOCATIONS SHOWN ON THE PLANTING PLAN ARE NOT |
| | APPROVED. |
| | |
| | 4. PLEASE REVISE THE LANDSCAPE PLAN TO SHOW LOCATIONS |
| | OF ALL WATER METERS, VALVES, CLEAN-OUTS, LIGHT POLES, |
| | ETC. ROOT BARRIERS MAY BE REQUIRED WHERE PLANTINGS ARE |
| | NEAR UNDERGROUND STORMWATER, SANITARY, OR POTABLE WATER |
| | LINES. ALSO CLEARLY INDICATE ALL EXISTING AND PROPOSED |
| | EASEMENTS ON THE LANDSCAPE PLAN. |
| | |
| | 5. PLEASE SHOW THE SIGHT TRIANGLES (20 FT X 20 FT) ON |
| | THE LANDSCAPING PLAN FOR THE INTERSECTIONS AND |
| | VEHICULAR EXITS. (SECTION 94-305E, CODE OF ORDINANCES) |
| | |
| | 6. PLEASE REVISE THE DUMPSTER TO MEET THE MINIMUM |
| | DIMENSIONAL REQUIREMENTS FOR THE ENCLOSURE AS LISTED IN |
| | CODE OF ORDINANCES, SECTION 94-444(B), ALSO SEE FIGURE |
| | XIV-3 OF THE SAME SECTION. |
| | |
| | 7. PLEASE PROVIDE AN AUTOTURN ANALYSIS DEMONSTRATING |
| | THE SOLID WASTE COLLECTION VEHICLE CAN ACCESS THE |
| | PROPOSED DUMPSTER AND COMPACTOR LOCATIONS. THE TRASH |
| | DUMPSTER/COMPACTORS MUST LOCATED IN AREAS EASILY |
| | SERVICED BY THE CITY SANITATION EQUIPMENT AND MANPOWER |
| | PER SECTION 74-35(A)(5) OF THE CODE OF ORDINANCES. |
| | |
| | 8. PALM BEACH COUNTY APPROVAL OF THE PROPOSED |
| | STORMWATER CONNECTION WILL BE REQUIRED PRIOR TO FINAL |
| | SITE PLAN APPROVAL. |
| | |
| | 9. THE PLANTING PLAN (L-2) SHOWS STORMWATER BEING |
| | CONVEYED THROUGH THE SITE THROUGH A NEW OFF-SITE |
| | STRUCTURE. PLEASE EXPLAIN THE PROPOSED STORMWATER |
| | SYSTEM DESIGN. |
| | |
| | 10. THE SUBMITTED PARKING DETAIL (SHEET PSP-1) DOES NOT |
| | MATCH THE PLAN VIEW. ARE WHEEL STOPS PROPOSED OR WILL |
| | RAISED CURBS BE USED? |
| | |
| | 11. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE |
| | AVAILABLE AT HTTP://WWW.CO.PALM-BEACH.FL.US/NEWSROOM/08 |
| | 14/08-26-14-FLOOD_MAPS.HTM. PLEASE REVIEW THE MAPS AND |
| | VERIFY THAT THE NEW MAPS WILL NOT IMPACT THE PROPOSED |
| | PROJECT. |
| | |
| | 12. PLEASE VERIFY THAT A 20-FT WIDE ACCESS IS NOT |
| | REQUIRED FOR EMERGENCY ACCESS TO THE REAR OF THE |
| | BUILDING. |
| | |
| | 13. SHOW PROPOSED SIDEWALK CONNECTING TO THE EXISTING |
| | SIDEWALK AT THE SOUTHERN PROPERTY LINE. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. A SEPARATE SUBMITTAL WILL BE REQUIRED TO THE |
| | ENGINEERING DIVISION OF THE PUBLIC WORKS DEPARTMENT FOR |
| | ENGINEERING DEVELOPMENT APPROVAL. THE ENGINEERING |
| | DEVELOPMENT APPROVAL APPLICATION FORMS CAN BE |
| | DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 2. A UNITY OF TITLE APPLICATION WILL BE REQUIRED FROM |
| | THE ENGINEERING DIVISION OF THE PUBLIC WORKS |
| | DEPARTMENT. THE APPLICATION FOR UNITY OF TITLE CAN BE |
| | DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 3. SOLID WASTE YARDAGE WILL NEED TO BE ESTIMATED AS |
| | PART OF THE FINAL DESIGN TO VERIFY THAT THE DESIGN |
| | INCLUDES APPROPRIATE NUMBER AND SIZE OF TRASH BINS. |
| | |
| | 4. IDENTIFY THE SOURCE OF THE AS-BUILT INFORMATION |
| | UTILIZED FOR THE POTABLE WATER, SANITARY SEWER, AND |
| | STORM SEWER DESIGN. |
| | |
| | 5. DETAILS SHEETS WILL NEED TO UTILIZE STANDARD CITY OF |
| | WEST PALM BEACH DETAILS, WHICH MAY BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | KELLY CRANFORD, P.E. |
| | LAND DEVELOPMENT ENGINEER |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |
| | VINCE NOEL, PSM |
| | CITY SURVEYOR / REAL ESTATE SUPERVISOR |
| | [email protected] |
| | 561-494-1096 |
| | |
| | BRIAN COLLINS, PE |
| | CITY TRAFFIC ENGINEER |
| | [email protected] |
| | 561-494-1040 |
| | |
| | FERDINAND RIVERA |
| | PUBLIC WORKS OPERATIONS MANAGER |
| | [email protected] |
| | 561-822-2076 |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | 561-494-1120 |
| | [email protected] |
| | |
| |